4Remove lines 2561-2584 and insert:
5     3.  A description of and a nonbinding estimate of the cost
6of the nuclear power plant, including the cost for waste
7disposal and a comparison of costs for other fuel sources and
8energy efficiency.
9     4.  The annualized base revenue requirement for the first
1012 months of operation of the nuclear power plant.
11     5.  Information on whether there were any discussions with
12any electric utilities regarding ownership of a portion of the
13plant by such electric utilities.
14     (b)  In making its determination, the commission shall take
15into account matters within its jurisdiction, which it deems
16relevant, including whether the nuclear power plant will:
17     1.  Provide needed base-load capacity.
18     2.  Enhance the reliability of electric power production
19within the state by improving the balance of power plant fuel
20diversity and reducing Florida's dependence on fuel oil and
21natural gas.
22     3.  Provide the most cost-effective source of power
23including conservation and efficiency measures, taking into
24account the need to improve the balance of fuel diversity,
25reduce Florida's dependence on fuel oil and natural gas, reduce
26air emission compliance costs, and contribute to the long-term
27stability and reliability of the electric grid.
28     (c)  Rule 25-22.082, Florida Administrative Code, shall be
29applicable to a nuclear power plant sited under this act,
30including provisions for cost recovery, and an applicant shall
31be required to secure competitive