Florida Senate - 2025 COMMITTEE AMENDMENT
Bill No. SB 592
Ì489992aÎ489992
LEGISLATIVE ACTION
Senate . House
Comm: RCS .
03/03/2025 .
.
.
.
—————————————————————————————————————————————————————————————————
—————————————————————————————————————————————————————————————————
The Committee on Banking and Insurance (Leek) recommended the
following:
1 Senate Amendment (with title amendment)
2
3 Delete lines 117 - 144
4 and insert:
5 1. Opening protection improvements, including all of the
6 following:
7 a. Exterior doors.,
8 b. Garage doors.,
9 c. Windows., and
10 d. Skylights.
11 2. Roof-related improvements, including all of the
12 following:
13 a.2. Reinforcing roof-to-wall connections.
14 b.3. Improving the strength of roof-deck attachments.
15 c.4. Installing secondary water resistance for roof.
16 d. Replacing the roof covering.
17 (f) Improvements must be verified during the final
18 hurricane mitigation inspection to qualify for grant funds
19 Grants may be used for a previously inspected existing structure
20 on the property.
21 (g)1. If improvements to protect the property which
22 complied with the current applicable building code at the time
23 have been previously installed, the association must use a
24 mitigation grant to install improvements that do both of the
25 following:
26 1.a. Comply with or exceed the applicable building code in
27 effect at the time the association applied for the grant.
28 2.b. Provide more hurricane protection than the
29 improvements that the association previously installed.
30 (h)2. The association may not use a mitigation grant to:
31 1.a. Install the same type of improvements that were
32 previously installed; or
33 2.b. Pay a deductible for a pending insurance claim for
34 damage that is part of the property for which grant funds are
35 being received.
36 (i)(h) The department shall develop a process that ensures
37
38 ================= T I T L E A M E N D M E N T ================
39 And the title is amended as follows:
40 Delete line 10
41 and insert:
42 may be used; requiring that improvements be verified
43 during the final hurricane mitigation inspection to
44 qualify for grant funds; providing an effective date.