5 Section 3. The Public Service Commission shall perform a
6 comprehensive review of the continuing prudency, cost
7 effectiveness, and need for any proposed nuclear power plant for
8 which cost recovery under section 366.93, Florida Statutes, has
9 been authorized if the currently anticipated inservice date for
10 the plant has been extended more than 6 years beyond the
11 original proposed inservice date and if the most recent estimate
12 of the plant’s total cost has increased by more than 50 percent
13 of the original cost estimate for the plant. In making this
14 determination, the commission must consider all relevant
15 factors, including, but not limited to, the utility’s need for
16 the plant, technology and fuel choices, applicable federal and
17 state licensing and permitting factors, and short- and long-term
18 costs to ratepayers. Based on its review, the commission shall
19 determine whether to authorize for cost recovery under section
20 366.93, Florida Statutes, any new or future costs for which cost
21 recovery has not already been authorized. Such review shall
22 commence on or before June 1, 2013, and shall be complete by
23 February 1, 2014.
24
25 ================= T I T L E A M E N D M E N T ================
26 And the title is amended as follows:
27 Delete line 15
28 and insert:
29 specifying criteria for such report; requiring the
30 Public Service Commission to review the circumstances
31 surrounding a proposed nuclear power plant if the
32 anticipated cost and completion date exceed the
33 original cost and completion date by a certain amount
34 or period; specifying factors to be considered and
35 dates by which the review must commence and be