HB 1473CS

CHAMBER ACTION




1The Fiscal Council recommends the following:
2
3     Council/Committee Substitute
4     Remove the entire bill and insert:
5
6
A bill to be entitled
7An act relating to energy; providing legislative findings
8and intent; creating s. 377.801, F.S.; creating the
9"Florida Renewable Energy Technologies and Energy
10Efficiency Act"; creating s. 377.802, F.S.; stating the
11purpose of the act; creating s. 377.803, F.S.; providing
12definitions; creating s. 377.804, F.S.; creating the
13Renewable Energy Technologies Grants Program; providing
14program requirements and procedures, including matching
15funds; requiring the Department of Environmental
16Protection to adopt rules and coordinate with the
17Department of Agriculture and Consumer Services; requiring
18joint departmental approval for the funding of any
19project; creating s. 377.805, F.S.; establishing an
20energy-efficient products sales tax holiday; specifying a
21period during which the sale of energy-efficient products
22is exempt from certain tax; providing a limitation;
23providing a definition; prohibiting purchase of products
24by certain payment methods; providing that certain
25purchases or attempts to purchase are unfair methods of
26competition and punishable as such; creating s. 377.806,
27F.S.; creating the Solar Energy System Incentives Program;
28providing program requirements, procedures, and
29limitations; requiring the Department of Environmental
30Protection to adopt rules; creating s. 377.901, F.S.;
31creating the Florida Energy Council within the Department
32of Environmental Protection; providing purpose and
33composition; providing for appointment of members and
34terms; providing for reimbursement for travel expenses and
35per diem; requiring the department to provide certain
36services to the council; providing rulemaking authority;
37amending s. 212.08, F.S.; providing definitions for the
38terms "biodiesel," "ethanol," and "hydrogen fuel cells";
39providing tax exemptions in the form of a rebate for the
40sale or use of certain equipment, machinery, and other
41materials for renewable energy technologies; providing
42eligibility requirements and tax credit limits; directing
43the Department of Revenue to adopt rules; directing the
44Department of Environmental Protection to determine and
45publish certain information relating to such exemptions;
46providing for expiration of the exemption; amending s.
47213.053, F.S.; authorizing the Department of Revenue to
48share certain information with the Department of
49Environmental Protection for specified purposes; amending
50s. 220.02, F.S.; providing the order of application of the
51renewable energy technologies investment tax credit;
52creating s. 220.192, F.S.; providing definitions;
53establishing a corporate tax credit for certain costs
54related to renewable energy technologies; providing
55eligibility requirements and credit limits; providing
56certain authority to the Department of Environmental
57Protection and the Department of Revenue; directing the
58Department of Environmental Protection to determine and
59publish certain information; providing for expiration of
60the tax credit; amending s. 220.13, F.S.; providing an
61addition to the definition of "adjusted federal income";
62amending s. 186.801, F.S.; revising the provisions of
63electric utility 10-year site plans to include the effect
64on fuel diversity; amending s. 366.04, F.S.; revising the
65safety standards for public utilities; amending s. 366.05,
66F.S.; authorizing the Public Service Commission to adopt
67certain construction standards and make certain
68determinations; directing the commission to conduct a
69study and provide a report by a certain date; amending s.
70403.503, F.S.; revising and providing definitions
71applicable to the Florida Electrical Power Plant Siting
72Act; amending s. 403.504, F.S.; providing the Department
73of Environmental Protection with additional powers and
74duties relating to the Florida Electrical Power Plant
75Siting Act; amending s. 403.5055, F.S.; revising
76provisions for certain permits associated with
77applications for electrical power plant certification;
78amending s. 403.506, F.S.; revising provisions relating to
79applicability and certification of certain power plants;
80amending s. 403.5064, F.S.; revising provisions for
81distribution of applications and schedules relating to
82certification; amending s. 403.5065, F.S.; revising
83provisions relating to the appointment of administrative
84law judges and specifying their powers and duties;
85amending s. 403.5066, F.S.; revising provisions relating
86to the determination of completeness for certain
87applications; creating s. 403.50663, F.S.; authorizing
88certain local governments and regional planning councils
89to hold an informational public meeting about a proposed
90electrical power plant or associated facilities; providing
91requirements and procedures therefor; creating s.
92403.50665, F.S.; requiring local governments to file
93certain land use determinations; providing requirements
94and procedures therefor; repealing s. 403.5067, F.S.,
95relating to the determination of sufficiency for certain
96applications; amending s. 403.507, F.S.; revising required
97preliminary statement provisions for affected agencies;
98requiring a report as a condition precedent to the project
99analysis and certification hearing; amending s. 403.508,
100F.S.; revising provisions relating to land use and
101certification hearings, including cancellation and
102responsibility for payment of expenses and costs;
103requiring certain notice; amending s. 403.509, F.S.;
104revising provisions relating to the final disposition of
105certain applications; providing requirements and
106provisions with respect thereto; amending s. 403.511,
107F.S.; revising provisions relating to the effect of
108certification for the construction and operation of
109proposed electrical power plants; providing that issuance
110of certification meets certain coastal zone consistency
111requirements; creating s. 403.5112, F.S.; requiring filing
112of notice for certified corridor routes; providing
113requirements and procedures with respect thereto; creating
114s. 403.5113, F.S.; authorizing postcertification
115amendments for power plant site certification
116applications; providing requirements and procedures with
117respect thereto; amending s. 403.5115, F.S.; requiring
118certain public notice for activities relating to
119electrical power plant site application, certification,
120and land use determination; providing requirements and
121procedures with respect thereto; directing the Department
122of Environmental Protection to maintain certain lists and
123provide copies of certain publications; amending s.
124403.513, F.S.; revising provisions for judicial review of
125appeals relating to electrical power plant site
126certification; amending s. 403.516, F.S.; revising
127provisions relating to modification of certification for
128electrical power plant sites; amending s. 403.517, F.S.;
129revising provisions relating to supplemental applications
130for sites certified for ultimate site capacity; amending
131s. 403.5175, F.S.; revising provisions relating to
132existing electrical power plant site certification;
133revising the procedure for reviewing and processing
134applications; requiring additional information to be
135included in certain applications; amending s. 403.518,
136F.S.; revising the allocation of proceeds from certain
137fees collected; providing for reimbursement of certain
138expenses; directing the Department of Environmental
139Protection to establish rules for determination of certain
140fees; eliminating certain operational license fees;
141providing for the application, processing, approval, and
142cancellation of electrical power plant certification;
143amending s. 403.519, F.S.; directing the Public Service
144Commission to consider fuel diversity and reliability in
145certain determinations; amending 403.885, F.S.; revising
146provisions and requirements relating to the stormwater
147management, wastewater management, and water restoration
148grants program; providing an appropriation; providing an
149effective date.
150
151Be It Enacted by the Legislature of the State of Florida:
152
153     Section 1.  Legislative findings and intent.--The
154Legislature finds that advancing the development of renewable
155energy technologies and energy efficiency is important for the
156state's future, its energy stability, and the protection of its
157citizens' public health and its environment. The Legislature
158finds that the development of renewable energy technologies and
159energy efficiency in the state will help to reduce demand for
160foreign fuels, promote energy diversity, enhance system
161reliability, reduce pollution, educate the public on the promise
162of renewable energy technologies, and promote economic growth.
163The Legislature finds that there is a need to assist in the
164development of market demand that will advance the
165commercialization and widespread application of renewable energy
166technologies. The Legislature further finds that the state is
167ideally positioned to stimulate economic development through
168such renewable energy technologies due to its ongoing and
169successful research and development track record in these areas,
170an abundance of natural and renewable energy sources, an ability
171to attract significant federal research and development funds,
172and the need to find and secure renewable energy technologies
173for the benefit of its citizens, visitors, and environment.
174     Section 2.  Section 377.801, Florida Statutes, is created
175to read:
176     377.801  Short title.--Sections 377.801-377.806 may be
177cited as the "Florida Renewable Energy Technologies and Energy
178Efficiency Act."
179     Section 3.  Section 377.802, Florida Statutes, is created
180to read:
181     377.802  Purpose.--This act is intended to provide matching
182grants to stimulate capital investment in the state and to
183enhance the market for and promote the statewide utilization of
184renewable energy technologies. The targeted grants program is
185designed to advance the already growing establishment of
186renewable energy technologies in the state and encourage the use
187of other incentives such as tax exemptions and regulatory
188certainty to attract additional renewable energy technology
189producers, developers, and users to the state. This act is also
190intended to provide incentives for the purchase of energy-
191efficient appliances and rebates for solar energy equipment
192installations for residential and commercial buildings.
193     Section 4.  Section 377.803, Florida Statutes, is created
194to read:
195     377.803  Definitions.--As used in ss. 377.801-377.806, the
196term:
197     (1)  "Act" means the Florida Renewable Energy Technologies
198and Energy Efficiency Act.
199     (2)  "Approved metering equipment" means a device capable
200of measuring the energy output of a solar thermal system that
201has been approved by the commission.
202     (3)  "Commission" means the Florida Public Service
203Commission.
204     (4)  "Department" means the Department of Environmental
205Protection.
206     (5)  "Person" means an individual, partnership, joint
207venture, private or public corporation, association, firm,
208public service company, or any other public or private entity.
209     (6)  "Renewable energy" means electrical, mechanical, or
210thermal energy produced from a method that uses one or more of
211the following fuels or energy sources: hydrogen, biomass, solar
212energy, geothermal energy, wind energy, ocean energy, waste
213heat, or hydroelectric power.
214     (7)  "Renewable energy technology" means any technology
215that generates or utilizes a renewable energy resource.
216     (8)  "Solar energy system" means equipment that provides
217for the collection and use of incident solar energy for water
218heating, space heating or cooling, or other applications that
219require a conventional source of energy such as petroleum
220products, natural gas, or electricity that performs primarily
221with solar energy. In other systems in which solar energy is
222used in a supplemental way, only those components that collect
223and transfer solar energy shall be included in this definition.
224     (9)  "Solar photovoltaic system" means a device that
225converts incident sunlight into electrical current.
226     (10)  "Solar thermal system" means a device that traps heat
227from incident sunlight in order to heat water.
228     Section 5.  Section 377.804, Florida Statutes, is created
229to read:
230     377.804  Renewable Energy Technologies Grants Program.--
231     (1)  The Renewable Energy Technologies Grants Program is
232established within the department to provide renewable energy
233matching grants for demonstration, commercialization, research,
234and development projects relating to renewable energy
235technologies.
236     (2)  Matching grants for renewable energy technology
237demonstration, commercialization, research, and development
238projects may be made to any of the following:
239     (a)  Municipalities and county governments.
240     (b)  Established for-profit companies licensed to do
241business in the state.
242     (c)  Universities and colleges in the state.
243     (d)  Utilities located and operating within the state.
244     (e)  Not-for-profit organizations.
245     (f)  Other qualified persons, as determined by the
246department.
247     (3)  The department may adopt rules pursuant to ss.
248120.536(1) and 120.54 to provide for application requirements,
249provide for ranking of applications, and administer the awarding
250of grants under this program.
251     (4)  Factors the department shall consider in awarding
252grants include, but are not limited to:
253     (a)  The availability of matching funds or other in-kind
254contributions applied to the total project from an applicant.
255The department shall give greater preference to projects that
256provide such matching funds or other in-kind contributions.
257     (b)  The degree to which the project stimulates in-state
258capital investment and economic development in metropolitan and
259rural areas, including the creation of jobs and the future
260development of a commercial market for renewable energy
261technologies.
262     (c)  The extent to which the proposed project has been
263demonstrated to be technically feasible based on pilot project
264demonstrations, laboratory testing, scientific modeling, or
265engineering or chemical theory that supports the proposal.
266     (d)  The degree to which the project incorporates an
267innovative new technology or an innovative application of an
268existing technology.
269     (e)  The degree to which a project generates thermal,
270mechanical, or electrical energy by means of a renewable energy
271resource that has substantial long-term production potential.
272     (f)  The degree to which a project demonstrates efficient
273use of energy and material resources.
274     (g)  The degree to which the project fosters overall
275understanding and appreciation of renewable energy technologies.
276     (h)  The ability to administer a complete project.
277     (i)  Project duration and timeline for expenditures.
278     (j)  The geographic area in which the project is to be
279conducted in relation to other projects.
280     (k)  The degree of public visibility and interaction.
281     (5)  The department shall solicit the expertise of other
282state agencies in evaluating project proposals. State agencies
283shall cooperate with the Department of Environmental Protection
284and provide such assistance as required.
285     (6)  The department shall coordinate and actively consult
286with the Department of Agriculture and Consumer Services during
287the review and approval process of grants relating to bioenergy
288projects for renewable energy technology, and the departments
289shall jointly determine the grant awards to these bioenergy
290projects. No grant funding shall be awarded to any bioenergy
291project without such joint approval. Factors for consideration
292in awarding grants may include, but are not limited to, the
293degree to which:
294     (a)  The project stimulates in-state capital investment and
295economic development in metropolitan and rural areas, including
296the creation of jobs and the future development of a commercial
297market for bioenergy.
298     (b)  The project produces bioenergy from Florida-grown
299crops or biomass.
300     (c)  The project demonstrates efficient use of energy and
301material resources.
302     (d)  The project fosters overall understanding and
303appreciation of bioenergy technologies.
304     (e)  Matching funds and in-kind contributions from an
305applicant are available.
306     (f)  The project duration and the timeline for expenditures
307are acceptable.
308     (g)  The project has a reasonable assurance of enhancing
309the value of agricultural products or will expand agribusiness
310in the state.
311     (h)  Preliminary market and feasibility research has been
312conducted by the applicant or others and shows there is a
313reasonable assurance of a potential market.
314     Section 6.  Section 377.805, Florida Statutes, is created
315to read:
316     377.805  Energy-efficient products sales tax holiday.--The
317period from 12:01 a.m., October 5, through midnight, October 11,
3182006, shall be designated "Energy Efficiency Week," and the tax
319levied under chapter 212 may not be collected on the sale of a
320new energy-efficient product having a selling price of $1,500 or
321less per product during that period. This exemption applies only
322when the energy-efficient product is purchased for noncommercial
323home or personal use and does not apply when the product is
324purchased for trade, business, or resale. As used in this
325section, the term "energy-efficient product" means a dishwasher,
326clothes washer, air conditioner, ceiling fan, incandescent or
327florescent light bulb, dehumidifier, programmable thermostat, or
328refrigerator that has been designated by the United States
329Environmental Protection Agency or by the United States
330Department of Energy as meeting or exceeding the requirements
331under the Energy Star Program of either agency. Purchases made
332under this section may not be made using a business or company
333credit or debit card or check. Any construction company,
334building contractor, or commercial business or entity that
335purchases or attempts to purchase the energy-efficient products
336as exempt under this section commits an unfair method of
337competition in violation of s. 501.204, punishable as provided
338in s. 501.2075.
339     Section 7.  Section 377.806, Florida Statutes, is created
340to read:
341     377.806  Solar Energy System Incentives Program.--
342     (1)  PURPOSE.--The Solar Energy System Incentives Program
343is established within the department to provide financial
344incentives for the purchase and installation of solar energy
345systems. Any resident of the state who purchases and installs a
346new solar energy system of 2 kilowatts or larger for a solar
347photovoltaic system, a solar energy system that provides at
348least 50 percent of a building's hot water consumption for a
349solar thermal system, or a solar thermal pool heater, from July
3501, 2006, through June 30, 2010, is eligible for a rebate on a
351portion of the purchase price of that solar energy system.
352     (2)  SOLAR PHOTOVOLTAIC SYSTEM INCENTIVE.--
353     (a)  Eligibility requirements.--A solar photovoltaic system
354qualifies for a rebate if:
355     1.  The system is installed by a state-licensed master
356electrician, electrical contractor, or solar contractor.
357     2.  The system complies with state interconnection
358standards as provided by the commission.
359     3.  The system complies with all applicable building codes
360as defined by the local jurisdictional authority.
361     (b)  Rebate amounts.--The rebate amount shall be set at $4
362per watt based on the total wattage rating of the system. The
363maximum allowable rebate per solar photovoltaic system
364installation shall be as follows:
365     1.  Twenty thousand dollars for a residence.
366     2.  One hundred thousand dollars for a place of business, a
367publicly owned or operated facility, or a facility owned or
368operated by a private, not-for-profit organization, including
369condominiums or apartment buildings.
370     (3)  SOLAR THERMAL SYSTEM INCENTIVE.--
371     (a)  Eligibility requirements.--A solar thermal system
372qualifies for a rebate if:
373     1.  The system is installed by a state-licensed solar or
374plumbing contractor.
375     2.  The system complies with all applicable building codes
376as defined by the local jurisdictional authority.
377     (b)  Rebate amounts.--Authorized rebates for installation
378of solar thermal systems shall be as follows:
379     1.  Five hundred dollars for a residence.
380     2.  Fifteen dollars per 1,000 Btu for a maximum of $5,000
381for a place of business, a publicly owned or operated facility,
382or a facility owned or operated by a private, not-for-profit
383organization, including condominiums or apartment buildings. Btu
384must be verified by approved metering equipment.
385     (4) SOLAR THERMAL POOL HEATER INCENTIVE.--
386     (a)  Eligibility requirements.--A solar thermal pool heater
387qualifies for a rebate if the system is installed by a
388state-licensed solar or plumbing contractor and the system
389complies with all applicable building codes as defined by the
390local jurisdictional authority.
391     (b)  Rebate amount.--Authorized rebates for installation of
392solar thermal pool heaters shall be $100 per installation.
393     (5)  APPLICATION.--Application for a rebate must be made
394within 90 days after the purchase of the solar energy equipment.
395     (6)  REBATE AVAILABILITY.--The department shall determine
396and publish on a regular basis the amount of rebate funds
397remaining in each fiscal year. The total dollar amount of all
398rebates issued by the department is subject to the total amount
399of appropriations in any fiscal year for this program. If funds
400are insufficient during the current fiscal year, any requests
401for rebates received during that fiscal year may be processed
402during the following fiscal year. Requests for rebates received
403in a fiscal year that are processed during the following fiscal
404year shall be given priority over requests for rebates received
405during the following fiscal year.
406     (7)  RULES.--The department shall adopt rules pursuant to
407ss. 120.536(1) and 120.54 to develop rebate applications and
408administer the issuance of rebates.
409     Section 8.  Section 377.901, Florida Statutes, is created
410to read:
411     377.901  Florida Energy Council.--
412     (1)  The Florida Energy Council is created within the
413Department of Environmental Protection to provide advice and
414counsel to the Governor, the President of the Senate, and the
415Speaker of the House of Representatives on the energy policy of
416the state. The council shall advise the state on current and
417projected energy issues, including, but not limited to,
418transportation, generation, transmission, distributed
419generation, fuel supply issues, emerging technologies,
420efficiency, and conservation. In developing its recommendations,
421the council shall be guided by the principles of reliability,
422efficiency, affordability, and diversity.
423     (2)(a)  The council shall be comprised of a diversity of
424stakeholders and may include utility providers, alternative
425energy providers, researchers, environmental scientists, fuel
426suppliers, technology manufacturers, persons representing
427environmental, consumer, and public health interests, and
428others.
429     (b)  The council shall consist of nine voting members as
430follows:
431     1.  The Secretary of Environmental Protection, or his or
432her designee, who shall serve as chair of the council.
433     2.  The chair of the Public Service Commission, or his or
434her designee, who shall serve as vice chair of the council.
435     3.  One member shall be the Commissioner of Agriculture, or
436his or her designee.
437     4.  Two members who shall be appointed by the Governor.
438     5.  Two members who shall be appointed by the President of
439the Senate.
440     6.  Two members who shall be appointed by the Speaker of
441the House of Representatives.
442     (c)  All initial members shall be appointed prior to
443September 1, 2006. Appointments made by the Governor, the
444President of the Senate, and the Speaker of the House of
445Representatives shall be for terms of 2 years each. Members
446shall serve until their successors are appointed. Vacancies
447shall be filled in the manner of the original appointment for
448the remainder of the term that is vacated.
449     (d)  Members shall serve without compensation but are
450entitled to reimbursement for travel expenses and per diem
451related to council duties and responsibilities pursuant to s.
452112.061.
453     (3)  The department shall provide primary staff support to
454the council and shall ensure that council meetings are
455electronically recorded. Such recording shall be preserved
456pursuant to chapters 119 and 257.
457     (4)  The department may adopt rules pursuant to ss.
458120.536(1) and 120.54 to implement the provisions of this
459section.
460     Section 9.  Paragraph (ccc) is added to subsection (7) of
461section 212.08, Florida Statutes, to read:
462     212.08  Sales, rental, use, consumption, distribution, and
463storage tax; specified exemptions.--The sale at retail, the
464rental, the use, the consumption, the distribution, and the
465storage to be used or consumed in this state of the following
466are hereby specifically exempt from the tax imposed by this
467chapter.
468     (7)  MISCELLANEOUS EXEMPTIONS.--Exemptions provided to any
469entity by this chapter do not inure to any transaction that is
470otherwise taxable under this chapter when payment is made by a
471representative or employee of the entity by any means,
472including, but not limited to, cash, check, or credit card, even
473when that representative or employee is subsequently reimbursed
474by the entity. In addition, exemptions provided to any entity by
475this subsection do not inure to any transaction that is
476otherwise taxable under this chapter unless the entity has
477obtained a sales tax exemption certificate from the department
478or the entity obtains or provides other documentation as
479required by the department. Eligible purchases or leases made
480with such a certificate must be in strict compliance with this
481subsection and departmental rules, and any person who makes an
482exempt purchase with a certificate that is not in strict
483compliance with this subsection and the rules is liable for and
484shall pay the tax. The department may adopt rules to administer
485this subsection.
486     (ccc)  Equipment, machinery, and other materials for
487renewable energy technologies.--
488     1.  As used in this paragraph, the term:
489     a.  "Biodiesel" means the mono-alkyl esters of long-chain
490fatty acids derived from plant or animal matter for use as a
491source of energy and meeting the specifications for biodiesel
492and biodiesel blends with petroleum products as adopted by the
493Department of Agriculture and Consumer Services. Biodiesel may
494refer to biodiesel blends designated BXX, where XX represents
495the volume percentage of biodiesel fuel in the blend.
496     b.  "Ethanol" means nominally anhydrous denatured alcohol
497produced by the fermentation of plant sugars meeting the
498specifications for fuel ethanol and fuel ethanol blends with
499petroleum products as adopted by the Department of Agriculture
500and Consumer Services. Ethanol may refer to fuel ethanol blends
501designated EXX, where XX represents the volume percentage of
502fuel ethanol in the blend.
503     c.  "Hydrogen fuel cells" means equipment using hydrogen or
504a hydrogen-rich fuel in an electrochemical process to generate
505energy, electricity, or the transfer of heat.
506     2.  The sale or use of the following in the state is exempt
507from the tax imposed by this chapter:
508     a.  Hydrogen-powered vehicles, materials incorporated into
509hydrogen-powered vehicles, and hydrogen-fueling stations, up to
510a limit of $2 million in taxes each state fiscal year.
511     b.  Commercial stationary hydrogen fuel cells, up to a
512limit of $1 million in taxes each state fiscal year.
513     c.  Materials used in the distribution of biodiesel (B10-
514B100) and ethanol (E10-E85), including fueling infrastructure,
515transportation, and storage, up to a limit of $1 million in
516taxes each state fiscal year. Gasoline fueling station pump
517retrofits for ethanol (E10-E100) distribution qualify for the
518exemption provided in this sub-subparagraph.
519     3.  The Department of Environmental Protection shall
520provide to the department a list of items eligible for the
521exemption provided in this paragraph.
522     4.a.  The exemption provided in this paragraph shall be
523available to a purchaser only through a refund of previously
524paid taxes.
525     b.  To be eligible to receive the exemption provided in
526this paragraph, a purchaser shall file an application with the
527Department of Environmental Protection. The application shall be
528developed by the Department of Environmental Protection, in
529consultation with the department, and shall require:
530     (I)  The name and address of the person claiming the
531refund.
532     (II)  A specific description of the purchase for which a
533refund is sought, including, when applicable, a serial number or
534other permanent identification number.
535     (III)  The sales invoice or other proof of purchase showing
536the amount of sales tax paid, the date of purchase, and the name
537and address of the sales tax dealer from whom the property was
538purchased.
539     (IV)  A sworn statement that the information provided is
540accurate and that the requirements of this paragraph have been
541met.
542     c.  Within 30 days after receipt of an application, the
543Department of Environmental Protection shall review the
544application and shall notify the applicant of any deficiencies.
545Upon receipt of a completed application, the Department of
546Environmental Protection shall evaluate the application for
547exemption and issue a written certification that the applicant
548is eligible for a refund or issue a written denial of such
549certification within 60 days after receipt of the application.
550The Department of Environmental Protection shall provide the
551department with a copy of each certification issued upon
552approval of an application.
553     d.  Each certified applicant shall be responsible for
554forwarding a certified copy of the application and copies of all
555required documentation to the department within 6 months after
556certification by the Department of Environmental Protection.
557     e.  The provisions of s. 212.095 do not apply to any refund
558application made pursuant to this paragraph. A refund approved
559pursuant to this paragraph shall be made within 30 days after
560formal approval by the department.
561     f.  The department shall adopt rules governing the manner
562and form of refund applications and may establish guidelines as
563to the requisites for an affirmative showing of qualification
564for exemption under this paragraph.
565     g.  The Department of Environmental Protection shall be
566responsible for ensuring that the exemptions do not exceed the
567limits provided in subparagraph 2.
568     5.  The Department of Environmental Protection shall
569determine and publish on a regular basis the amount of sales tax
570funds remaining in each fiscal year.
571     6.  This paragraph expires July 1, 2010.
572     Section 10.  Paragraph (y) is added to subsection (7) of
573section 213.053, Florida Statutes, to read:
574     213.053  Confidentiality and information sharing.--
575     (7)  Notwithstanding any other provision of this section,
576the department may provide:
577     (y)  Information relative to ss. 212.08(7)(ccc) and 220.192
578to the Department of Environmental Protection for use in the
579conduct of its official business.
580
581Disclosure of information under this subsection shall be
582pursuant to a written agreement between the executive director
583and the agency. Such agencies, governmental or nongovernmental,
584shall be bound by the same requirements of confidentiality as
585the Department of Revenue. Breach of confidentiality is a
586misdemeanor of the first degree, punishable as provided by s.
587775.082 or s. 775.083.
588     Section 11.  Subsection (8) of section 220.02, Florida
589Statutes, is amended to read:
590     220.02  Legislative intent.--
591     (8)  It is the intent of the Legislature that credits
592against either the corporate income tax or the franchise tax be
593applied in the following order: those enumerated in s. 631.828,
594those enumerated in s. 220.191, those enumerated in s. 220.181,
595those enumerated in s. 220.183, those enumerated in s. 220.182,
596those enumerated in s. 220.1895, those enumerated in s. 221.02,
597those enumerated in s. 220.184, those enumerated in s. 220.186,
598those enumerated in s. 220.1845, those enumerated in s. 220.19,
599those enumerated in s. 220.185, and those enumerated in s.
600220.187, and those enumerated in s. 220.192.
601     Section 12.  Section 220.192, Florida Statutes, is created
602to read:
603     220.192  Renewable energy technologies investment tax
604credit.--
605     (1)  DEFINITIONS.--For purposes of this section, the term:
606     (a)  "Biodiesel" means biodiesel as defined in s.
607212.08(7)(ccc).
608     (b)  "Eligible costs" means:
609     1.  Seventy-five percent of all capital costs, operation
610and maintenance costs, and research and development costs
611incurred between July 1, 2006, and June 30, 2010, up to a limit
612of $3 million per state fiscal year for all taxpayers, in
613connection with an investment in hydrogen-powered vehicles and
614hydrogen vehicle fueling stations in the state, including, but
615not limited to, the costs of constructing, installing, and
616equipping such technologies in the state.
617     2.  Seventy-five percent of all capital costs, operation
618and maintenance costs, and research and development costs
619incurred between July 1, 2006, and June 30, 2010, up to a limit
620of $1.5 million per state fiscal year for all taxpayers, and
621limited to a maximum of $12,000 per fuel cell, in connection
622with an investment in commercial stationary hydrogen fuel cells
623in the state, including, but not limited to, the costs of
624constructing, installing, and equipping such technologies in the
625state.
626     3.  Seventy-five percent of all capital costs, operation
627and maintenance costs, and research and development costs
628incurred between July 1, 2006, and June 30, 2010, up to a limit
629of $6.5 million per state fiscal year for all taxpayers, in
630connection with an investment in the production, storage, and
631distribution of biodiesel (B10-B100) and ethanol (E10-E100) in
632the state, including the costs of constructing, installing, and
633equipping such technologies in the state. Gasoline fueling
634station pump retrofits for ethanol (E10-E100) distribution
635qualify as an eligible cost under this subparagraph.
636     (c)  "Ethanol" means ethanol as defined in s.
637212.08(7)(ccc).
638     (d)  "Hydrogen fuel cell" means hydrogen fuel cell as
639defined in s. 212.08(7)(ccc).
640     (2)  TAX CREDIT.--For tax years beginning on or after
641January 1, 2007, a credit against the tax imposed by this
642chapter shall be granted in an amount equal to the eligible
643costs. Credits may be used in tax years beginning January 1,
6442007, and ending December 31, 2010, after which the credit shall
645expire. If the credit is not fully used in any one tax year
646because of insufficient tax liability on the part of the
647corporation, the unused amount may be carried forward and used
648in tax years beginning January 1, 2007, and ending December 31,
6492012, after which the credit carryover expires and may not be
650used. A taxpayer that files a consolidated return in this state
651as a member of an affiliated group under s. 220.131(1) may be
652allowed the credit on a consolidated return basis up to the
653amount of tax imposed upon the consolidated group. Any eligible
654cost for which a credit is claimed and which is deducted or
655otherwise reduces federal taxable income shall be added back in
656computing adjusted federal income under s. 220.13.
657     (3)  APPLICATION PROCESS.--Any corporation wishing to
658obtain tax credits available under this section must submit to
659the Department of Environmental Protection an application for
660tax credit that includes a complete description of all eligible
661costs for which the corporation is seeking a credit and a
662description of the total amount of credits sought. The
663Department of Environmental Protection shall make a
664determination on the eligibility of the applicant for the
665credits sought and certify the determination to the applicant
666and the Department of Revenue. The corporation must attach the
667Department of Environmental Protection's certification to the
668tax return on which the credit is claimed. The Department of
669Environmental Protection shall be responsible for ensuring that
670the corporate income tax credits granted in each fiscal year do
671not exceed the limits provided for in this section. The
672Department of Environmental Protection is authorized to adopt
673the necessary rules, guidelines, and application materials for
674the application process.
675     (4)  ADMINISTRATION; AUDIT AUTHORITY; RECAPTURE OF
676CREDITS.--
677     (a)  In addition to its existing audit and investigation
678authority, the Department of Revenue may perform any additional
679financial and technical audits and investigations, including
680examining the accounts, books, and records of the tax credit
681applicant, that are necessary to verify the eligible costs
682included in the tax credit return and to ensure compliance with
683this section. The Department of Environmental Protection shall
684provide technical assistance when requested by the Department of
685Revenue on any technical audits or examinations performed
686pursuant to this section.
687     (b)  It is grounds for forfeiture of previously claimed and
688received tax credits if the Department of Revenue determines, as
689a result of either an audit or examination or from information
690received from the Department of Environmental Protection, that a
691taxpayer received tax credits pursuant to this section to which
692the taxpayer was not entitled. The taxpayer is responsible for
693returning forfeited tax credits to the Department of Revenue,
694and such funds shall be paid into the General Revenue Fund of
695the state.
696     (c)  The Department of Environmental Protection may revoke
697or modify any written decision granting eligibility for tax
698credits under this section if it is discovered that the tax
699credit applicant submitted any false statement, representation,
700or certification in any application, record, report, plan, or
701other document filed in an attempt to receive tax credits under
702this section. The Department of Environmental Protection shall
703immediately notify the Department of Revenue of any revoked or
704modified orders affecting previously granted tax credits.
705Additionally, the taxpayer must notify the Department of Revenue
706of any change in its tax credit claimed.
707     (d)  The taxpayer shall file with the Department of Revenue
708an amended return or such other report as the Department of
709Revenue prescribes by rule and shall pay any required tax and
710interest within 60 days after the taxpayer receives notification
711from the Department of Environmental Protection that previously
712approved tax credits have been revoked or modified. If the
713revocation or modification order is contested, the taxpayer
714shall file an amended return or other report as provided in this
715paragraph within 60 days after a final order is issued following
716proceedings.
717     (e)  A notice of deficiency may be issued by the Department
718of Revenue at any time within 3 years after the taxpayer
719receives formal notification from the Department of
720Environmental Protection that previously approved tax credits
721have been revoked or modified. If a taxpayer fails to notify the
722Department of Revenue of any changes to its tax credit claimed,
723a notice of deficiency may be issued at any time.
724     (5)  RULES.--The Department of Revenue shall have the
725authority to adopt rules relating to the forms required to claim
726a tax credit under this section, the requirements and basis for
727establishing an entitlement to a credit, and the examination and
728audit procedures required to administer this section.
729     (6)  PUBLICATION.--The Department of Environmental
730Protection shall determine and publish on a regular basis the
731amount of available tax credits remaining in each fiscal year.
732     Section 13.  Paragraph (a) of subsection (1) of section
733220.13, Florida Statutes, is amended to read:
734     220.13  "Adjusted federal income" defined.--
735     (1)  The term "adjusted federal income" means an amount
736equal to the taxpayer's taxable income as defined in subsection
737(2), or such taxable income of more than one taxpayer as
738provided in s. 220.131, for the taxable year, adjusted as
739follows:
740     (a)  Additions.--There shall be added to such taxable
741income:
742     1.  The amount of any tax upon or measured by income,
743excluding taxes based on gross receipts or revenues, paid or
744accrued as a liability to the District of Columbia or any state
745of the United States which is deductible from gross income in
746the computation of taxable income for the taxable year.
747     2.  The amount of interest which is excluded from taxable
748income under s. 103(a) of the Internal Revenue Code or any other
749federal law, less the associated expenses disallowed in the
750computation of taxable income under s. 265 of the Internal
751Revenue Code or any other law, excluding 60 percent of any
752amounts included in alternative minimum taxable income, as
753defined in s. 55(b)(2) of the Internal Revenue Code, if the
754taxpayer pays tax under s. 220.11(3).
755     3.  In the case of a regulated investment company or real
756estate investment trust, an amount equal to the excess of the
757net long-term capital gain for the taxable year over the amount
758of the capital gain dividends attributable to the taxable year.
759     4.  That portion of the wages or salaries paid or incurred
760for the taxable year which is equal to the amount of the credit
761allowable for the taxable year under s. 220.181. The provisions
762of this subparagraph shall expire and be void on June 30, 2005.
763     5.  That portion of the ad valorem school taxes paid or
764incurred for the taxable year which is equal to the amount of
765the credit allowable for the taxable year under s. 220.182. The
766provisions of this subparagraph shall expire and be void on June
76730, 2005.
768     6.  The amount of emergency excise tax paid or accrued as a
769liability to this state under chapter 221 which tax is
770deductible from gross income in the computation of taxable
771income for the taxable year.
772     7.  That portion of assessments to fund a guaranty
773association incurred for the taxable year which is equal to the
774amount of the credit allowable for the taxable year.
775     8.  In the case of a nonprofit corporation which holds a
776pari-mutuel permit and which is exempt from federal income tax
777as a farmers' cooperative, an amount equal to the excess of the
778gross income attributable to the pari-mutuel operations over the
779attributable expenses for the taxable year.
780     9.  The amount taken as a credit for the taxable year under
781s. 220.1895.
782     10.  Up to nine percent of the eligible basis of any
783designated project which is equal to the credit allowable for
784the taxable year under s. 220.185.
785     11.  The amount taken as a credit for the taxable year
786under s. 220.187.
787     12.  The amount taken as a credit for the taxable year
788under s. 220.192.
789     Section 14.  Subsection (2) of section 186.801, Florida
790Statutes, is amended to read:
791     186.801  Ten-year site plans.--
792     (2)  Within 9 months after the receipt of the proposed
793plan, the commission shall make a preliminary study of such plan
794and classify it as "suitable" or "unsuitable." The commission
795may suggest alternatives to the plan. All findings of the
796commission shall be made available to the Department of
797Environmental Protection for its consideration at any subsequent
798electrical power plant site certification proceedings. It is
799recognized that 10-year site plans submitted by an electric
800utility are tentative information for planning purposes only and
801may be amended at any time at the discretion of the utility upon
802written notification to the commission. A complete application
803for certification of an electrical power plant site under
804chapter 403, when such site is not designated in the current 10-
805year site plan of the applicant, shall constitute an amendment
806to the 10-year site plan. In its preliminary study of each 10-
807year site plan, the commission shall consider such plan as a
808planning document and shall review:
809     (a)  The need, including the need as determined by the
810commission, for electrical power in the area to be served.
811     (b)  The effect on fuel diversity within the state.
812     (c)(b)  The anticipated environmental impact of each
813proposed electrical power plant site.
814     (d)(c)  Possible alternatives to the proposed plan.
815     (e)(d)  The views of appropriate local, state, and federal
816agencies, including the views of the appropriate water
817management district as to the availability of water and its
818recommendation as to the use by the proposed plant of salt water
819or fresh water for cooling purposes.
820     (f)(e)  The extent to which the plan is consistent with the
821state comprehensive plan.
822     (g)(f)  The plan with respect to the information of the
823state on energy availability and consumption.
824     Section 15.  Subsection (6) of section 366.04, Florida
825Statutes, is amended to read:
826     366.04  Jurisdiction of commission.--
827     (6)  The commission shall further have exclusive
828jurisdiction to prescribe and enforce safety standards for
829transmission and distribution facilities of all public electric
830utilities, cooperatives organized under the Rural Electric
831Cooperative Law, and electric utilities owned and operated by
832municipalities. In adopting safety standards, the commission
833shall, at a minimum:
834     (a)  Adopt the 1984 edition of the National Electrical
835Safety Code (ANSI C2) as initial standards; and
836     (b)  Adopt, after review, any new edition of the National
837Electrical Safety Code (ANSI C2).
838
839The standards prescribed by the current 1984 edition of the
840National Electrical Safety Code (ANSI C2) shall constitute
841acceptable and adequate requirements for the protection of the
842safety of the public, and compliance with the minimum
843requirements of that code shall constitute good engineering
844practice by the utilities. The administrative authority referred
845to in the 1984 edition of the National Electrical Safety Code is
846the commission. However, nothing herein shall be construed as
847superseding, repealing, or amending the provisions of s.
848403.523(1) and (10).
849     Section 16.  Subsections (1) and (8) of section 366.05,
850Florida Statutes, are amended to read:
851     366.05  Powers.--
852     (1)  In the exercise of such jurisdiction, the commission
853shall have power to prescribe fair and reasonable rates and
854charges, classifications, standards of quality and measurements,
855including the ability to adopt construction standards that
856exceed the National Electrical Safety Code for purposes of
857ensuring the reliable provision of service, and service rules
858and regulations to be observed by each public utility; to
859require repairs, improvements, additions, replacements, and
860extensions to the plant and equipment of any public utility when
861reasonably necessary to promote the convenience and welfare of
862the public and secure adequate service or facilities for those
863reasonably entitled thereto; to employ and fix the compensation
864for such examiners and technical, legal, and clerical employees
865as it deems necessary to carry out the provisions of this
866chapter; and to adopt rules pursuant to ss. 120.536(1) and
867120.54 to implement and enforce the provisions of this chapter.
868     (8)  If the commission determines that there is probable
869cause to believe that inadequacies exist with respect to the
870energy grids developed by the electric utility industry,
871including inadequacies in fuel diversity or fuel supply
872reliability, it shall have the power, after proceedings as
873provided by law, and after a finding that mutual benefits will
874accrue to the electric utilities involved, to require
875installation or repair of necessary facilities, including
876generating plants and transmission facilities, with the costs to
877be distributed in proportion to the benefits received, and to
878take all necessary steps to ensure compliance. The electric
879utilities involved in any action taken or orders issued pursuant
880to this subsection shall have full power and authority,
881notwithstanding any general or special laws to the contrary, to
882jointly plan, finance, build, operate, or lease generating and
883transmission facilities and shall be further authorized to
884exercise the powers granted to corporations in chapter 361. This
885subsection shall not supersede or control any provision of the
886Florida Electrical Power Plant Siting Act, ss. 403.501-403.518.
887     Section 17.  The Florida Public Service Commission shall
888direct a study of the electric transmission grid in the state.
889The study shall look at electric system reliability to examine
890the efficiency and reliability of power transfer and emergency
891contingency conditions. In addition, the study shall examine the
892strengthening of infrastructure to address issues arising from
893the 2004 and 2005 hurricane seasons. A report of the results of
894the study shall be provided to the Governor, the President of
895the Senate, and the Speaker of the House of Representatives by
896January 30, 2007.
897     Section 18.  Subsections (5), (8), (9), (12), (18), (24),
898and (27) of section 403.503, Florida Statutes, are amended,
899subsections (16) through (28) are renumbered as (17) through
900(29), respectively, and a new subsection (16) is added to that
901section, to read:
902     403.503  Definitions relating to Florida Electrical Power
903Plant Siting Act.--As used in this act:
904     (5)  "Application" means the documents required by the
905department to be filed to initiate a certification review and
906evaluation, including the initial document filing, amendments,
907and responses to requests from the department for additional
908data and information proceeding and shall include the documents
909necessary for the department to render a decision on any permit
910required pursuant to any federally delegated or approved permit
911program.
912     (8)  "Completeness" means that the application has
913addressed all applicable sections of the prescribed application
914format, and but does not mean that those sections are sufficient
915in comprehensiveness of data or in quality of information
916provided to allow the department to determine whether the
917application provides the reviewing agencies adequate information
918to prepare the reports required by s. 403.507.
919     (9)  "Corridor" means the proposed area within which an
920associated linear facility right-of-way is to be located. The
921width of the corridor proposed for certification as an
922associated facility, at the option of the applicant, may be the
923width of the right-of-way or a wider boundary, not to exceed a
924width of 1 mile. The area within the corridor in which a right-
925of-way may be located may be further restricted by a condition
926of certification. After all property interests required for the
927right-of-way have been acquired by the licensee applicant, the
928boundaries of the area certified shall narrow to only that land
929within the boundaries of the right-of-way.
930     (12)  "Electrical power plant" means, for the purpose of
931certification, any steam or solar electrical generating facility
932using any process or fuel, including nuclear materials, except
933that this term does not include any steam or solar electrical
934generating facility of less than 75 megawatts in capacity unless
935the applicant for such a facility elects to apply for
936certification under this act, or any unit capacity expansion of
93735 megawatts or less of an existing exothermic reaction
938cogeneration unit that was originally built under a power plant
939siting act exemption. This exemption does not apply if the unit
940uses oil or natural gas for purposes other than startup. This
941term and includes associated facilities to be owned by the
942licensee which directly support the construction and operation
943of the electrical power plant such as fuel unloading facilities,
944pipelines necessary for transporting fuel for the operation of
945the facility or other fuel transportation facilities, water or
946wastewater transport pipelines, construction, maintenance and
947access roads, railway lines necessary for transport of
948construction equipment or fuel for the operation of the
949facility, and those associated transmission lines owned by the
950licensee which connect the electrical power plant to an existing
951transmission network or rights-of-way to which the applicant
952intends to connect, except that this term does not include any
953steam or solar electrical generating facility of less than 75
954megawatts in capacity unless the applicant for such a facility
955elects to apply for certification under this act. Associated
956facilities An associated transmission line may include, at the
957applicant's option, offsite associated facilities that will not
958be owned by the applicant and any proposed terminal or
959intermediate substations or substation expansions connected to
960the associated transmission line.
961     (16)  "Licensee" means an applicant that has obtained a
962certification order for the subject project.
963     (19)(18)  "Nonprocedural requirements of agencies" means
964any agency's regulatory requirements established by statute,
965rule, ordinance, zoning ordinance, land development code, or
966comprehensive plan, excluding any provisions prescribing forms,
967fees, procedures, or time limits for the review or processing of
968information submitted to demonstrate compliance with such
969regulatory requirements.
970     (25)(24)  "Right-of-way" means land necessary for the
971construction and maintenance of a connected associated linear
972facility, such as a railroad line, pipeline, or transmission
973line as owned by or proposed to be certified by the applicant.
974The typical width of the right-of-way shall be identified in the
975application. The right-of-way shall be located within the
976certified corridor and shall be identified by the applicant
977subsequent to certification in documents filed with the
978department prior to construction.
979     (28)(27)  "Ultimate site capacity" means the maximum
980generating capacity for a site as certified by the board.
981"Sufficiency" means that the application is not only complete
982but that all sections are sufficient in the comprehensiveness of
983data or in the quality of information provided to allow the
984department to determine whether the application provides the
985reviewing agencies adequate information to prepare the reports
986required by s. 403.507.
987     Section 19.  Subsections (1), (7), (9), and (10) of section
988403.504, Florida Statutes, are amended, and new subsections (9),
989(10), (11), and (12) are added to that section, to read:
990     403.504  Department of Environmental Protection; powers and
991duties enumerated.--The department shall have the following
992powers and duties in relation to this act:
993     (1)  To adopt rules pursuant to ss. 120.536(1) and 120.54
994to implement the provisions of this act, including rules setting
995forth environmental precautions to be followed in relation to
996the location, construction, and operation of electrical power
997plants.
998     (7)  To conduct studies and prepare a project written
999analysis under s. 403.507.
1000     (9)  To issue final orders after receipt of the
1001administrative law judge's order relinquishing jurisdiction
1002pursuant to s. 403.508(6).
1003     (10)  To act as clerk for the siting board.
1004     (11)  To administer and manage the terms and conditions of
1005the certification order and supporting documents and records for
1006the life of the facility.
1007     (12)  To issue emergency orders on behalf of the board for
1008facilities licensed under this act.
1009     (9)  To notify all affected agencies of the filing of a
1010notice of intent within 15 days after receipt of the notice.
1011     (10)  To issue, with the electrical power plant
1012certification, any license required pursuant to any federally
1013delegated or approved permit program.
1014     Section 20.  Section 403.5055, Florida Statutes, is amended
1015to read:
1016     403.5055  Application for permits pursuant to s.
1017403.0885.--In processing applications for permits pursuant to s.
1018403.0885 that are associated with applications for electrical
1019power plant certification:
1020     (1)  The procedural requirements set forth in 40 C.F.R. s.
1021123.25, including public notice, public comments, and public
1022hearings, shall be closely coordinated with the certification
1023process established under this part. In the event of a conflict
1024between the certification process and federally required
1025procedures for NPDES permit issuance, the applicable federal
1026requirements shall control.
1027     (2)  The department's proposed action pursuant to 40 C.F.R.
1028s. 124.6, including any draft NPDES permit (containing the
1029information required under 40 C.F.R. s. 124.6(d)), shall within
1030130 days after the submittal of a complete application be
1031publicly noticed and transmitted to the United States
1032Environmental Protection Agency for its review pursuant to 33
1033U.S.C. s. 1342(d).
1034     (2)(3)  If available at the time the department issues its
1035project analysis pursuant to s. 403.507(5), the department shall
1036include in its project analysis written analysis pursuant to s.
1037403.507(3) copies of the department's proposed action pursuant
1038to 40 C.F.R. s. 124.6 on any application for a NPDES permit; any
1039corresponding comments received from the United States
1040Environmental Protection Agency, the applicant, or the general
1041public; and the department's response to those comments.
1042     (3)(4)  The department shall not issue or deny the permit
1043pursuant to s. 403.0885 in advance of the issuance of the
1044electrical electric power plant certification under this part
1045unless required to do so by the provisions of federal law. When
1046possible, any hearing on a permit issued pursuant to s. 403.0885
1047shall be conducted in conjunction with the certification hearing
1048held pursuant to this act. The department's actions on an NPDES
1049permit shall be based on the record and recommended order of the
1050certification hearing, if the hearing on the NPDES was conducted
1051in conjunction with the certification hearing, and of any other
1052proceeding held in connection with the application for an NPDES
1053permit, timely public comments received with respect to the
1054application, and the provisions of federal law. The department's
1055action on an NPDES permit, if issued, shall differ from the
1056actions taken by the siting board regarding the certification
1057order if federal laws and regulations require different action
1058to be taken to ensure compliance with the Clean Water Act, as
1059amended, and implementing regulations. Nothing in this part
1060shall be construed to displace the department's authority as the
1061final permitting entity under the federally approved state NPDES
1062program. Nothing in this part shall be construed to authorize
1063the issuance of a state NPDES permit which does not conform to
1064the requirements of the federally approved state NPDES program.
1065The permit, if issued, shall be valid for no more than 5 years.
1066     (5)  The department's action on an NPDES permit renewal, if
1067issued, shall differ from the actions taken by the siting board
1068regarding the certification order if federal laws and
1069regulations require different action to be taken to ensure
1070compliance with the Clean Water Act, as amended, and
1071implementing regulations.
1072     Section 21.  Section 403.506, Florida Statutes, is amended
1073to read:
1074     403.506  Applicability, thresholds, and certification.--
1075     (1)  The provisions of this act shall apply to any
1076electrical power plant as defined herein, except that the
1077provisions of this act shall not apply to any electrical power
1078plant or steam generating plant of less than 75 megawatts in
1079capacity or to any substation to be constructed as part of an
1080associated transmission line unless the applicant has elected to
1081apply for certification of such plant or substation under this
1082act. The provisions of this act shall not apply to any unit
1083capacity expansion of 35 megawatts or less of an existing
1084exothermic reaction cogeneration unit that was exempt from this
1085act when it was originally built; however, this exemption shall
1086not apply if the unit uses oil or natural gas for purposes other
1087than unit startup. No construction of any new electrical power
1088plant or expansion in steam generating capacity as measured by
1089an increase in the maximum electrical generator rating of any
1090existing electrical power plant may be undertaken after October
10911, 1973, without first obtaining certification in the manner as
1092herein provided, except that this act shall not apply to any
1093such electrical power plant which is presently operating or
1094under construction or which has, upon the effective date of
1095chapter 73-33, Laws of Florida, applied for a permit or
1096certification under requirements in force prior to the effective
1097date of such act.
1098     (2)  Except as provided in the certification, modification
1099of nonnuclear fuels, internal related hardware, including
1100increases in steam turbine efficiency, or operating conditions
1101not in conflict with certification which increase the electrical
1102output of a unit to no greater capacity than the maximum
1103electrical generator rating operating capacity of the existing
1104generator shall not constitute an alteration or addition to
1105generating capacity which requires certification pursuant to
1106this act.
1107     (3)  The application for any related department license
1108which is required pursuant to any federally delegated or
1109approved permit program shall be processed within the time
1110periods allowed by this act, in lieu of those specified in s.
1111120.60. However, permits issued pursuant to s. 403.0885 shall be
1112processed in accordance with 40 C.F.R. part 123.
1113     Section 22.  Section 403.5064, Florida Statutes, is amended
1114to read:
1115     403.5064  Application Distribution of application;
1116schedules.--
1117     (1)  The formal date of filing of a certification
1118application and commencement of the certification review process
1119shall be when the applicant submits:
1120     (a)  Copies of the certification application in a quantity
1121and format as prescribed by rule to the department and other
1122agencies identified in s. 403.507(2)(a).
1123     (b)  The application fee specified under s. 403.518 to the
1124department.
1125     (2)(1)  Within 7 days after the filing of an application,
1126the department shall provide to the applicant and the Division
1127of Administrative Hearings the names and addresses of any
1128additional those affected or other agencies or persons entitled
1129to notice and copies of the application and any amendments.
1130Copies of the application shall be distributed within 5 days
1131after the provision of such names and addresses by the applicant
1132to these additional agencies. This distribution shall not be a
1133basis for altering the schedule of dates for the certification
1134process.
1135     (3)  Any amendment to the application made prior to
1136certification shall be disposed of as part of the original
1137certification proceeding. Amendment of the application may be
1138considered good cause for alteration of time limits pursuant to
1139s. 403.5095.
1140     (4)(2)  Within 7 days after the filing of an application
1141completeness has been determined, the department shall prepare a
1142proposed schedule of dates for determination of completeness,
1143submission of statements of issues, determination of
1144sufficiency, and submittal of final reports, from affected and
1145other agencies and other significant dates to be followed during
1146the certification process, including dates for filing notices of
1147appearance to be a party pursuant to s. 403.508(3)(4). This
1148schedule shall be timely provided by the department to the
1149applicant, the administrative law judge, all agencies identified
1150pursuant to subsection (2) (1), and all parties. Within 7 days
1151after the filing of the proposed schedule, the administrative
1152law judge shall issue an order establishing a schedule for the
1153matters addressed in the department's proposed schedule and
1154other appropriate matters, if any.
1155     (5)(3)  Within 7 days after completeness has been
1156determined, the applicant shall distribute copies of the
1157application to all agencies identified by the department
1158pursuant to subsection (1). Copies of changes and amendments to
1159the application shall be timely distributed by the applicant to
1160all affected agencies and parties who have received a copy of
1161the application.
1162     (6)  Notice of the filing of the application shall be
1163published in accordance with the requirements of s. 403.5115.
1164     Section 23.  Section 403.5065, Florida Statutes, is amended
1165to read:
1166     403.5065  Appointment of administrative law judge; powers
1167and duties.--
1168     (1)  Within 7 days after receipt of an application, whether
1169complete or not, the department shall request the Division of
1170Administrative Hearings to designate an administrative law judge
1171to conduct the hearings required by this act. The division
1172director shall designate an administrative law judge within 7
1173days after receipt of the request from the department. In
1174designating an administrative law judge for this purpose, the
1175division director shall, whenever practicable, assign an
1176administrative law judge who has had prior experience or
1177training in electrical power plant site certification
1178proceedings. Upon being advised that an administrative law judge
1179has been appointed, the department shall immediately file a copy
1180of the application and all supporting documents with the
1181designated administrative law judge, who shall docket the
1182application.
1183     (2)  The administrative law judge shall have all powers and
1184duties granted to administrative law judges by chapter 120 and
1185by the laws and rules of the department.
1186     Section 24.  Section 403.5066, Florida Statutes, is amended
1187to read:
1188     403.5066  Determination of completeness.--
1189     (1)(a)  Within 30 days after the filing of an application,
1190affected agencies shall file a statement with the department
1191containing each agency's recommendations on the completeness of
1192the application.
1193     (b)  Within 40 15 days after the filing receipt of an
1194application, the department shall file a statement with the
1195Division of Administrative Hearings, and with the applicant, and
1196with all parties declaring its position with regard to the
1197completeness, not the sufficiency, of the application. The
1198department's statement shall be based upon consultation with the
1199affected agencies.
1200     (2)(1)  If the department declares the application to be
1201incomplete, the applicant, within 15 days after the filing of
1202the statement by the department, shall file with the Division of
1203Administrative Hearings, and with the department, and all
1204parties a statement:
1205     (a)  A withdrawal of Agreeing with the statement of the
1206department and withdrawing the application;
1207     (b)  A statement agreeing to supply the additional
1208information necessary to make the application complete. Such
1209additional information shall be provided within 30 days after
1210the issuance of the department's statement on completeness of
1211the application. The time schedules under this act shall not be
1212tolled if the applicant makes the application complete within 30
1213days after the issuance of the department's statement on
1214completeness of the application. A subsequent finding by the
1215department that the application remains incomplete, based upon
1216the additional information submitted by the applicant or upon
1217the failure of the applicant to timely submit the additional
1218information, tolls the time schedules under this act until the
1219application is determined complete; Agreeing with the statement
1220of the department and agreeing to amend the application without
1221withdrawing it. The time schedules referencing a complete
1222application under this act shall not commence until the
1223application is determined complete; or
1224     (c)  A statement contesting the department's determination
1225of incompleteness; or contesting the statement of the
1226department.
1227     (d)  A statement agreeing with the department and
1228requesting additional time beyond 30 days to provide the
1229information necessary to make the application complete. If the
1230applicant exercises this option, the time schedules under this
1231act are tolled until the application is determined complete.
1232     (3)(a)(2)  If the applicant contests the determination by
1233the department that an application is incomplete, the
1234administrative law judge shall schedule a hearing on the
1235statement of completeness. The hearing shall be held as
1236expeditiously as possible, but not later than 21 30 days after
1237the filing of the statement by the department. The
1238administrative law judge shall render a decision within 7 10
1239days after the hearing.
1240     (b)  Parties to a hearing on the issue of completeness
1241shall include the applicant, the department, and any agency that
1242has jurisdiction over the matter in dispute.
1243     (c)(a)  If the administrative law judge determines that the
1244application was not complete as filed, the applicant shall
1245withdraw the application or make such additional submittals as
1246necessary to complete it. The time schedules referencing a
1247complete application under this act shall not commence until the
1248application is determined complete.
1249     (d)(b)  If the administrative law judge determines that the
1250application was complete at the time it was declared incomplete
1251filed, the time schedules referencing a complete application
1252under this act shall commence upon such determination.
1253     (4)  If the applicant provides additional information to
1254address the issues identified in the determination of
1255incompleteness, each affected agency may submit to the
1256department, no later than 15 days after the applicant files the
1257additional information, a recommendation on whether the agency
1258believes the application is complete. Within 22 days after
1259receipt of the additional information from the applicant
1260submitted under paragraph (2)(b), paragraph (2)(d), or paragraph
1261(3)(c), the department shall determine whether the additional
1262information supplied by an applicant makes the application
1263complete. If the department finds that the application is still
1264incomplete, the applicant may exercise any of the options
1265specified in subsection (2) as often as is necessary to resolve
1266the dispute.
1267     Section 25.  Section 403.50663, Florida Statutes, is
1268created to read:
1269     403.50663  Informational public meetings.--
1270     (1)  A local government within whose jurisdiction the power
1271plant is proposed to be sited may hold one informational public
1272meeting in addition to the hearings specifically authorized by
1273this act on any matter associated with the electrical power
1274plant proceeding. Such informational public meetings shall be
1275held by the local government or by the regional planning council
1276if the local government does not hold such meeting within 70
1277days after the filing of the application. The purpose of an
1278informational public meeting is for the local government or
1279regional planning council to further inform the public about the
1280proposed electrical power plant or associated facilities, obtain
1281comments from the public, and formulate its recommendation with
1282respect to the proposed electrical power plant.
1283     (2)  Informational public meetings shall be held solely at
1284the option of each local government or regional planning council
1285if a public meeting is not held by the local government. It is
1286the legislative intent that local governments or regional
1287planning councils attempt to hold such public meetings. Parties
1288to the proceedings under this act shall be encouraged to attend;
1289however, no party other than the applicant and the department
1290shall be required to attend such informational public meetings.
1291     (3)  A local government or regional planning council that
1292intends to conduct an informational public meeting must provide
1293notice of the meeting to all parties not less than 5 days prior
1294to the meeting.
1295     (4)  The failure to hold an informational public meeting or
1296the procedure used for the informational public meeting are not
1297grounds for the alteration of any time limitation in this act
1298under s. 403.5095 or grounds to deny or condition certification.
1299     Section 26.  Section 403.50665, Florida Statutes, is
1300created to read:
1301     403.50665  Land use consistency.--
1302     (1)  The applicant shall include in the application a
1303statement on the consistency of the site or any directly
1304associated facilities with existing land use plans and zoning
1305ordinances that were in effect on the date the application was
1306filed and a full description of such consistency.
1307     (2)  Within 80 days after the filing of the application,
1308each local government shall file a determination with the
1309department, the applicant, the administrative law judge, and all
1310parties on the consistency of the site or any directly
1311associated facilities with existing land use plans and zoning
1312ordinances that were in effect on the date the application was
1313filed, based on the information provided in the application. The
1314applicant shall publish notice of the consistency determination
1315in accordance with the requirements of s. 403.5115.
1316     (3)  If any substantially affected person wishes to dispute
1317the local government's determination, he or she shall file a
1318petition with the department within 15 days after the
1319publication of notice of the local government's determination.
1320If a hearing is requested, the provisions of s. 403.508(1) shall
1321apply.
1322     (4)  The dates in this section may be altered upon
1323agreement between the applicant, the local government, and the
1324department pursuant to s. 403.5095.
1325     (5)  If it is determined by the local government that the
1326proposed site or directly associated facility does conform with
1327existing land use plans and zoning ordinances in effect as of
1328the date of the application and no petition has been filed, the
1329responsible zoning or planning authority shall not thereafter
1330change such land use plans or zoning ordinances so as to
1331foreclose construction and operation of the proposed site or
1332directly associated facilities unless certification is
1333subsequently denied or withdrawn.
1334     Section 27.  Section 403.5067, Florida Statutes, is
1335repealed.
1336     Section 28.  Section 403.507, Florida Statutes, is amended
1337to read:
1338     403.507  Preliminary statements of issues, reports, project
1339analyses, and studies.--
1340     (1)  Each affected agency identified in paragraph (2)(a)
1341shall submit a preliminary statement of issues to the
1342department, and the applicant, and all parties no later than 40
134360 days after the certification application has been determined
1344distribution of the complete application. The failure to raise
1345an issue in this statement shall not preclude the issue from
1346being raised in the agency's report.
1347     (2)(a)  No later than 100 days after the certification
1348application has been determined complete, the following agencies
1349shall prepare reports as provided below and shall submit them to
1350the department and the applicant within 150 days after
1351distribution of the complete application:
1352     1.  The Department of Community Affairs shall prepare a
1353report containing recommendations which address the impact upon
1354the public of the proposed electrical power plant, based on the
1355degree to which the electrical power plant is consistent with
1356the applicable portions of the state comprehensive plan,
1357emergency management requirements, and other such matters within
1358its jurisdiction. The Department of Community Affairs may also
1359comment on the consistency of the proposed electrical power
1360plant with applicable strategic regional policy plans or local
1361comprehensive plans and land development regulations.
1362     2.  The Public Service Commission shall prepare a report as
1363to the present and future need for the electrical generating
1364capacity to be supplied by the proposed electrical power plant.
1365The report shall include the commission's determination pursuant
1366to s. 403.519 and may include the commission's comments with
1367respect to any other matters within its jurisdiction.
1368     2.3.  The water management district shall prepare a report
1369as to matters within its jurisdiction, including but not limited
1370to, the impact of the proposed electrical power plant on water
1371resources, regional water supply planning, and district-owned
1372lands and works.
1373     3.4.  Each local government in whose jurisdiction the
1374proposed electrical power plant is to be located shall prepare a
1375report as to the consistency of the proposed electrical power
1376plant with all applicable local ordinances, regulations,
1377standards, or criteria that apply to the proposed electrical
1378power plant, including adopted local comprehensive plans, land
1379development regulations, and any applicable local environmental
1380regulations adopted pursuant to s. 403.182 or by other means.
1381     4.5.  The Fish and Wildlife Conservation Commission shall
1382prepare a report as to matters within its jurisdiction.
1383     5.6.  Each The regional planning council shall prepare a
1384report containing recommendations that address the impact upon
1385the public of the proposed electrical power plant, based on the
1386degree to which the electrical power plant is consistent with
1387the applicable provisions of the strategic regional policy plan
1388adopted pursuant to chapter 186 and other matters within its
1389jurisdiction.
1390     6.  The Department of Transportation shall address the
1391impact of the proposed electrical power plant on matters within
1392its jurisdiction.
1393     (b)7.  Any other agency, if requested by the department,
1394shall also perform studies or prepare reports as to matters
1395within that agency's jurisdiction which may potentially be
1396affected by the proposed electrical power plant.
1397     (b)  As needed to verify or supplement the studies made by
1398the applicant in support of the application, it shall be the
1399duty of the department to conduct, or contract for, studies of
1400the proposed electrical power plant and site, including, but not
1401limited to, the following, which shall be completed no later
1402than 210 days after the complete application is filed with the
1403department:
1404     1.  Cooling system requirements.
1405     2.  Construction and operational safeguards.
1406     3.  Proximity to transportation systems.
1407     4.  Soil and foundation conditions.
1408     5.  Impact on suitable present and projected water supplies
1409for this and other competing uses.
1410     6.  Impact on surrounding land uses.
1411     7.  Accessibility to transmission corridors.
1412     8.  Environmental impacts.
1413     9.  Requirements applicable under any federally delegated
1414or approved permit program.
1415     (3)(c)  Each report described in subsection (2) paragraphs
1416(a) and (b) shall contain:
1417     (a)  A notice of any nonprocedural requirements not
1418specifically listed in the application from which a variance,
1419exemption, exception all information on variances, exemptions,
1420exceptions, or other relief is necessary in order for the
1421proposed electrical power plant to be certified. Failure of such
1422notification by an agency shall be treated as a waiver from
1423nonprocedural requirements of that agency. However, no variance
1424shall be granted from standards or regulations of the department
1425applicable under any federally delegated or approved permit
1426program, except as expressly allowed in such program. which may
1427be required by s. 403.511(2) and
1428     (b)  A recommendation for approval or denial of the
1429application.
1430     (c)  Any proposed conditions of certification on matters
1431within the jurisdiction of such agency. For each condition
1432proposed by an agency in its report, the agency shall list the
1433specific statute, rule, or ordinance which authorizes the
1434proposed condition.
1435     (d)  The agencies shall initiate the activities required by
1436this section no later than 30 days after the complete
1437application is distributed. The agencies shall keep the
1438applicant and the department informed as to the progress of the
1439studies and any issues raised thereby.
1440     (3)  No later than 60 days after the application for a
1441federally required new source review or prevention of
1442significant deterioration permit for the electrical power plant
1443is complete and sufficient, the department shall issue its
1444preliminary determination on such permit. Notice of such
1445determination shall be published as required by the department's
1446rules for notices of such permits. The department shall receive
1447public comments and comments from the United States
1448Environmental Protection Agency and other affected agencies on
1449the preliminary determination as provided for in the federally
1450approved state implementation plan. The department shall
1451maintain a record of all comments received and considered in
1452taking action on such permits. If a petition for an
1453administrative hearing on the department's preliminary
1454determination is filed by a substantially affected person, that
1455hearing shall be consolidated with the certification hearing.
1456     (4)(a)  No later than 150 days after the application is
1457filed, the Public Service Commission shall prepare a report as
1458to the present and future need for electrical generating
1459capacity to be supplied by the proposed electrical power plant.
1460The report shall include the commission's determination pursuant
1461to s. 403.519 and may include the commission's comments with
1462respect to any other matters within its jurisdiction.
1463     (b)  Receipt of an affirmative determination of need by the
1464submittal deadline under paragraph (a) shall be a condition
1465precedent to issuance of the department's project analysis and
1466conduct of the certification hearing.
1467     (5)(4)  The department shall prepare a project written
1468analysis, which shall be filed with the designated
1469administrative law judge and served on all parties no later than
1470130 240 days after the complete application is determined
1471complete filed with the department, but no later than 60 days
1472prior to the hearing, and which shall include:
1473     (a)  A statement indicating whether the proposed electrical
1474power plant and proposed ultimate site capacity will be in
1475compliance and consistent with matters within the department's
1476standard jurisdiction, including with the rules of the
1477department, as well as whether the proposed electrical power
1478plant and proposed ultimate site capacity will be in compliance
1479with the nonprocedural requirements of the affected agencies.
1480     (b)  Copies of the studies and reports required by this
1481section and s. 403.519.
1482     (c)  The comments received by the department from any other
1483agency or person.
1484     (d)  The recommendation of the department as to the
1485disposition of the application, of variances, exemptions,
1486exceptions, or other relief identified by any party, and of any
1487proposed conditions of certification which the department
1488believes should be imposed.
1489     (e)  If available, the recommendation of the department
1490regarding the issuance of any license required pursuant to a
1491federally delegated or approved permit program.
1492     (f)  Copies of the department's draft of the operation
1493permit for a major source of air pollution, which must also be
1494provided to the United States Environmental Protection Agency
1495for review within 5 days after issuance of the written analysis.
1496     (6)(5)  Except when good cause is shown, the failure of any
1497agency to submit a preliminary statement of issues or a report,
1498or to submit its preliminary statement of issues or report
1499within the allowed time, shall not be grounds for the alteration
1500of any time limitation in this act. Neither the failure to
1501submit a preliminary statement of issues or a report nor the
1502inadequacy of the preliminary statement of issues or report are
1503shall be grounds to deny or condition certification.
1504     Section 29.  Section 403.508, Florida Statutes, is amended
1505to read:
1506     403.508  Land use and certification hearings proceedings,
1507parties, participants.--
1508     (1)(a)  If a petition for a hearing on land use has been
1509filed pursuant to s. 403.50665, the designated administrative
1510law judge shall conduct a land use hearing in the county of the
1511proposed site or directly associated facility, as applicable, as
1512expeditiously as possible, but not later than 30 within 90 days
1513after the department's receipt of the petition a complete
1514application for electrical power plant site certification by the
1515department. The place of such hearing shall be as close as
1516possible to the proposed site or directly associated facility.
1517If a petition is filed, the hearing shall be held regardless of
1518the status of the completeness of the application. However,
1519incompleteness of information necessary for a local government
1520to evaluate an application may be claimed by the local
1521government as cause for a statement of inconsistency with
1522existing land use plans and zoning ordinances under s.
1523403.50665.
1524     (b)  Notice of the land use hearing shall be published in
1525accordance with the requirements of s. 403.5115.
1526     (c)(2)  The sole issue for determination at the land use
1527hearing shall be whether or not the proposed site is consistent
1528and in compliance with existing land use plans and zoning
1529ordinances. If the administrative law judge concludes that the
1530proposed site is not consistent or in compliance with existing
1531land use plans and zoning ordinances, the administrative law
1532judge shall receive at the hearing evidence on, and address in
1533the recommended order any changes to or approvals or variances
1534under, the applicable land use plans or zoning ordinances which
1535will render the proposed site consistent and in compliance with
1536the local land use plans and zoning ordinances.
1537     (d)  The designated administrative law judge's recommended
1538order shall be issued within 30 days after completion of the
1539hearing and shall be reviewed by the board within 60 45 days
1540after receipt of the recommended order by the board.
1541     (e)  If it is determined by the board that the proposed
1542site does conform with existing land use plans and zoning
1543ordinances in effect as of the date of the application, or as
1544otherwise provided by this act, the responsible zoning or
1545planning authority shall not thereafter change such land use
1546plans or zoning ordinances so as to foreclose construction and
1547operation of affect the proposed electrical power plant on the
1548proposed site or directly associated facilities unless
1549certification is subsequently denied or withdrawn.
1550     (f)  If it is determined by the board that the proposed
1551site does not conform with existing land use plans and zoning
1552ordinances, it shall be the responsibility of the applicant to
1553make the necessary application for rezoning. Should the
1554application for rezoning be denied, the applicant may appeal
1555this decision to the board, which may, if it determines after
1556notice and hearing and upon consideration of the recommended
1557order on land use and zoning issues that it is in the public
1558interest to authorize the use of the land as a site for an
1559electrical power plant, authorize an amendment, rezoning,
1560variance, or other approval a variance to the adopted land use
1561plan and zoning ordinances required to render the proposed site
1562consistent with local land use plans and zoning ordinances. The
1563board's action shall not be controlled by any other procedural
1564requirements of law. In the event a variance or other approval
1565is denied by the board, it shall be the responsibility of the
1566applicant to make the necessary application for any approvals
1567determined by the board as required to make the proposed site
1568consistent and in compliance with local land use plans and
1569zoning ordinances. No further action may be taken on the
1570complete application by the department until the proposed site
1571conforms to the adopted land use plan or zoning ordinances or
1572the board grants relief as provided under this act.
1573     (2)(a)(3)  A certification hearing shall be held by the
1574designated administrative law judge no later than 265 300 days
1575after the complete application is filed with the department;
1576however, an affirmative determination of need by the Public
1577Service Commission pursuant to s. 403.519 shall be a condition
1578precedent to the conduct of the certification hearing. The
1579certification hearing shall be held at a location in proximity
1580to the proposed site. The certification hearing shall also
1581constitute the sole hearing allowed by chapter 120 to determine
1582the substantial interest of a party regarding any required
1583agency license or any related permit required pursuant to any
1584federally delegated or approved permit program. At the
1585conclusion of the certification hearing, the designated
1586administrative law judge shall, after consideration of all
1587evidence of record, submit to the board a recommended order no
1588later than 45 60 days after the filing of the hearing
1589transcript. In the event the administrative law judge fails to
1590issue a recommended order within 60 days after the filing of the
1591hearing transcript, the administrative law judge shall submit a
1592report to the board with a copy to all parties within 60 days
1593after the filing of the hearing transcript to advise the board
1594of the reason for the delay in the issuance of the recommended
1595order and of the date by which the recommended order will be
1596issued.
1597     (b)  Notice of the certification hearing and notice of the
1598deadline for filing of notice of intent to be a party shall be
1599made in accordance with the requirements of s. 403.5115.
1600     (3)(a)(4)(a)  Parties to the proceeding shall include:
1601     1.  The applicant.
1602     2.  The Public Service Commission.
1603     3.  The Department of Community Affairs.
1604     4.  The Fish and Wildlife Conservation Commission.
1605     5.  The water management district.
1606     6.  The department.
1607     7.  The regional planning council.
1608     8.  The local government.
1609     9.  The Department of Transportation.
1610     (b)  Any party listed in paragraph (a) other than the
1611department or the applicant may waive its right to participate
1612in these proceedings. If such listed party fails to file a
1613notice of its intent to be a party on or before the 90th day
1614prior to the certification hearing, such party shall be deemed
1615to have waived its right to be a party.
1616     (c)  Notwithstanding the provisions of chapter 120, upon
1617the filing with the administrative law judge of a notice of
1618intent to be a party no later than 75 days after the application
1619is filed at least 15 days prior to the date of the land use
1620hearing, the following shall also be parties to the proceeding:
1621     1.  Any agency not listed in paragraph (a) as to matters
1622within its jurisdiction.
1623     2.  Any domestic nonprofit corporation or association
1624formed, in whole or in part, to promote conservation or natural
1625beauty; to protect the environment, personal health, or other
1626biological values; to preserve historical sites; to promote
1627consumer interests; to represent labor, commercial, or
1628industrial groups; or to promote comprehensive planning or
1629orderly development of the area in which the proposed electrical
1630power plant is to be located.
1631     (d)  Notwithstanding paragraph (e), failure of an agency
1632described in subparagraph (c)1. to file a notice of intent to be
1633a party within the time provided herein shall constitute a
1634waiver of the right of that agency to participate as a party in
1635the proceeding.
1636     (e)  Other parties may include any person, including those
1637persons enumerated in paragraph (c) who have failed to timely
1638file a notice of intent to be a party, whose substantial
1639interests are affected and being determined by the proceeding
1640and who timely file a motion to intervene pursuant to chapter
1641120 and applicable rules. Intervention pursuant to this
1642paragraph may be granted at the discretion of the designated
1643administrative law judge and upon such conditions as he or she
1644may prescribe any time prior to 30 days before the commencement
1645of the certification hearing.
1646     (f)  Any agency, including those whose properties or works
1647are being affected pursuant to s. 403.509(4), shall be made a
1648party upon the request of the department or the applicant.
1649     (4)(a)  The order of presentation at the certification
1650hearing, unless otherwise changed by the administrative law
1651judge to ensure the orderly presentation of witnesses and
1652evidence, shall be:
1653     1.  The applicant.
1654     2.  The department.
1655     3.  State agencies.
1656     4.  Regional agencies, including regional planning councils
1657and water management districts.
1658     5.  Local governments.
1659     6.  Other parties.
1660     (b)(5)  When appropriate, any person may be given an
1661opportunity to present oral or written communications to the
1662designated administrative law judge. If the designated
1663administrative law judge proposes to consider such
1664communications, then all parties shall be given an opportunity
1665to cross-examine or challenge or rebut such communications.
1666     (5)  At the conclusion of the certification hearing, the
1667designated administrative law judge shall, after consideration
1668of all evidence of record, submit to the board a recommended
1669order no later than 45 days after the filing of the hearing
1670transcript.
1671     (6)(a)  No earlier than 29 days prior to the conduct of the
1672certification hearing, the department or the applicant may
1673request that the administrative law judge cancel the
1674certification hearing and relinquish jurisdiction to the
1675department if all parties to the proceeding stipulate that there
1676are no disputed issues of fact or law to be raised at the
1677certification hearing, and if sufficient time remains for the
1678applicant and the department to publish public notices of the
1679cancellation of the hearing at least 3 days prior to the
1680scheduled date of the hearing.
1681     (b)  The administrative law judge shall issue an order
1682granting or denying the request within 5 days after receipt of
1683the request.
1684     (c)  If the administrative law judge grants the request,
1685the department and the applicant shall publish notices of the
1686cancellation of the certification hearing, in accordance with s.
1687403.5115.
1688     (d)1.  If the administrative law judge grants the request,
1689the department shall prepare and issue a final order in
1690accordance with s. 403.509(1)(a).
1691     2.  Parties may submit proposed recommended orders to the
1692department no later than 10 days after the administrative law
1693judge issues an order relinquishing jurisdiction.
1694     (7)  The applicant shall pay those expenses and costs
1695associated with the conduct of the hearings and the recording
1696and transcription of the proceedings.
1697     (6)  The designated administrative law judge shall have all
1698powers and duties granted to administrative law judges by
1699chapter 120 and this chapter and by the rules of the department
1700and the Administration Commission, including the authority to
1701resolve disputes over the completeness and sufficiency of an
1702application for certification.
1703     (7)  The order of presentation at the certification
1704hearing, unless otherwise changed by the administrative law
1705judge to ensure the orderly presentation of witnesses and
1706evidence, shall be:
1707     (a)  The applicant.
1708     (b)  The department.
1709     (c)  State agencies.
1710     (d)  Regional agencies, including regional planning
1711councils and water management districts.
1712     (e)  Local governments.
1713     (f)  Other parties.
1714     (8)  In issuing permits under the federally approved new
1715source review or prevention of significant deterioration permit
1716program, the department shall observe the procedures specified
1717under the federally approved state implementation plan,
1718including public notice, public comment, public hearing, and
1719notice of applications and amendments to federal, state, and
1720local agencies, to assure that all such permits issued in
1721coordination with the certification of a power plant under this
1722act are federally enforceable and are issued after opportunity
1723for informed public participation regarding the terms and
1724conditions thereof. When possible, any hearing on a federally
1725approved or delegated program permit such as new source review,
1726prevention of significant deterioration permit, or NPDES permit
1727shall be conducted in conjunction with the certification hearing
1728held under this act. The department shall accept written comment
1729with respect to an application for, or the department's
1730preliminary determination on, a new source review or prevention
1731of significant deterioration permit for a period of no less than
173230 days from the date notice of such action is published. Upon
1733request submitted within 30 days after published notice, the
1734department shall hold a public meeting, in the area affected,
1735for the purpose of receiving public comment on issues related to
1736the new source review or prevention of significant deterioration
1737permit. If requested following notice of the department's
1738preliminary determination, the public meeting to receive public
1739comment shall be held prior to the scheduled certification
1740hearing. The department shall also solicit comments from the
1741United States Environmental Protection Agency and other affected
1742federal agencies regarding the department's preliminary
1743determination for any federally required new source review or
1744prevention of significant deterioration permit. It is the intent
1745of the Legislature that the review, processing, and issuance of
1746such federally delegated or approved permits be closely
1747coordinated with the certification process established under
1748this part. In the event of a conflict between the certification
1749process and federally required procedures contained in the state
1750implementation plan, the applicable federal requirements of the
1751implementation plan shall control.
1752     Section 30.  Section 403.509, Florida Statutes, is amended
1753to read:
1754     403.509  Final disposition of application.--
1755     (1)(a)  If the administrative law judge has granted a
1756request to cancel the certification hearing and has relinquished
1757jurisdiction to the department under the provisions of s.
1758403.508(6), within 40 days thereafter, the secretary of the
1759department shall act upon the application by written order in
1760accordance with the terms of this act and the stipulation of the
1761parties in requesting cancellation of the certification hearing.
1762     (b)  If the administrative law judge has not granted a
1763request to cancel the certification hearing under the provisions
1764of s. 403.508(6), within 60 days after receipt of the designated
1765administrative law judge's recommended order, the board shall
1766act upon the application by written order, approving
1767certification or denying certification the issuance of a
1768certificate, in accordance with the terms of this act, and
1769stating the reasons for issuance or denial. If certification the
1770certificate is denied, the board shall set forth in writing the
1771action the applicant would have to take to secure the board's
1772approval of the application.
1773     (2)  The issues that may be raised in any hearing before
1774the board shall be limited to those matters raised in the
1775certification proceeding before the administrative law judge or
1776raised in the recommended order. All parties, or their
1777representatives, or persons who appear before the board shall be
1778subject to the provisions of s. 120.66.
1779     (3)  In determining whether an application should be
1780approved in whole, approved with modifications or conditions, or
1781denied, the board, or secretary when applicable, shall consider
1782whether, and the extent to which, the location of the electrical
1783power plant and directly associated facilities and their
1784construction and operation will:
1785     (a)  Provide reasonable assurance that operational
1786safeguards are technically sufficient for the public welfare and
1787protection.
1788     (b)  Comply with applicable nonprocedural requirements of
1789agencies.
1790     (c)  Be consistent with applicable local government
1791comprehensive plans and land development regulations.
1792     (d)  Meet the electrical energy needs of the state in an
1793orderly and timely fashion.
1794     (e)  Provide a reasonable balance between the need for the
1795facility as established pursuant to s. 403.519, and the impacts
1796upon air and water quality, fish and wildlife, water resources,
1797and other natural resources of the state resulting from the
1798construction and operation of the facility.
1799     (f)  Minimize, through the use of reasonable and available
1800methods, the adverse effects on human health, the environment,
1801and the ecology of the land and its wildlife and the ecology of
1802state waters and their aquatic life.
1803     (g)  Serve and protect the broad interests of the public.
1804     (3)  Within 30 days after issuance of the certification,
1805the department shall issue and forward to the United States
1806Environmental Protection Agency a proposed operation permit for
1807a major source of air pollution and must issue or deny any other
1808license required pursuant to any federally delegated or approved
1809permit program. The department's action on the license and its
1810action on the proposed operation permit for a major source of
1811air pollution shall be based upon the record and recommended
1812order of the certification hearing. The department's actions on
1813a federally required new source review or prevention of
1814significant deterioration permit shall be based on the record
1815and recommended order of the certification hearing and of any
1816other proceeding held in connection with the application for a
1817new source review or prevention of significant deterioration
1818permit, on timely public comments received with respect to the
1819application or preliminary determination for such permit, and on
1820the provisions of the state implementation plan.
1821     (4)  The department's action on a federally required new
1822source review or prevention of significant deterioration permit
1823shall differ from the actions taken by the siting board
1824regarding the certification if the federally approved state
1825implementation plan requires such a different action to be taken
1826by the department. Nothing in this part shall be construed to
1827displace the department's authority as the final permitting
1828entity under the federally approved permit program. Nothing in
1829this part shall be construed to authorize the issuance of a new
1830source review or prevention of significant deterioration permit
1831which does not conform to the requirements of the federally
1832approved state implementation plan. Any final operation permit
1833for a major source of air pollution must be issued in accordance
1834with the provisions of s. 403.0872. Unless the federally
1835delegated or approved permit program provides otherwise,
1836licenses issued by the department under this subsection shall be
1837effective for the term of the certification issued by the board.
1838If renewal of any license issued by the department pursuant to a
1839federally delegated or approved permit program is required, such
1840renewal shall not affect the certification issued by the board,
1841except as necessary to resolve inconsistencies pursuant to s.
1842403.516(1)(a).
1843     (5)(4)  In regard to the properties and works of any agency
1844which is a party to the certification hearing, the board shall
1845have the authority to decide issues relating to the use, the
1846connection thereto, or the crossing thereof, for the electrical
1847power plant and directly associated facilities site and to
1848direct any such agency to execute, within 30 days after the
1849entry of certification, the necessary license or easement for
1850such use, connection, or crossing, subject only to the
1851conditions set forth in such certification. However, the
1852applicant shall seek any necessary interest in state lands the
1853title to which is vested in the Board of Trustees of the
1854Internal Improvement Trust Fund from the Board of Trustees or
1855from the governing board of the water management district
1856created pursuant to chapter 373 before, during, or after the
1857certification proceeding, and certification may be made
1858contingent upon issuance of the appropriate interest. Neither
1859the applicant nor any party to the certification proceeding may
1860directly or indirectly raise or relitigate any matter that was
1861or could have been an issue in the certification proceeding in
1862any proceeding before the Board of Trustees of the Internal
1863Improvement Trust Fund wherein the applicant is seeking
1864necessary interest in state lands, but the information presented
1865in the certification proceeding shall be available for review by
1866the Board of Trustees and its staff.
1867     (6)(5)  Except as specified in subsection (4) for the
1868issuance of any operation permit for a major source of air
1869pollution pursuant to s. 403.0872, the issuance or denial of the
1870certification by the board or secretary of the department and
1871the issuance or denial of any related department license
1872required pursuant to any federally delegated or approved permit
1873program shall be the final administrative action required as to
1874that application.
1875     (6)  All certified electrical power plants must apply for
1876and obtain a major source air-operation permit pursuant to s.
1877403.0872. Major source air-operation permit applications for
1878certified electrical power plants must be submitted pursuant to
1879a schedule developed by the department. To the extent that any
1880conflicting provision, limitation, or restriction under any
1881rule, regulation, or ordinance imposed by any political
1882subdivision of the state, or by any local pollution control
1883program, was superseded during the certification process
1884pursuant to s. 403.510(1), such rule, regulation, or ordinance
1885shall continue to be superseded for purposes of the major source
1886air-operation permit program under s. 403.0872.
1887     Section 31.  Section 403.511, Florida Statutes, is amended
1888to read:
1889     403.511  Effect of certification.--
1890     (1)  Subject to the conditions set forth therein, any
1891certification signed by the Governor shall constitute the sole
1892license of the state and any agency as to the approval of the
1893site and the construction and operation of the proposed
1894electrical power plant, except for the issuance of department
1895licenses required under any federally delegated or approved
1896permit program and except as otherwise provided in subsection
1897(4).
1898     (2)(a)  The certification shall authorize the licensee
1899applicant named therein to construct and operate the proposed
1900electrical power plant, subject only to the conditions of
1901certification set forth in such certification, and except for
1902the issuance of department licenses or permits required under
1903any federally delegated or approved permit program.
1904     (b)1.  Except as provided in subsection (4), the
1905certification may include conditions which constitute variances,
1906exemptions, or exceptions from nonprocedural requirements of the
1907department or any agency which were expressly considered during
1908the proceeding, including, but not limited to, any site specific
1909criteria, standards, or limitations under local land use and
1910zoning approvals which affect the proposed electrical power
1911plant or its site, unless waived by the agency as provided below
1912and which otherwise would be applicable to the construction and
1913operation of the proposed electrical power plant.
1914     2.  No variance, exemption, exception, or other relief
1915shall be granted from a state statute or rule for the protection
1916of endangered or threatened species, aquatic preserves,
1917Outstanding National Resource Waters, or Outstanding Florida
1918Waters or for the disposal of hazardous waste, except to the
1919extent authorized by the applicable statute or rule or except
1920upon a finding in the certification order by the siting board
1921that the public interests set forth in s. 403.509(3) 403.502 in
1922certifying the electrical power plant at the site proposed by
1923the applicant overrides the public interest protected by the
1924statute or rule from which relief is sought. Each party shall
1925notify the applicant and other parties at least 60 days prior to
1926the certification hearing of any nonprocedural requirements not
1927specifically listed in the application from which a variance,
1928exemption, exception, or other relief is necessary in order for
1929the board to certify any electrical power plant proposed for
1930certification. Failure of such notification by an agency shall
1931be treated as a waiver from nonprocedural requirements of the
1932department or any other agency. However, no variance shall be
1933granted from standards or regulations of the department
1934applicable under any federally delegated or approved permit
1935program, except as expressly allowed in such program.
1936     (3)  The certification and any order on land use and zoning
1937issued under this act shall be in lieu of any license, permit,
1938certificate, or similar document required by any state,
1939regional, or local agency pursuant to, but not limited to,
1940chapter 125, chapter 161, chapter 163, chapter 166, chapter 186,
1941chapter 253, chapter 298, chapter 370, chapter 373, chapter 376,
1942chapter 380, chapter 381, chapter 387, chapter 403, except for
1943permits issued pursuant to any federally delegated or approved
1944permit program s. 403.0885 and except as provided in s.
1945403.509(3) and (6), chapter 404, or the Florida Transportation
1946Code, or 33 U.S.C. s. 1341.
1947     (4)  This act shall not affect in any way the ratemaking
1948powers of the Public Service Commission under chapter 366; nor
1949shall this act in any way affect the right of any local
1950government to charge appropriate fees or require that
1951construction be in compliance with applicable building
1952construction codes.
1953     (5)(a)  An electrical power plant certified pursuant to
1954this act shall comply with rules adopted by the department
1955subsequent to the issuance of the certification which prescribe
1956new or stricter criteria, to the extent that the rules are
1957applicable to electrical power plants. Except when express
1958variances, exceptions, exemptions, or other relief have been
1959granted, subsequently adopted rules which prescribe new or
1960stricter criteria shall operate as automatic modifications to
1961certifications.
1962     (b)  Upon written notification to the department, any
1963holder of a certification issued pursuant to this act may choose
1964to operate the certified electrical power plant in compliance
1965with any rule subsequently adopted by the department which
1966prescribes criteria more lenient than the criteria required by
1967the terms and conditions in the certification which are not
1968site-specific.
1969     (c)  No term or condition of certification shall be
1970interpreted to preclude the postcertification exercise by any
1971party of whatever procedural rights it may have under chapter
1972120, including those related to rulemaking proceedings. This
1973subsection shall apply to previously issued certifications.
1974     (6)  No term or condition of a site certification shall be
1975interpreted to supersede or control the provisions of a final
1976operation permit for a major source of air pollution issued by
1977the department pursuant to s. 403.0872 to a such facility
1978certified under this part.
1979     (7)  Pursuant to s. 380.23, electrical power plants are
1980subject to the federal coastal consistency review program.
1981Issuance of certification shall constitute the state's
1982certification of coastal zone consistency.
1983     Section 32.  Section 403.5112, Florida Statutes, is created
1984to read:
1985     403.5112  Filing of notice of certified corridor route.--
1986     (1)  Within 60 days after certification of a directly
1987associated linear facility pursuant to this act, the applicant
1988shall file, in accordance with s. 28.222, with the department
1989and the clerk of the circuit court for each county through which
1990the corridor will pass, a notice of the certified route.
1991     (2)  The notice shall consist of maps or aerial photographs
1992in the scale of 1:24,000 which clearly show the location of the
1993certified route and shall state that the certification of the
1994corridor will result in the acquisition of rights-of-way within
1995the corridor. Each clerk shall record the filing in the official
1996record of the county for the duration of the certification or
1997until such time as the applicant certifies to the department and
1998the clerk that all lands required for the transmission line
1999rights-of-way within the corridor have been acquired within such
2000county, whichever is sooner.
2001     Section 33.  Section 403.5113, Florida Statutes, is created
2002to read:
2003     403.5113  Postcertification amendments.--
2004     (1)  If, subsequent to certification by the board, a
2005licensee proposes any material change to the application and
2006revisions or amendments thereto, as certified, the licensee
2007shall submit a written request for amendment and a description
2008of the proposed change to the application to the department.
2009Within 30 days after the receipt of the request for the
2010amendment, the department shall determine whether the proposed
2011change to the application requires a modification of the
2012conditions of certification.
2013     (2)  If the department concludes that the change would not
2014require a modification of the conditions of certification, the
2015department shall provide written notification of the approval of
2016the proposed amendment to the licensee, all agencies, and all
2017other parties.
2018     (3)  If the department concludes that the change would
2019require a modification of the conditions of certification, the
2020department shall provide written notification to the licensee
2021that the proposed change to the application requires a request
2022for modification pursuant to s. 403.516.
2023     Section 34.  Section 403.5115, Florida Statutes, is amended
2024to read:
2025     403.5115  Public notice; costs of proceeding.--
2026     (1)  The following notices are to be published by the
2027applicant:
2028     (a)  Notice A notice of the filing of a notice of intent
2029under s. 403.5063, which shall be published within 21 days after
2030the filing of the notice. The notice shall be published as
2031specified by subsection (2), except that the newspaper notice
2032shall be one-fourth page in size in a standard size newspaper or
2033one-half page in size in a tabloid size newspaper.
2034     (b)  Notice A notice of filing of the application, which
2035shall include a description of the proceedings required by this
2036act, within 21 days after the date of the application filing be
2037published as specified in subsection (2), within 15 days after
2038the application has been determined complete. Such notice shall
2039give notice of the provisions of s. 403.511(1) and (2) and that
2040the application constitutes a request for a federally required
2041new source review or prevention of significant deterioration
2042permit.
2043     (c)  Notice of the land use determination made pursuant to
2044s. 403.50665(1) within 15 days after the determination is filed.
2045     (d)  Notice of the land use hearing, which shall be
2046published as specified in subsection (2), no later than 15 45
2047days before the hearing.
2048     (e)(d)  Notice of the certification hearing and notice of
2049the deadline for filing notice of intent to be a party, which
2050shall be published as specified in subsection (2), at least 65
2051days before the date set for the certification no later than 45
2052days before the hearing.
2053     (f)  Notice of the cancellation of the certification
2054hearing, if applicable, no later than 3 days before the date of
2055the originally scheduled certification hearing.
2056     (g)(e)  Notice of modification when required by the
2057department, based on whether the requested modification of
2058certification will significantly increase impacts to the
2059environment or the public. Such notice shall be published as
2060specified under subsection (2):
2061     1.  Within 21 days after receipt of a request for
2062modification., except that The newspaper notice shall be of a
2063size as directed by the department commensurate with the scope
2064of the modification.
2065     2.  If a hearing is to be conducted in response to the
2066request for modification, then notice shall be published no
2067later than 30 days before the hearing provided as specified in
2068paragraph (d).
2069     (h)(f)  Notice of a supplemental application, which shall
2070be published as specified in paragraph (b) and subsection
2071(2).follows:
2072     1.  Notice of receipt of the supplemental application shall
2073be published as specified in paragraph (b).
2074     2.  Notice of the certification hearing shall be published
2075as specified in paragraph (d).
2076     (i)  Notice of existing site certification pursuant to s.
2077403.5175. Notices shall be published as specified in paragraph
2078(b) and subsection (2).
2079     (2)  Notices provided by the applicant shall be published
2080in newspapers of general circulation within the county or
2081counties in which the proposed electrical power plant will be
2082located. The newspaper notices shall be at least one-half page
2083in size in a standard size newspaper or a full page in a tabloid
2084size newspaper and published in a section of the newspaper other
2085than the legal notices section. These notices shall include a
2086map generally depicting the project and all associated
2087facilities corridors. A newspaper of general circulation shall
2088be the newspaper which has the largest daily circulation in that
2089county and has its principal office in that county. If the
2090newspaper with the largest daily circulation has its principal
2091office outside the county, the notices shall appear in both the
2092newspaper having the largest circulation in that county and in a
2093newspaper authorized to publish legal notices in that county.
2094     (3)  All notices published by the applicant shall be paid
2095for by the applicant and shall be in addition to the application
2096fee.
2097     (4)  The department shall arrange for publication of the
2098following notices in the manner specified by chapter 120 and
2099provide copies of those notices to any persons who have
2100requested to be placed on the departmental mailing list for this
2101purpose:
2102     (a)  Notice Publish in the Florida Administrative Weekly
2103notices of the filing of the notice of intent within 15 days
2104after receipt of the notice.;
2105     (b)  Notice of the filing of the application, no later than
210621 days after the application filing.;
2107     (c)  Notice of the land use determination made pursuant to
2108s. 403.50665(1) within 15 days after the determination is filed.
2109     (d)  Notice of the land use hearing before the
2110administrative law judge, if applicable, no later than 15 days
2111before the hearing.;
2112     (e)  Notice of the land use hearing before the board, if
2113applicable.
2114     (f)  Notice of the certification hearing at least 45 days
2115before the date set for the certification hearing.;
2116     (g)  Notice of the cancellation of the certification
2117hearing, if applicable, no later than 3 days prior to the date
2118of the originally scheduled certification hearing.
2119     (h)  Notice of the hearing before the board, if
2120applicable.;
2121     (i)  Notice and of stipulations, proposed agency action, or
2122petitions for modification.; and
2123     (b)  Provide copies of those notices to any persons who
2124have requested to be placed on the departmental mailing list for
2125this purpose.
2126     (5)  The applicant shall pay those expenses and costs
2127associated with the conduct of the hearings and the recording
2128and transcription of the proceedings.
2129     Section 35.  Section 403.513, Florida Statutes, is amended
2130to read:
2131     403.513  Review.--Proceedings under this act shall be
2132subject to judicial review as provided in chapter 120. When
2133possible, separate appeals of the certification order issued by
2134the board and of any department permit issued pursuant to a
2135federally delegated or approved permit program may shall be
2136consolidated for purposes of judicial review.
2137     Section 36.  Section 403.516, Florida Statutes, is amended
2138to read:
2139     403.516  Modification of certification.--
2140     (1)  A certification may be modified after issuance in any
2141one of the following ways:
2142     (a)  The board may delegate to the department the authority
2143to modify specific conditions in the certification.
2144     (b)1.  The department may modify specific conditions of a
2145site certification which are inconsistent with the terms of any
2146federally delegated or approved final air pollution operation
2147permit for the certified electrical power plant issued by the
2148United States Environmental Protection Agency under the terms of
214942 U.S.C. s. 7661d.
2150     2.  Such modification may be made without further notice if
2151the matter has been previously noticed under the requirements
2152for any federally delegated or approved permit program.
2153     (c)  The licensee may file a petition for modification with
2154the department, or the department may initiate the modification
2155upon its own initiative.
2156     1.  A petition for modification must set forth:
2157     a.  The proposed modification.
2158     b.  The factual reasons asserted for the modification.
2159     c.  The anticipated environmental effects of the proposed
2160modification.
2161     2.(b)  The department may modify the terms and conditions
2162of the certification if no party to the certification hearing
2163objects in writing to such modification within 45 days after
2164notice by mail to such party's last address of record, and if no
2165other person whose substantial interests will be affected by the
2166modification objects in writing within 30 days after issuance of
2167public notice.
2168     3.  If objections are raised or the department denies the
2169request, the applicant or department may file a request petition
2170for a hearing on the modification with the department. Such
2171request shall be handled pursuant to chapter 120 paragraph (c).
2172     (c)  A petition for modification may be filed by the
2173applicant or the department setting forth:
2174     1.  The proposed modification,
2175     2.  The factual reasons asserted for the modification, and
2176     3.  The anticipated effects of the proposed modification on
2177the applicant, the public, and the environment.
2178
2179The petition for modification shall be filed with the department
2180and the Division of Administrative Hearings.
2181     4.  Requests referred to the Division of Administrative
2182Hearings shall be disposed of in the same manner as an
2183application, but with time periods established by the
2184administrative law judge commensurate with the significance of
2185the modification requested.
2186     (d)  As required by s. 403.511(5).
2187     (2)  Petitions filed pursuant to paragraph (1)(c) shall be
2188disposed of in the same manner as an application, but with time
2189periods established by the administrative law judge commensurate
2190with the significance of the modification requested.
2191     (2)(3)  Any agreement or modification under this section
2192must be in accordance with the terms of this act. No
2193modification to a certification shall be granted that
2194constitutes a variance from standards or regulations of the
2195department applicable under any federally delegated or approved
2196permit program, except as expressly allowed in such program.
2197     Section 37.  Section 403.517, Florida Statutes, is amended
2198to read:
2199     403.517  Supplemental applications for sites certified for
2200ultimate site capacity.--
2201     (1)(a)  Supplemental The department shall adopt rules
2202governing the processing of supplemental applications may be
2203submitted for certification of the construction and operation of
2204electrical power plants to be located at sites which have been
2205previously certified for an ultimate site capacity pursuant to
2206this act. Supplemental applications shall be limited to
2207electrical power plants using the fuel type previously certified
2208for that site. Such applications shall include all new directly
2209associated facilities that support the construction and
2210operation of the electrical power plant. The rules adopted
2211pursuant to this section shall include provisions for:
2212     1.  Prompt appointment of a designated administrative law
2213judge.
2214     2.  The contents of the supplemental application.
2215     3.  Resolution of disputes as to the completeness and
2216sufficiency of supplemental applications by the designated
2217administrative law judge.
2218     4.  Public notice of the filing of the supplemental
2219applications.
2220     5.  Time limits for prompt processing of supplemental
2221applications.
2222     6.  Final disposition by the board within 215 days of the
2223filing of a complete supplemental application.
2224     (b)  The review shall use the same procedural steps and
2225notices as for an initial application.
2226     (c)  The time limits for the processing of a complete
2227supplemental application shall be designated by the department
2228commensurate with the scope of the supplemental application, but
2229shall not exceed any time limitation governing the review of
2230initial applications for site certification pursuant to this
2231act, it being the legislative intent to provide shorter time
2232limitations for the processing of supplemental applications for
2233electrical power plants to be constructed and operated at sites
2234which have been previously certified for an ultimate site
2235capacity.
2236     (d)(c)  Any time limitation in this section or in rules
2237adopted pursuant to this section may be altered pursuant to s.
2238403.5095 by the designated administrative law judge upon
2239stipulation between the department and the applicant, unless
2240objected to by any party within 5 days after notice, or for good
2241cause shown by any party. The parties to the proceeding shall
2242adhere to the provisions of chapter 120 and this act in
2243considering and processing such supplemental applications.
2244     (2)  Supplemental applications shall be reviewed as
2245provided in ss. 403.507-403.511, except that the time limits
2246provided in this section shall apply to such supplemental
2247applications.
2248     (3)  The land use and zoning consistency determination of
2249s. 403.50665 hearing requirements of s. 403.508(1) and (2) shall
2250not be applicable to the processing of supplemental applications
2251pursuant to this section so long as:
2252     (a)  The previously certified ultimate site capacity is not
2253exceeded; and
2254     (b)  The lands required for the construction or operation
2255of the electrical power plant which is the subject of the
2256supplemental application are within the boundaries of the
2257previously certified site.
2258     (4)  For the purposes of this act, the term "ultimate site
2259capacity" means the maximum generating capacity for a site as
2260certified by the board.
2261     Section 38.  Section 403.5175, Florida Statutes, is amended
2262to read:
2263     403.5175  Existing electrical power plant site
2264certification.--
2265     (1)  An electric utility that owns or operates an existing
2266electrical power plant as defined in s. 403.503(12) may apply
2267for certification of an existing power plant and its site in
2268order to obtain all agency licenses necessary to ensure assure
2269compliance with federal or state environmental laws and
2270regulation using the centrally coordinated, one-stop licensing
2271process established by this part. An application for site
2272certification under this section must be in the form prescribed
2273by department rule. Applications must be reviewed and processed
2274using the same procedural steps and notices as for an
2275application for a new facility in accordance with ss. 403.5064-
2276403.5115, except that a determination of need by the Public
2277Service Commission is not required.
2278     (2)  An application for certification under this section
2279must include:
2280     (a)  A description of the site and existing power plant
2281installations;
2282     (b)  A description of all proposed changes or alterations
2283to the site or electrical power plant, including all new
2284associated facilities that are the subject of the application;
2285     (c)  A description of the environmental and other impacts
2286caused by the existing utilization of the site and directly
2287associated facilities, and the operation of the electrical power
2288plant that is the subject of the application, and of the
2289environmental and other benefits, if any, to be realized as a
2290result of the proposed changes or alterations if certification
2291is approved and such other information as is necessary for the
2292reviewing agencies to evaluate the proposed changes and the
2293expected impacts;
2294     (d)  The justification for the proposed changes or
2295alterations;
2296     (e)  Copies of all existing permits, licenses, and
2297compliance plans authorizing utilization of the site and
2298directly associated facilities or operation of the electrical
2299power plant that is the subject of the application.
2300     (3)  The land use and zoning determination hearing
2301requirements of s. 403.50665 s. 403.508(1) and (2) do not apply
2302to an application under this section if the applicant does not
2303propose to expand the boundaries of the existing site. If the
2304applicant proposes to expand the boundaries of the existing site
2305to accommodate portions of the plant or associated facilities, a
2306land use and zoning determination shall be made hearing must be
2307held as specified in s. 403.50665 s. 403.508(1) and (2);
2308provided, however, that the sole issue for determination through
2309the land use hearing is whether the proposed site expansion is
2310consistent and in compliance with the existing land use plans
2311and zoning ordinances.
2312     (4)  In considering whether an application submitted under
2313this section should be approved in whole, approved with
2314appropriate conditions, or denied, the board shall consider
2315whether, and to the extent to which the proposed changes to the
2316electrical power plant and its continued operation under
2317certification will:
2318     (a)  Comply with the provisions of s. 403.509(3).
2319applicable nonprocedural requirements of agencies;
2320     (b)  Result in environmental or other benefits compared to
2321current utilization of the site and operations of the electrical
2322power plant if the proposed changes or alterations are
2323undertaken.;
2324     (c)  Minimize, through the use of reasonable and available
2325methods, the adverse effects on human health, the environment,
2326and the ecology of the land and its wildlife and the ecology of
2327state waters and their aquatic life; and
2328     (d)  Serve and protect the broad interests of the public.
2329     (5)  An applicant's failure to receive approval for
2330certification of an existing site or an electrical power plant
2331under this section is without prejudice to continued operation
2332of the electrical power plant or site under existing agency
2333licenses.
2334     Section 39.  Section 403.518, Florida Statutes, is amended
2335to read:
2336     403.518  Fees; disposition.--
2337     (1)  The department shall charge the applicant the
2338following fees, as appropriate, which, unless otherwise
2339specified, shall be paid into the Florida Permit Fee Trust Fund:
2340     (1)(a)  A fee for a notice of intent pursuant to s.
2341403.5063, in the amount of $2,500, to be submitted to the
2342department at the time of filing of a notice of intent. The
2343notice-of-intent fee shall be used and disbursed in the same
2344manner as the application fee.
2345     (2)(b)  An application fee, which shall not exceed
2346$200,000. The fee shall be fixed by rule on a sliding scale
2347related to the size, type, ultimate site capacity, or increase
2348in electrical generating capacity proposed by the application,
2349or the number and size of local governments in whose
2350jurisdiction the electrical power plant is located.
2351     (a)1.  Sixty percent of the fee shall go to the department
2352to cover any costs associated with coordinating the review
2353reviewing and acting upon the application, to cover any field
2354services associated with monitoring construction and operation
2355of the facility, and to cover the costs of the public notices
2356published by the department.
2357     (b)2.  The following percentages Twenty percent of the fee
2358or $25,000, whichever is greater, shall be transferred to the
2359Administrative Trust Fund of the Division of Administrative
2360Hearings of the Department of Management Services:.
2361     1.  Five percent to compensate expenses from the initial
2362exercise of duties associated with the filing of an application.
2363     2.  An additional 5 percent if a land use hearing is held
2364pursuant to s. 403.508.
2365     3.  An additional 10 percent if a certification hearing is
2366held pursuant to s. 403.508.
2367     (c)1.3.  Upon written request with proper itemized
2368accounting within 90 days after final agency action by the board
2369or withdrawal of the application, the agencies that prepared
2370reports pursuant to s. 403.507 or participated in a hearing
2371pursuant to s. 403.508 may submit a written request to the
2372department for reimbursement of expenses incurred during the
2373certification proceedings. The request shall contain an
2374accounting of expenses incurred which may include time spent
2375reviewing the application, the department shall reimburse the
2376Department of Community Affairs, the Fish and Wildlife
2377Conservation Commission, and any water management district
2378created pursuant to chapter 373, regional planning council, and
2379local government in the jurisdiction of which the proposed
2380electrical power plant is to be located, and any other agency
2381from which the department requests special studies pursuant to
2382s. 403.507(2)(a)7. Such reimbursement shall be authorized for
2383the preparation of any studies required of the agencies by this
2384act, and for agency travel and per diem to attend any hearing
2385held pursuant to this act, and for any agency or local
2386government's provision of notice of public meetings or hearings
2387required as a result of the application for certification
2388governments to participate in the proceedings. The department
2389shall review the request and verify that the expenses are valid.
2390Valid expenses shall be reimbursed; however, in the event the
2391amount of funds available for reimbursement allocation is
2392insufficient to provide for full compensation complete
2393reimbursement to the agencies requesting reimbursement,
2394reimbursement shall be on a prorated basis.
2395     2.  If the application review is held in abeyance for more
2396than 1 year, the agencies may submit a request for
2397reimbursement.
2398     (d)4.  If any sums are remaining, the department shall
2399retain them for its use in the same manner as is otherwise
2400authorized by this act; provided, however, that if the
2401certification application is withdrawn, the remaining sums shall
2402be refunded to the applicant within 90 days after withdrawal.
2403     (3)(a)(c)  A certification modification fee, which shall
2404not exceed $30,000. The department shall establish rules for
2405determining such a fee based on the equipment redesign, change
2406in site size, type, increase in generating capacity proposed, or
2407change in an associated linear facility location.
2408     (b)  The fee shall be submitted to the department with a
2409formal petition for modification to the department pursuant to
2410s. 403.516. This fee shall be established, disbursed, and
2411processed in the same manner as the application fee in
2412subsection (2) paragraph (b), except that the Division of
2413Administrative Hearings shall not receive a portion of the fee
2414unless the petition for certification modification is referred
2415to the Division of Administrative Hearings for hearing. If the
2416petition is so referred, only $10,000 of the fee shall be
2417transferred to the Administrative Trust Fund of the Division of
2418Administrative Hearings of the Department of Management
2419Services. The fee for a modification by agreement filed pursuant
2420to s. 403.516(1)(b) shall be $10,000 to be paid upon the filing
2421of the request for modification. Any sums remaining after
2422payment of authorized costs shall be refunded to the applicant
2423within 90 days of issuance or denial of the modification or
2424withdrawal of the request for modification.
2425     (4)(d)  A supplemental application fee, not to exceed
2426$75,000, to cover all reasonable expenses and costs of the
2427review, processing, and proceedings of a supplemental
2428application. This fee shall be established, disbursed, and
2429processed in the same manner as the certification application
2430fee in subsection (2) paragraph (b), except that only $20,000 of
2431the fee shall be transferred to the Administrative Trust Fund of
2432the Division of Administrative Hearings of the Department of
2433Management Services.
2434     (5)(e)  An existing site certification application fee, not
2435to exceed $200,000, to cover all reasonable costs and expenses
2436of the review processing and proceedings for certification of an
2437existing power plant site under s. 403.5175. This fee must be
2438established, disbursed, and processed in the same manner as the
2439certification application fee in subsection (2) paragraph (b).
2440     (2)  Effective upon the date commercial operation begins,
2441the operator of an electrical power plant certified under this
2442part is required to pay to the department an annual operation
2443license fee as specified in s. 403.0872(11) to be deposited in
2444the Air Pollution Control Trust Fund.
2445     Section 40.  Any application for electrical power plant
2446certification filed pursuant to ss. 403.501-403.518, Florida
2447Statutes, shall be processed under the provisions of the law
2448applicable at the time the application was filed, except that
2449the provisions relating to cancellation of the certification
2450hearing under s. 403.508(6), Florida Statutes, the provisions
2451relating to the final disposition of the application and
2452issuance of the written order by the secretary under s.
2453403.509(1)(a), Florida Statutes, and notice of the cancellation
2454of the certification hearing under s. 403.5115, Florida
2455Statutes, may apply to any application for electrical power
2456plant certification.
2457     Section 41.  Section 403.519, Florida Statutes, is amended
2458to read:
2459     403.519  Exclusive forum for determination of need.--
2460     (1)  On request by an applicant or on its own motion, the
2461commission shall begin a proceeding to determine the need for an
2462electrical power plant subject to the Florida Electrical Power
2463Plant Siting Act.
2464     (2)  The applicant commission shall publish a notice of the
2465proceeding in a newspaper of general circulation in each county
2466in which the proposed electrical power plant will be located.
2467The notice shall be at least one-quarter of a page and published
2468at least 21 45 days prior to the scheduled date for the
2469proceeding. The commission shall publish notice of the
2470proceeding in the manner specified by chapter 120 at least 21
2471days prior to the scheduled date for the proceeding.
2472     (3)  The commission shall be the sole forum for the
2473determination of this matter, which accordingly shall not be
2474raised in any other forum or in the review of proceedings in
2475such other forum. In making its determination, the commission
2476shall take into account the need for electric system reliability
2477and integrity, the need for adequate electricity at a reasonable
2478cost, the need for fuel diversity and supply reliability, and
2479whether the proposed plant is the most cost-effective
2480alternative available. The commission shall also expressly
2481consider the conservation measures taken by or reasonably
2482available to the applicant or its members which might mitigate
2483the need for the proposed plant and other matters within its
2484jurisdiction which it deems relevant. The commission's
2485determination of need for an electrical power plant shall create
2486a presumption of public need and necessity and shall serve as
2487the commission's report required by s. 403.507(4)
2488403.507(2)(a)2. An order entered pursuant to this section
2489constitutes final agency action.
2490     Section 42.  Section 403.885, Florida Statutes, is amended
2491to read:
2492     403.885  Water Projects Stormwater management; wastewater
2493management; and Water Restoration Grant Program.--
2494     (1)  The Department of Environmental Protection shall
2495administer a grant program to use funds transferred pursuant to
2496s. 212.20 to the Ecosystem Management and Restoration Trust Fund
2497or other moneys as appropriated by the Legislature for water
2498quality improvement, stormwater management, wastewater
2499management, and water restoration project grants. Eligible
2500recipients of such grants include counties, municipalities,
2501water management districts, and special districts that have
2502legal responsibilities for water quality improvement, water
2503management, stormwater management, wastewater management, lake
2504and river water restoration projects, and. drinking water
2505projects are not eligible for funding pursuant to this section.
2506     (2)  The grant program shall provide for the evaluation of
2507annual grant proposals. The department shall evaluate such
2508proposals to determine if they:
2509     (a)  Protect public health or and the environment.
2510     (b)  Implement plans developed pursuant to the Surface
2511Water Improvement and Management Act created in part IV of
2512chapter 373, other water restoration plans required by law,
2513management plans prepared pursuant to s. 403.067, or other plans
2514adopted by local government for water quality improvement and
2515water restoration.
2516     (3)  In addition to meeting the criteria in subsection (2),
2517annual grant proposals must also meet the following
2518requirements:
2519     (a)  An application for a stormwater management project may
2520be funded only if the application is approved by the water
2521management district with jurisdiction in the project area.
2522District approval must be based on a determination that the
2523project provides a benefit to a priority water body.
2524     (b)  Except as provided in paragraph (c), an application
2525for a wastewater management project may be funded only if:
2526     1.  The project has been funded previously through a line
2527item in the General Appropriations Act; and
2528     2.  The project is under construction.
2529     (c)  An application for a wastewater management project
2530that would qualify as a water pollution control project and
2531activity in s. 403.1838 may be funded only if the project
2532sponsor has submitted an application to the department for
2533funding pursuant to that section.
2534     (4)  All project applicants must provide local matching
2535funds as follows:
2536     (a)  An applicant for state funding of a stormwater
2537management project shall provide local matching funds equal to
2538at least 50 percent of the total cost of the project; and
2539     (b)  An applicant for state funding of a wastewater
2540management project shall provide matching funds equal to at
2541least 25 percent of the total cost of the project.
2542
2543The requirement for matching funds may be waived if the
2544applicant is a financially disadvantaged small local government
2545as defined in subsection (5).
2546     (5)  Each fiscal year, at least 20 percent of the funds
2547available pursuant to this section shall be used for projects to
2548assist financially disadvantaged small local governments. For
2549purposes of this section, the term "financially disadvantaged
2550small local government" means a municipality having a population
2551of 7,500 or less, a county having a population of 35,000 or
2552less, according to the latest decennial census and a per capita
2553annual income less than the state per capita annual income as
2554determined by the United States Department of Commerce, or a
2555county in an area designated by the Governor as a rural area of
2556critical economic concern pursuant to s. 288.0656. Grants made
2557to these eligible local governments shall not require matching
2558local funds.
2559     (6)  Each year, stormwater management and wastewater
2560management projects submitted for funding through the
2561legislative process shall be submitted to the department by the
2562appropriate fiscal committees of the House of Representatives
2563and the Senate. The department shall review the projects and
2564must provide each fiscal committee with a list of projects that
2565appear to meet the eligibility requirements under this grant
2566program.
2567     Section 43.  For the 2006-2007 fiscal year, the sum of
2568$61,379 is appropriated from the General Revenue Fund to the
2569Department of Revenue for the purpose of administering the
2570energy-efficient products sales tax holiday.
2571     Section 44.  This act shall take effect upon becoming a
2572law.


CODING: Words stricken are deletions; words underlined are additions.