| |
| Community Budget Issue Requests - Tracking Id #1845 |
| West Miami Stormwater Drainage Improvements |
| |
| Requester: |
Yolanda Aguilar |
Organization: |
City of West Miami |
| |
| Project Title: |
West Miami Stormwater Drainage Improvements |
Date Submitted |
1/12/2006 12:32:08 PM |
| |
| Sponsors: |
Diaz de la Portilla |
| |
| Statewide Interest: |
| Protection of health, saftey, property, and public welfare from adverse impact of stormwater flooding events |
| |
| Recipient: |
City of West Miami |
|
Contact: |
Yolanda Aguilar |
|
| |
901 SW 62nd Avenue |
|
Contact Phone: |
(305) 266-1122 |
|
| |
West Miami 33144 |
|
Contact email: |
cwmyaguilar@bellsouth.net |
| |
| Counties: |
Dade |
| |
| Gov't Entity: |
Yes |
Private Organization (Profit/Not for Profit): |
|
| |
| Project Description: |
| The City of West Miami in cooperation with the Florida Legislature and the South Florida Water Management District has secured funding for projects to eliminate re-curring flooding. In concert with the construction and operation of the Miami-Dade County western retention basins, these projects will provide the citizens of this region with the approriate level of service for flood protection. This years funding will support construction on the City's Phase 3A stormwater system. This phase will serve the balance of the western portion of the City, and will be tied to the Phase 1 and 2 systems currently under construction.. |
| |
| Is this a project related to a federal or state declared disaster? |
No |
| |
| Measurable Outcome Anticipated: |
| The elimination of flooding inside residences and businesses throughout the west side of the City, and eliminate street flooding. |
| |
| Amount requested from the State for this project this year: |
$1,000,000 |
| |
| Total cost of the project: |
$2,000,000 |
| |
| Request has been made to fund: |
Construction |
| |
| What type of match exists for this project? |
Local |
| |
Cash Amount |
$1,000,000 |
|
| |
| Was this project previously funded by the state? |
|
Yes |
|
Fiscal Year: |
2005-2006 |
Amount: |
$800,000 |
| |
| Is future-year funding likely to be requested? |
|
No |
| |
| Was this project included in an Agency's Budget Request? |
|
No |
| |
| Was this project included in the Governor's Recommended Budget? |
No |
| |
| Is there a documented need for this project? |
Yes |
| |
Documentation: |
City of West Miami Storm Water Model |
| |
| Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
|
Yes |
| |
Hearing Body: |
Miami-Dade Legislative Delegation |
| |
Hearing Meeting Date: |
11/30/2005 |
| |
| Is this a water project as described in Section 403.885, Laws of Florida? |
|
Yes |
| Has the project been submitted to the Department of Environmental Protection? |
Yes |
| DEP identifying number: |
SW2002057 |
| Is this project eligible under section 403.885(5) F.S.? |
Yes |
| |
| Is your project addressed in a state, regional or local plan (such as a SWIM plan, Comprehensive Plan, local master plan, etc.)? |
Yes |
| Name the plan and cite the pages on which the project is described: |
| Adopted West Miami Drainage Master Plan |
| |
| If you are requesting funding for a stormwater or surface water restoration project: |
| |
| Which Water Management District has the jurisdiction of your project? |
| |
South Florida Water Management District |
| Have you provided at least 50% match? |
Yes |
| |
Match Amount: |
1000000 |
| |
Match Source: |
Local |
| |
| Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? |
Yes |
| |
Name of water body: |
Biscayne Bay |
| |
| Describe how it will reduce loadings, identify anticipated load reductions for total suspended solids, total nitrogen, total phosphorus, and other contaminants, and specify the practices that will be used to reduce loadings: |
| |
| |
| If you are requesting funding for a wastewater project: |
| |
| Does your project qualify for funding from DEP's 'Small Community Wastewater Treatment Grant Program' under section 403.1838 F.S.? |
No |
| |
| Other wastewater projects: |
| |
| Have you received previous legislative funding for this project? |
No |
| |
| Is the project under construction? |
No |
| |
| Have you provided at least a 25% local match? |
No |