Community Budget Issue Requests - Tracking Id #1286 |
Conveyance Improvements to the C-3 Canal East of Control Structure G-93 |
|
Requester: |
Davil L. Brown |
Organization: |
City of Coral Gables |
|
Project Title: |
Conveyance Improvements to the C-3 Canal East of Control Structure G-93 |
Date Submitted |
1/11/2006 10:49:12 AM |
|
Sponsors: |
Margolis |
|
Statewide Interest: |
This project is local in scope, is intended to meet a documented need, will produce a measurable result and has tangible community support. |
|
Recipient: |
City of Coral Gables |
|
Contact: |
R. Alberto Delgado |
|
|
405 Biltmore Way |
|
Contact Phone: |
(305) 460-5001 |
|
|
Coral Gables 33134 |
|
Contact email: |
adelgado@coralgables.com |
|
Counties: |
Dade |
|
Gov't Entity: |
Yes |
Private Organization (Profit/Not for Profit): |
|
|
Project Description: |
Construction of channel improvements by stabilizing canal banks and improving the conveyance of stromwater flow by the removal of approximately 70,000 cubic yards of bottom sediments in the C-3 canal downstream of Control Structure G-93. Engineering services (plans preparation and project management); Environmental services (sediments characterization); Surveying services (soundings, aerieal photography) will also be required to complete this project. |
|
Is this a project related to a federal or state declared disaster? |
Yes |
If yes, which declared disaster? |
No Name Storm |
If yes, which year? |
2000 |
|
Measurable Outcome Anticipated: |
1) Improved protection against flooding in the lower upland reaches of the C-3 Canal basin; 2) Prevention of the transport of potentially contaminated bottom sediments to Biscayne Bay during and after the operation of Control Structure G-93; and 3) Prevention of bank erosion at selected locations along the C-3 Canal. |
|
Amount requested from the State for this project this year: |
$983,500 |
|
Total cost of the project: |
$6,367,000 |
|
Request has been made to fund: |
Construction |
|
What type of match exists for this project? |
Local, Federal |
|
Cash Amount |
$700,000 |
|
In-kind Amount |
$283,500 |
|
Was this project previously funded by the state? |
|
Yes |
|
Fiscal Year: |
2005-2006 |
Amount: |
$2,700,000 |
|
Is future-year funding likely to be requested? |
|
Yes |
|
Amount: |
$400,000 |
To Fund: |
Construction, To complete project |
|
Was this project included in an Agency's Budget Request? |
|
No |
|
Was this project included in the Governor's Recommended Budget? |
No |
|
Is there a documented need for this project? |
Yes |
|
Documentation: |
Flood Mitigation Projects, Miami-Dade County, Florida. SFWMD Emergency Operations Center Rec. Oct 04 |
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
|
Yes |
|
Hearing Body: |
South Florida Water Management District |
|
Hearing Meeting Date: |
11/13/2005 |
|
Is this a water project as described in Section 403.885, Laws of Florida? |
|
Yes |
Has the project been submitted to the Department of Environmental Protection? |
Yes |
DEP identifying number: |
SW20032055 |
Is this project eligible under section 403.885(5) F.S.? |
Yes |
|
Is your project addressed in a state, regional or local plan (such as a SWIM plan, Comprehensive Plan, local master plan, etc.)? |
Yes |
Name the plan and cite the pages on which the project is described: |
"Local Mitigation Strategy for Miami-Dade County and its Municipalities, Departments and Private Sector Partners" June 30, 2004 page 46 |
|
If you are requesting funding for a stormwater or surface water restoration project: |
|
Which Water Management District has the jurisdiction of your project? |
|
South Florida Water Mangement District |
Have you provided at least 50% match? |
Yes |
|
Match Amount: |
983500 |
|
Match Source: |
General Fund & Stormwater Utility |
|
Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? |
Yes |
|
Name of water body: |
Biscayne Bay |
|
Describe how it will reduce loadings, identify anticipated load reductions for total suspended solids, total nitrogen, total phosphorus, and other contaminants, and specify the practices that will be used to reduce loadings: |
|
|
If you are requesting funding for a wastewater project: |
|
Does your project qualify for funding from DEP's 'Small Community Wastewater Treatment Grant Program' under section 403.1838 F.S.? |
No |
|
Other wastewater projects: |
|
Have you received previous legislative funding for this project? |
No |
|
Is the project under construction? |
No |
|
Have you provided at least a 25% local match? |
No |