CBIRS Request 180
 
Community Budget Issue Requests - Tracking Id #180
South Miami-Dade Watershed Sub-Basin C103N-S-5A Retrofitting
 
Requester: Antonio Cotarelo, P.E. Organization: Miami-Dade Department of Environmental Resources Management
 
Project Title: South Miami-Dade Watershed Sub-Basin C103N-S-5A Retrofitting Date Submitted 1/5/2006 1:41:26 PM
 
Sponsors: Bullard
 
Statewide Interest:
The project will help reduce pollutant loads discharged into the C-103 Canal, which ultimately discharges to Biscayne Bay, a protected body of water under State of Florida guidelines. Therefore, this project will contribute to help Biscayne Bay attain state ambient water quality standards while positively contributing to the aesthetics and increased standard of living in the benefited community.
 
Recipient: Miami-Dade Department of Environmental Resources Management   Contact: Antonio Cotarelo, P.E.  
  33 SW 2nd Avenue, PH 2   Contact Phone: (305) 372-6950  
  Miami 33130   Contact email: cotara@miamidade.gov
 
Counties: Dade
 
Gov't Entity: Yes Private Organization (Profit/Not for Profit):  
 
Project Description:
This request is based on the implementation of a control measure recommended by the Stormwater Master Plan in the C-103 hydrologic basin. The C-103 basin is a component of the South Miami Dade Watershed. the goal of this control measure is to retrofit sice (6) existing outfalls into the C-103 canal. Currently, these outfalls discharge stormwater runoff without pre-treatment. This control measure proposes to retrofit the area with approximately 7,500 feet of exfiltration drains to treat the stormwater before discharing into the waterbody. This request also proposes to build six (6) new pollution control structures prior to discharging into the canal.
 
Is this a project related to a federal or state declared disaster? No
 
Measurable Outcome Anticipated:
The project goal, once implemented, is to attenuate the heaviest loads of pollutants generated by the initial wash off of the watershed to surface waters (C-103 canal), which is caused by the effect of the first inch of runoff over its area. The runoff generated over the basin will be routed through a treatment train consisting of exfiltration trenches and pollution control structures installed as part of this project to reduce the amount of urban runoff going into the C-103 canal.
 
Amount requested from the State for this project this year: $726,500
 
Total cost of the project: $1,453,000
 
Request has been made to fund: Construction
 
What type of match exists for this project? Local
  Cash Amount $726,500  
 
Was this project previously funded by the state?   No
 
Is future-year funding likely to be requested?   No
 
Was this project included in an Agency's Budget Request?   No
 
Was this project included in the Governor's Recommended Budget? No
 
Is there a documented need for this project? Yes
  Documentation: South Miami-Dade Watershed Planning Stormwater Modeling Component, Phase II: C-103 Canal
 
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)?   Yes
  Hearing Body: Miami-Dade Board of County Commissioners
  Hearing Meeting Date: 11/15/2005
 
Is this a water project as described in Section 403.885, Laws of Florida?   Yes
Has the project been submitted to the Department of Environmental Protection? No
Is this project eligible under section 403.885(5) F.S.? Yes
 
Is your project addressed in a state, regional or local plan (such as a SWIM plan, Comprehensive Plan, local master plan, etc.)? Yes
Name the plan and cite the pages on which the project is described:
South Miami-Dade Watershed Planning Stormwater Modeling Component, Phase II: C-103 Canal, North Canal and Florida City Basin
 
If you are requesting funding for a stormwater or surface water restoration project:
 
Which Water Management District has the jurisdiction of your project?
  South Florida Water Management Distirct
Have you provided at least 50% match? Yes
  Match Amount: 726500
  Match Source: Miami-Dade County Stormwater Utility
 
Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? Yes
  Name of water body: Biscayne Bay
 
Describe how it will reduce loadings, identify anticipated load reductions for total suspended solids, total nitrogen, total phosphorus, and other contaminants, and specify the practices that will be used to reduce loadings:
 
 
If you are requesting funding for a wastewater project:
 
Does your project qualify for funding from DEP's 'Small Community Wastewater Treatment Grant Program' under section 403.1838 F.S.? No
 
Other wastewater projects:
 
Have you received previous legislative funding for this project? No
 
Is the project under construction? Yes
 
Have you provided at least a 25% local match? Yes
  Amount: 726500 Source: Miami-Dade County Stormwater Utility