Community Budget Issue Requests - Tracking Id #1277 |
Miami-Dade County's Watershed Planning Project: North-Central Basins Stormwater Planning Component, Stormwater Modeling Phase II (C6-Basin) |
|
Requester: |
Miami-Dade County |
Organization: |
Department of Environmental Resources Management |
|
Project Title: |
Miami-Dade County's Watershed Planning Project: North-Central Basins Stormwater Planning Component, Stormwater Modeling Phase II (C6-Basin) |
Date Submitted |
1/14/2004 5:24:41 PM |
|
Sponsors: |
Margolis |
|
Statewide Interest: |
The model, once implemented will:
(a) Predict appropriate flood control measures thereby reducing insurance claims associated with flooding damage, and protect the public from flood hazards,
(b) Help predict groundwater supply for drinking water once freshwater losses to tide are estimated,
(c) Predict appropriate quality restoration targets for parameters of interest, and therefore reduce the severity of the values for water quality indicators. Those achieved restoration targets will then help maintain pristine conditions in water bodies of Miami-Dade County.
|
|
Recipient: |
Miami-Dade County DERM |
|
Contact: |
Antonio Cotarelo, P.E. |
|
|
33 SW 2nd Avenue, PH2 |
|
Contact Phone: |
(305) 372-6950 |
|
|
Miami 33130 |
|
Contact email: |
cotara@miamidade.gov |
|
Counties: |
Dade |
|
Gov't Entity: |
Yes |
Private Organization (Profit/Not for Profit): |
|
|
Project Description: |
This project is an essential element in the development of the integrated area wide land use and water management plan for the north-central Miami-Dade County watershed required in the County's adopted Comprehensive Development Master Plan (CDMP). The development of this land use and water management plan is a critical part in ongoing Federal and State ecosystem restoration efforts in that it will define the future or proposed land uses in north-central Miami-Dade County.
The project goal, once Phase II is implemented, encompasses several purpose, including: Hydrologic and Hydraulic Modeling for Existing and Future Landuse Conditions without Control Measures, Pollutant Loading Estimates for Existing and Future Landuse Conditions, Identification and Ranking of Problems Areas for the C-6 Basin, Control Measures Evaluation for the C-6 Basin, Hydrologic and Hydraulic Modeling for Future Conditions with Control Measures, and Pollutant Loading Estimates for Future Conditions with Control Measure.
Once those water quality and hydrologic and hydraulic models are implemented. A procedure developed which has been applied to rank and at the same time prioritize problem areas in terms of both water quality issues and flood control will be carried out. This prioritizing and ranking will lead to implementation of control measures such as Best Management Practices (BMPs) proposals. BMPs are structural controls, which consist mainly in retrofitting of existing stormwater structures in place, or construction of portion of storm sewer systems in those affected areas for the purpose of attaining better water quality values and at the same time, improving flood indicators values.
|
|
Is this a water project as described in Chapter 2002-291, Laws of Florida? |
Yes |
Has the project been submitted to the Department of Environmental Protection? |
Yes |
DEP Identfying Number: |
SW20022005 |
|
Measurable Outcome Anticipated: |
Completion of this project should allow staff to estimate or predict the pollutant loading potential of sub-areas of the C-6 basin to generate loads into surface water bodies, to include the C-6 canal (Miami Canal), in terms of land uses and the appropriate pollutant generation capacity of those landuses (EMCs), which discharge to the Miami River and ultimately to Biscayne Bay. The pollutant loads are based on fourteen pollutants of interest such as BOD, COD, TSS, TDS, TKN, NOx-N, TN, NH3-N, Total phosphorus, Orthophosphate, Cd, Cu, Pb, and Zn. |
|
Amount requested from the State for this project this year: |
$750,000 |
|
Total cost of the project: |
$1,750,000 |
|
Request has been made to fund: |
Operations |
|
What type of match exists for this project? |
Local |
|
Cash Amount |
$650,000 |
|
In-kind Amount |
$350,000 |
|
Was this project previously funded by the state? |
|
No |
|
Is future-year funding likely to be requested? |
|
No |
|
Was this project included in an Agency's Budget Request? |
|
Unknown |
|
Was this project included in the Governor's Recommended Budget? |
Unknown |
|
Is there a documented need for this project? |
Yes |
|
Documentation: |
Flood Management Task Force Hurricane Irene Report; Miami-Dade County Stormwater Master Plan Resolu |
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
|
Yes |
|
Hearing Body: |
Miami Dade Delegation |
|
Hearing Meeting Date: |
12/03/2003 |