Florida Senate - 2007 SENATOR AMENDMENT
Bill No. SB 1202
Barcode 842132
CHAMBER ACTION
Senate House
.
.
1 .
.
2 .
.
3 Floor: WD/2R .
04/26/2007 03:38 PM .
4 ______________________________________________________________
5
6
7
8
9
10 ______________________________________________________________
11 Senator Bennett moved the following amendment:
12
13 Senate Amendment
14 On page 1, line 19, through page 2, line 19, delete
15 those lines
16
17 and insert:
18 Section 1. Section 366.93, Florida Statutes, is
19 amended to read:
20 366.93 Cost recovery for the siting, design,
21 licensing, and construction of nuclear and advanced technology
22 coal power plants.--
23 (1) As used in this section, the term:
24 (a) "Advanced technology coal power plant" means an
25 electrical power plant as defined in s. 403.503 which uses
26 coal as a fuel and either is an integrated gasification
27 combined cycle power plant or includes a demonstration project
28 for carbon capture and sequestration.
29 (b)(a) "Cost" includes, but is not limited to, all
30 capital investments, including rate of return, any applicable
31 taxes, and all expenses, including operation and maintenance
1
8:14 AM 04/25/07 s1202.21cu.00a
Florida Senate - 2007 SENATOR AMENDMENT
Bill No. SB 1202
Barcode 842132
1 expenses, related to or resulting from the siting, licensing,
2 design, construction, or operation of the nuclear or
3 integrated gasification combined cycle power plant.
4 (c)(b) "Electric utility" or "utility" has the same
5 meaning as that provided in s. 366.8255(1)(a).
6 (d) "Integrated gasification combined cycle power
7 plant" or "plant" is an electrical power plant as defined in
8 s. 403.503(13) that uses synthesis gas produced by integrated
9 gasification technology.
10 (e)(c) "Nuclear power plant" or "plant" is an
11 electrical power plant as defined in s. 403.503(13) which s.
12 403.503(12) that uses nuclear materials for fuel.
13 (f) "Power plant" or "plant" means a nuclear power
14 plant or an advanced technology coal power plant.
15 (g)(d) "Preconstruction" is that period of time after
16 a site has been selected through and including the date the
17 utility completes site clearing work. Preconstruction costs
18 shall be afforded deferred accounting treatment and shall
19 accrue a carrying charge equal to the utility's allowance for
20 funds during construction (AFUDC) rate until recovered in
21 rates.