Florida Senate - 2008 SENATOR AMENDMENT
Bill No. CS for CS for CS for SB 1544
396144
Senate
Floor: 12/AD/2R
4/17/2008 10:28 AM
.
.
.
.
.
House
1
Senator Saunders moved the following amendment:
2
3
Senate Amendment (with directory and title amendments)
4
Delete line(s) 1787-1822
5
and insert:
6
practicable alternative available for placement of the electric
7
utility transmission lines on the department's rights-of-way, the
8
department's rules shall provide for placement of and access to
9
such transmission lines adjacent to and within the right-of-way
10
of any department-controlled public roads, including
11
longitudinally within limited access facilities to the greatest
12
extent allowed by federal law, if compliance with the standards
13
established by such rules is achieved. Such rules may include,
14
but need not be limited to, that the use of the right-of-way is
15
reasonable based upon a consideration of economic and
16
environmental factors, including, without limitation, other
17
practicable alternative alignments, utility corridors and
18
easements, minimum clear zones and other safety standards, and
19
further provide that placement of the electric utility
20
transmission lines within the department's right-of-way does not
21
interfere with operational requirements of the transportation
22
facility or planned or potential future expansion of such
23
transportation facility. If the department approves longitudinal
24
placement of electric utility transmission lines in limited
25
access facilities, compensation for the use of the right-of-way
26
is required. Such consideration or compensation paid by the
27
electric utility in connection with the department's issuance of
28
a permit does not create any property right in the department's
29
property regardless of the amount of consideration paid or the
30
improvements constructed on the property by the utility. Upon
31
notice by the department that the property is needed for
32
expansion or improvement of the transportation facility, the
33
electric utility transmission line will relocate from the
34
facility at the electric utility's sole expense. The electric
35
utility shall pay to the department reasonable damages resulting
36
from the utility's failure or refusal to timely relocate its
37
transmission lines. The rules to be adopted by the department
38
may also address the compensation methodology and relocation. As
39
used in this subsection, the term "base load generating
4/16/2008 4:52:00 PM EP.37.07764
CODING: Words stricken are deletions; words underlined are additions.