Florida Senate - 2007                        SENATOR AMENDMENT
    Bill No. SB 1202
                        Barcode 472028
                            CHAMBER ACTION
              Senate                               House
                                   .                    
                                   .                    
 1                                 .                    
                                   .                    
 2                                 .                    
                                   .                    
 3         Floor: 1/AD/2R          .                    
       04/26/2007 03:45 PM         .                    
 4  ______________________________________________________________
 5  
 6  
 7  
 8  
 9  
10  ______________________________________________________________
11  Senator Bennett moved the following amendment:
12  
13         Senate Amendment (with title amendment) 
14         On page 5, lines 1-19, delete those lines
15  
16  and insert:  
17         Section 2.  Subsection (4) is added to section 403.502,
18  Florida Statutes, to read:
19         403.502  Legislative intent.--The Legislature finds
20  that the present and predicted growth in electric power
21  demands in this state requires the development of a procedure
22  for the selection and utilization of sites for electrical
23  generating facilities and the identification of a state
24  position with respect to each proposed site. The Legislature
25  recognizes that the selection of sites and the routing of
26  associated transmission lines will have a significant impact
27  upon the welfare of the population, the location and growth of
28  industry, and the use of the natural resources of the state.
29  The Legislature finds that the efficiency of the permit
30  application and review process at both the state and local
31  level would be improved with the implementation of a process
                                  1
    1:47 PM   04/26/07                              s1202.21cu.00s

Florida Senate - 2007 SENATOR AMENDMENT Bill No. SB 1202 Barcode 472028 1 whereby a permit application would be centrally coordinated 2 and all permit decisions could be reviewed on the basis of 3 standards and recommendations of the deciding agencies. It is 4 the policy of this state that, while recognizing the pressing 5 need for increased power generation facilities, the state 6 shall ensure through available and reasonable methods that the 7 location and operation of electrical power plants will produce 8 minimal adverse effects on human health, the environment, the 9 ecology of the land and its wildlife, and the ecology of state 10 waters and their aquatic life and will not unduly conflict 11 with the goals established by the applicable local 12 comprehensive plans. It is the intent to seek courses of 13 action that will fully balance the increasing demands for 14 electrical power plant location and operation with the broad 15 interests of the public. Such action will be based on these 16 premises: 17 (4) To assure the citizens of Florida that renewable 18 energy sources and technologies, as well as conservation 19 measures, are utilized to the extent reasonably available. 20 Section 3. Subsections (3) and (4) of section 403.519, 21 Florida Statutes, are amended to read: 22 403.519 Exclusive forum for determination of need.-- 23 (3) The commission shall be the sole forum for the 24 determination of this matter, which accordingly shall not be 25 raised in any other forum or in the review of proceedings in 26 such other forum. In making its determination, the commission 27 shall take into account the need for electric system 28 reliability and integrity, the need for adequate electricity 29 at a reasonable cost, the need for fuel diversity and supply 30 reliability, and whether the proposed plant is the most 31 cost-effective alternative available, and whether renewable 2 1:47 PM 04/26/07 s1202.21cu.00s
Florida Senate - 2007 SENATOR AMENDMENT Bill No. SB 1202 Barcode 472028 1 energy sources and technologies, as well as conservation 2 measures, are utilized to the extent reasonably available. The 3 commission shall also expressly consider the conservation 4 measures taken by or reasonably available to the applicant or 5 its members which might mitigate the need for the proposed 6 plant and other matters within its jurisdiction which it deems 7 relevant. The commission's determination of need for an 8 electrical power plant shall create a presumption of public 9 need and necessity and shall serve as the commission's report 10 required by s. 403.507(4). An order entered pursuant to this 11 section constitutes final agency action. 12 (4) In making its determination on a proposed 13 electrical power plant using nuclear materials or synthesis 14 gas produced by integrated gasification combined cycle power 15 plant as fuel, the commission shall hold a hearing within 90 16 days after the filing of the petition to determine need and 17 shall issue an order granting or denying the petition within 18 135 days after the date of the filing of the petition. The 19 commission shall be the sole forum for the determination of 20 this matter and the issues addressed in the petition, which 21 accordingly shall not be reviewed in any other forum, or in 22 the review of proceedings in such other forum. In making its 23 determination to either grant or deny the petition, the 24 commission shall consider the need for electric system 25 reliability and integrity, including fuel diversity, the need 26 for base-load generating capacity, and the need for adequate 27 electricity at a reasonable cost, and whether renewable energy 28 sources and technologies, as well as conservation measures, 29 are utilized to the extent reasonably available. 30 31 3 1:47 PM 04/26/07 s1202.21cu.00s
Florida Senate - 2007 SENATOR AMENDMENT Bill No. SB 1202 Barcode 472028 1 ================ T I T L E A M E N D M E N T =============== 2 And the title is amended as follows: 3 On page 1, lines 9-15, delete those lines 4 5 and insert: 6 recovery; requiring a report; amending s. 7 403.502, F.S.; providing legislative intent for 8 the consideration of renewable energy sources 9 and technologies and conservation measures in 10 actions related to electrical power plant and 11 transmission line siting; amending s. 403.519, 12 F.S.; providing requirements and procedures for 13 determination of need for integrated 14 gasification combined cycle power plants; 15 requiring consideration of renewable energy 16 sources and technologies and conservation 17 measures in power plant siting determinations; 18 providing an exemption from purchased power 19 supply bid rules under certain circumstances; 20 providing an effective date. 21 22 23 24 25 26 27 28 29 30 31 4 1:47 PM 04/26/07 s1202.21cu.00s