Community Budget Issue Requests - Tracking Id #1046 |
LAKE ELIZABETH ROADWAY AND DRAINAGE IMPROVEMENT |
|
Requester: |
Alex Rey, Town Manager |
Organization: |
Town of Miami Lakes |
|
Project Title: |
LAKE ELIZABETH ROADWAY AND DRAINAGE IMPROVEMENT |
Date Submitted |
1/2/2008 11:24:01 AM |
|
Sponsors: |
Garcia |
|
Statewide Interest: |
The project will reduce pollutant loading in surface water and ground water. |
|
Recipient: |
TOWN OF MIAMI LAKES |
|
Contact: |
OSDEL LARREA |
|
|
15700 NW 67 AVE SUITE 302 |
|
Contact Phone: |
-(305) 364-6100 |
|
|
MIAMI LAKES, FL 33014 |
|
Contact email: |
larreao@townofmiamilakes.com |
|
Counties: |
Miami-Dade |
|
Gov't Entity: |
Yes |
Private Organization (Profit/Not for Profit): |
|
|
Project Description: |
Lake Elizabeth-Installation of storm water drainage improvements and restoration of the associated roadways. |
|
Is this a project related to a federal or state declared disaster? |
No |
|
Measurable Outcome Anticipated: |
Reduce flooding in the Lake Elizabeth neighborhood and enhance water quality. |
|
Amount requested from the State for this project this year: |
$300,000 |
|
Total cost of the project: |
$632,000 |
|
Request has been made to fund: |
Construction |
|
What type of match exists for this project? |
Local |
|
Cash Amount |
$332,000 |
|
|
Was this project previously funded by the state? |
|
No |
|
Is future-year funding likely to be requested? |
|
No |
|
Was this project included in an Agency's Budget Request? |
|
No |
|
Was this project included in the Governor's Recommended Budget? |
No |
|
Is there a documented need for this project? |
Yes |
|
Documentation: |
Town Storm Water Master Plan |
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
|
Yes |
|
Hearing Body: |
Town of Miami Lakes Town Council |
|
Is this a water project as described in Section 403.885, Laws of Florida? |
|
Yes |
Is the project eligible under section 403.885(2),F.S. to protect public health or the environment; and implement plans developed pursuant to the Surface Water Improvement and Management Act created in part IV of Chapter 373,F.S., other water restoration plans required by law, management plans prepared pursuant to 2.403.067,F.S., or other plans adopted by local government for water quality improvement and water restoration? |
Yes |
Is your project addressed in a state, regional or local plan (such as a SWIM Plan, Comprehensive Plan, Local Master Plan, etc.)? |
Yes |
Name the plan and cite the pages on which the project is described: |
Local Storm Water Master Plan (Pages 34-36) |
|
Are requesting funding for a stormwater, surface water restoration, or other water management project? |
Yes |
|
In which Water Management District is your project located? |
|
South Florida Water Management District |
Have you provided at least 50% match (that is, one-half the total project cost identified in this request? |
Yes |
|
Match Amount: |
332000 |
|
Match Source: |
Town Storm Water Utility Fund |
|
Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? |
Yes |
|
Name of water body: |
Biscayne Aquifer |
|
Describe, specifically, how it will reduce loadings, identify anticipated load reductions for total suspended solids, total nitrogen, total phosphorus, and other contaminants, and specify the practices that will be used to reduce loadings: |
Loading will be reduced by numerous water quality measures including ex-filtration trenches, baffles, and sediment boxes. Expected pollutant load reductions to the Biscayne Aquifer for the Lake Elizabeth Project are as follows:
Pollutant Existing Load (kg/yr) Reduction (kg/yr) Proposed Load (kg/yr)
Total Suspended Solids 2615 2368 247
Total Phosphorus 27.69 25.65 2.03
Total Nitrogen 218.13 195.23 22.90
|
Is the project under construction? |
No |
|
Are you requesting funding for a wastewater project? |
No |
|
Are you requesting funding for a drinking water project? |
No |