Florida Senate - 2007                        SENATOR AMENDMENT
    Bill No. SB 1202
                        Barcode 842132
                            CHAMBER ACTION
              Senate                               House
                                   .                    
                                   .                    
 1                                 .                    
                                   .                    
 2                                 .                    
                                   .                    
 3         Floor: WD/2R            .                    
       04/26/2007 03:38 PM         .                    
 4  ______________________________________________________________
 5  
 6  
 7  
 8  
 9  
10  ______________________________________________________________
11  Senator Bennett moved the following amendment:
12  
13         Senate Amendment 
14         On page 1, line 19, through page 2, line 19, delete
15  those lines
16  
17  and insert:  
18         Section 1.  Section 366.93, Florida Statutes, is
19  amended to read:
20         366.93  Cost recovery for the siting, design,
21  licensing, and construction of nuclear and advanced technology
22  coal power plants.--
23         (1)  As used in this section, the term:
24         (a)  "Advanced technology coal power plant" means an
25  electrical power plant as defined in s. 403.503 which uses
26  coal as a fuel and either is an integrated gasification
27  combined cycle power plant or includes a demonstration project
28  for carbon capture and sequestration.
29         (b)(a)  "Cost" includes, but is not limited to, all
30  capital investments, including rate of return, any applicable
31  taxes, and all expenses, including operation and maintenance
                                  1
    8:14 AM   04/25/07                              s1202.21cu.00a

Florida Senate - 2007 SENATOR AMENDMENT Bill No. SB 1202 Barcode 842132 1 expenses, related to or resulting from the siting, licensing, 2 design, construction, or operation of the nuclear or 3 integrated gasification combined cycle power plant. 4 (c)(b) "Electric utility" or "utility" has the same 5 meaning as that provided in s. 366.8255(1)(a). 6 (d) "Integrated gasification combined cycle power 7 plant" or "plant" is an electrical power plant as defined in 8 s. 403.503(13) that uses synthesis gas produced by integrated 9 gasification technology. 10 (e)(c) "Nuclear power plant" or "plant" is an 11 electrical power plant as defined in s. 403.503(13) which s. 12 403.503(12) that uses nuclear materials for fuel. 13 (f) "Power plant" or "plant" means a nuclear power 14 plant or an advanced technology coal power plant. 15 (g)(d) "Preconstruction" is that period of time after 16 a site has been selected through and including the date the 17 utility completes site clearing work. Preconstruction costs 18 shall be afforded deferred accounting treatment and shall 19 accrue a carrying charge equal to the utility's allowance for 20 funds during construction (AFUDC) rate until recovered in 21 rates. 22 23 24 25 26 27 28 29 30 31 2 8:14 AM 04/25/07 s1202.21cu.00a