Community Budget Issue Requests - Tracking Id #2564 |
Plant City Eastside Canal Stormwater Management Master Plan |
|
Requester: |
Mayor John L. Dicks |
Organization: |
City of Plant City |
|
Project Title: |
Plant City Eastside Canal Stormwater Management Master Plan |
Date Submitted |
1/13/2006 9:09:18 AM |
|
Sponsors: |
Crist |
|
Statewide Interest: |
The implementation of this project will provide regional stormwater benefits. The Plant City Eastside Canal is a tributary to the Itchepackesassa Creek which has a confluence with the Blackwater Creek and connects to the Hillsborough River which outfalls to Tampa Bay and the Gulf of Mexico. |
|
Recipient: |
City of Plant City |
|
Contact: |
David Sollenberger, City Manag |
|
|
302 W. Reynolds Street |
|
Contact Phone: |
(813) 659-4239 |
|
|
Plant City 33653 |
|
Contact email: |
dsollenberger@plantcitygov.com |
|
Counties: |
Hillsborough |
|
Gov't Entity: |
Yes |
Private Organization (Profit/Not for Profit): |
|
|
Project Description: |
The City of Plant City experiences chronic flooding along the Eastside Canal. The Eastside Canal watershed area comprises approximately 6,302 acres or roughly 9.8 square miles, of eastern Hillsborough County and the eastern portion of Plant City. In addition to drainage problems, water quality is also an issue of the Eastside Canal discharge. The City retained Professional Engineering Consultants, Inc., to complete an assessment of the water quality and quantity resulting in an "Engineering Report and Drainage Calculations for Eastside Canal Stormwater Management Master Plan for Plant City, Florida" prepared in October 2001. The City implemented some of the capital improvement projects recommended in the report with local funds. The remaining stormwater management capital improvement projects are unfunded. Completion of all the recommended improvements will provide flood relief to various residential neighborhoods and improve the water quality of the discharge in the Eastside Canal. |
|
Is this a project related to a federal or state declared disaster? |
No |
|
Measurable Outcome Anticipated: |
The project will improve the stormwater drainage system and provide flood relief. |
|
Amount requested from the State for this project this year: |
$3,000,000 |
|
Total cost of the project: |
$7,245,474 |
|
Request has been made to fund: |
Construction |
|
What type of match exists for this project? |
Local |
|
Cash Amount |
$3,000,000 |
|
|
Was this project previously funded by the state? |
|
No |
|
Is future-year funding likely to be requested? |
|
No |
|
Was this project included in an Agency's Budget Request? |
|
No |
|
Was this project included in the Governor's Recommended Budget? |
No |
|
Is there a documented need for this project? |
Yes |
|
Documentation: |
"Engineering Report & Drainage Calculations for Eastside Canal Stormwater Management Master Plan for |
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
|
Yes |
|
Hearing Body: |
Hillsborough County Legislative Delegation |
|
Hearing Meeting Date: |
12/16/2005 |
|
Is this a water project as described in Section 403.885, Laws of Florida? |
|
Yes |
Has the project been submitted to the Department of Environmental Protection? |
No |
Is this project eligible under section 403.885(5) F.S.? |
Yes |
|
Is your project addressed in a state, regional or local plan (such as a SWIM plan, Comprehensive Plan, local master plan, etc.)? |
Yes |
Name the plan and cite the pages on which the project is described: |
: "Engineering Report and Drainage Calculations for Eastside Canal Stormwater Management Master Plan for Plant City, Florida," by Professional Engineering Consultants, Inc., in October 2001. |
|
If you are requesting funding for a stormwater or surface water restoration project: |
|
Which Water Management District has the jurisdiction of your project? |
|
Southwest Florida Water Management District |
Have you provided at least 50% match? |
Yes |
|
Match Amount: |
3000000 |
|
Match Source: |
Local |
|
Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? |
Yes |
|
Name of water body: |
Tampa Bay |
|
Describe how it will reduce loadings, identify anticipated load reductions for total suspended solids, total nitrogen, total phosphorus, and other contaminants, and specify the practices that will be used to reduce loadings: |
|
|
If you are requesting funding for a wastewater project: |
|
Does your project qualify for funding from DEP's 'Small Community Wastewater Treatment Grant Program' under section 403.1838 F.S.? |
No |
|
Other wastewater projects: |
|
Have you received previous legislative funding for this project? |
No |
|
Is the project under construction? |
Yes |
|
Have you provided at least a 25% local match? |
Yes |
|
Amount: |
3000000 |
Source: |
Local |