Florida Senate - 2015 COMMITTEE AMENDMENT
Bill No. SB 824
Ì759076HÎ759076
LEGISLATIVE ACTION
Senate . House
Comm: RCS .
03/17/2015 .
.
.
.
—————————————————————————————————————————————————————————————————
—————————————————————————————————————————————————————————————————
The Committee on Community Affairs (Bradley) recommended the
following:
1 Senate Amendment (with title amendment)
2
3 Delete lines 270 - 300
4 and insert:
5 (c) If the responsible public entity solicits proposals
6 under this section, the solicitation must include a design
7 criteria package prepared by an architect or engineer licensed
8 in this state which is sufficient to allow private entities to
9 prepare a bid or a response. The design criteria package must
10 specify performance-based criteria for the project, including
11 the legal description of the site, with survey information;
12 interior space requirements; material quality standards;
13 schematic layouts and conceptual design criteria for the
14 project, with budget estimates; design and construction
15 schedules; and site and utility requirements A responsible
16 public entity that is a school board may enter into a
17 comprehensive agreement only with the approval of the local
18 governing body.
19 (d) Before approving a comprehensive agreement approval,
20 the responsible public entity must determine that the proposed
21 project:
22 1. Is in the public’s best interest.
23 2. Is for a facility that is owned by the responsible
24 public entity or for a facility for which ownership will be
25 conveyed to the responsible public entity.
26 3. Has adequate safeguards in place to ensure that
27 additional costs or service disruptions are not imposed on the
28 public in the event of material default or cancellation of the
29 comprehensive agreement by the responsible public entity.
30 4. Has adequate safeguards in place to ensure that the
31 responsible public entity or private entity has the opportunity
32 to add capacity to the proposed project or other facilities
33 serving similar predominantly public purposes.
34 5. Will be owned by the responsible public entity upon
35 completion, expiration, or termination of the comprehensive
36 agreement and upon payment of the amounts financed.
37 (e) Before signing a comprehensive agreement, the
38 responsible public entity must consider a reasonable finance
39 plan that is consistent with subsection (9) (11); the qualifying
40 project cost; revenues by source; available financing; major
41 assumptions; internal rate of return on private investments, if
42 governmental funds are assumed in order to deliver a cost
43 feasible project; and a total cash-flow analysis beginning with
44 the implementation of the project and extending for the term of
45 the comprehensive agreement.
46 (f) In considering an unsolicited proposal, the
47
48 ================= T I T L E A M E N D M E N T ================
49 And the title is amended as follows:
50 Delete line 15
51 and insert:
52 comprehensive agreement; requiring a responsible
53 public entity to include a design criteria package in
54 a solicitation; specifying requirements for the design
55 criteria package; revising the conditions