Florida Senate - 2007                        SENATOR AMENDMENT
    Bill No. SB 1202
                        Barcode 652690
                            CHAMBER ACTION
              Senate                               House
                                   .                    
                                   .                    
 1                                 .                    
                                   .                    
 2                                 .                    
                                   .                    
 3         Floor: WD/2R            .                    
       04/26/2007 03:39 PM         .                    
 4  ______________________________________________________________
 5  
 6  
 7  
 8  
 9  
10  ______________________________________________________________
11  Senator Bennett moved the following amendment:
12  
13         Senate Amendment (with title amendment) 
14         On page 2, line 20 through page 4, line 20, delete
15  those lines
16  
17  and insert:  
18         (2)  Within 6 months after the enactment of this act,
19  the commission shall establish, by rule, alternative cost
20  recovery mechanisms for the recovery of costs incurred in the
21  siting, design, licensing, and construction of a nuclear or
22  advanced technology coal power plant. Such mechanisms shall be
23  designed to promote utility investment in nuclear or advanced
24  technology coal power plants and allow for the recovery in
25  rates of all prudently incurred costs, and shall include, but
26  are not limited to:
27         (a)  Recovery through the capacity cost recovery clause
28  of any preconstruction costs.
29         (b)  Recovery through an incremental increase in the
30  utility's capacity cost recovery clause rates of the carrying
31  costs on the utility's projected construction cost balance
                                  1
    8:15 AM   04/25/07                              s1202.21cu.00b

Florida Senate - 2007 SENATOR AMENDMENT Bill No. SB 1202 Barcode 652690 1 associated with the nuclear or advanced technology coal power 2 plant. To encourage investment and provide certainty, for 3 nuclear or advanced technology coal power plant need petitions 4 submitted on or before December 31, 2010, associated carrying 5 costs shall be equal to the pretax AFUDC in effect upon this 6 act becoming law. For nuclear or advanced technology coal 7 power plants for which need petitions are submitted after 8 December 31, 2010, the utility's existing pretax AFUDC rate is 9 presumed to be appropriate unless determined otherwise by the 10 commission in the determination of need for the nuclear or 11 advanced technology coal power plant. 12 (3) After a petition for determination of need is 13 granted, a utility may petition the commission for cost 14 recovery as permitted by this section and commission rules. 15 (4) When the nuclear or advanced technology coal power 16 plant is placed in commercial service, the utility shall be 17 allowed to increase its base rate charges by the projected 18 annual revenue requirements of the nuclear or advanced 19 technology coal power plant based on the jurisdictional annual 20 revenue requirements of the plant for the first 12 months of 21 operation. The rate of return on capital investments shall be 22 calculated using the utility's rate of return last approved by 23 the commission prior to the commercial inservice date of the 24 nuclear or advanced technology coal power plant. If any 25 existing generating plant is retired as a result of operation 26 of the nuclear or advanced technology coal power plant, the 27 commission shall allow for the recovery, through an increase 28 in base rate charges, of the net book value of the retired 29 plant over a period not to exceed 5 years. 30 (5) The utility shall report to the commission 31 annually the budgeted and actual costs as compared to the 2 8:15 AM 04/25/07 s1202.21cu.00b
Florida Senate - 2007 SENATOR AMENDMENT Bill No. SB 1202 Barcode 652690 1 estimated inservice cost of the nuclear or advanced technology 2 coal power plant provided by the utility pursuant to s. 3 403.519(4), until the commercial operation of the nuclear or 4 advanced technology coal power plant. The utility shall 5 provide such information on an annual basis following the 6 final order by the commission approving the determination of 7 need for the nuclear or advanced technology coal power plant, 8 with the understanding that some costs may be higher than 9 estimated and other costs may be lower. 10 (6) In the event the utility elects not to complete or 11 is precluded from completing construction of the nuclear or 12 advanced technology coal power plant, the utility shall be 13 allowed to recover all prudent preconstruction and 14 construction costs incurred following the commission's 15 issuance of a final order granting a determination of need for 16 the nuclear or advanced technology coal power plant. The 17 utility shall recover such costs through the capacity cost 18 recovery clause over a period equal to the period during which 19 the costs were incurred or 5 years, whichever is greater. The 20 unrecovered balance during the recovery period will accrue 21 interest at the utility's weighted average cost of capital as 22 reported in the commission's earnings surveillance reporting 23 requirement for the prior year. 24 25 26 ================ T I T L E A M E N D M E N T =============== 27 And the title is amended as follows: 28 On page 1, lines 1-9, delete those lines 29 30 and insert: 31 A bill to be entitled 3 8:15 AM 04/25/07 s1202.21cu.00b
Florida Senate - 2007 SENATOR AMENDMENT Bill No. SB 1202 Barcode 652690 1 An act relating to power plants; amending s. 2 366.93, F.S., revising definitions relating to 3 certain power plants; requiring the Florida 4 Public Service Commission to implement rules 5 relating to cost recovery; requiring a report; 6 amending s. 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 4 8:15 AM 04/25/07 s1202.21cu.00b