Florida Senate - 2005                      COMMITTEE AMENDMENT
    Bill No. SB 2074
                        Barcode 151814
                            CHAMBER ACTION
              Senate                               House
                                   .                    
                                   .                    
 1                                 .                    
                                   .                    
 2                                 .                    
                                   .                    
 3                                 .                    
                                   .                    
 4  ______________________________________________________________
 5  
 6  
 7  
 8  
 9  
10  ______________________________________________________________
11  The Committee on Environmental Preservation (Constantine)
12  recommended the following amendment:
13  
14         Senate Amendment (with title amendment) 
15         On page 19, between lines 12 and 13,
16  
17  insert:  
18         Section 13.  Subsection (1) of section 366.075, Florida
19  Statutes, is amended to read:
20         366.075  Experimental and transitional rates.--
21         (1)  The commission is authorized to approve rates on
22  an experimental or transitional basis for any public utility
23  to encourage energy conservation, or to encourage efficiency,
24  or use of energy from a renewable energy resource, as that
25  term is defined in s. 377.703(2).  The application of such
26  rates may be for limited geographic areas and for a limited
27  period.
28  
29  (Redesignate subsequent sections.)
30  
31  
                                  1
    11:55 AM   03/29/05                             s2074.ep22.003

Florida Senate - 2005 COMMITTEE AMENDMENT Bill No. SB 2074 Barcode 151814 1 ================ T I T L E A M E N D M E N T =============== 2 And the title is amended as follows: 3 On page 2, line 18, after taken; 4 5 insert: 6 amending s. 366.075, F.S.; authorizing the 7 Public Service Commission to approve 8 experimental or transitional rates to encourage 9 the use of renewable energy; 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 2 11:55 AM 03/29/05 s2074.ep22.003