|
Community Budget Issue Requests - Tracking Id #1151 |
SW 54th and SW 195th Avenue Drainage |
|
Requester: |
Town of Southwest Ranches |
Organization: |
Municipality |
|
Project Title: |
SW 54th and SW 195th Avenue Drainage |
Date Submitted |
1/3/2008 11:42:10 AM |
|
Sponsors: |
Rich |
|
Statewide Interest: |
Provides water quality benefits to the secondary canal flowing to C-11 and provides flood protection for local residents. |
|
Recipient: |
Town of Southwest Ranches |
|
Contact: |
Chris Russo, Town Adminstrator |
|
|
6589 SW 160 Avenue |
|
Contact Phone: |
(954) 434-0008 |
|
|
Southwest Ranches 33331 |
|
Contact email: |
crusso@swranches.org |
|
Counties: |
Broward |
|
Gov't Entity: |
Yes |
Private Organization (Profit/Not for Profit): |
|
|
Project Description: |
Remote urban stormwater into an existing catch basin via overland flow improving water quality before it reaches the C-11 Canal that leads to the Everglades. |
|
Is this a project related to a federal or state declared disaster? |
No |
|
Measurable Outcome Anticipated: |
Positive effect of furthering the major goal of reducing TP in the CERP Basin while reducing flooding. |
|
Amount requested from the State for this project this year: |
$43,975 |
|
Total cost of the project: |
$87,950 |
|
Request has been made to fund: |
Construction |
|
What type of match exists for this project? |
Local |
|
Cash Amount |
$43,975 |
|
|
Was this project previously funded by the state? |
|
No |
|
Is future-year funding likely to be requested? |
|
No |
|
Was this project included in an Agency's Budget Request? |
|
No |
|
Was this project included in the Governor's Recommended Budget? |
Unknown |
|
Is there a documented need for this project? |
Yes |
|
Documentation: |
Department's Needs Assessment |
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
|
Yes |
|
Hearing Body: |
Town of Southwest Ranches |
|
Is this a water project as described in Section 403.885, Laws of Florida? |
|
Yes |
Is the project eligible under section 403.885(2),F.S. to protect public health or the environment; and implement plans developed pursuant to the Surface Water Improvement and Management Act created in part IV of Chapter 373,F.S., other water restoration plans required by law, management plans prepared pursuant to 2.403.067,F.S., or other plans adopted by local government for water quality improvement and water restoration? |
Yes |
Is your project addressed in a state, regional or local plan (such as a SWIM Plan, Comprehensive Plan, Local Master Plan, etc.)? |
Yes |
Name the plan and cite the pages on which the project is described: |
Town's adopted Tertiary Drainage Plan |
|
Are requesting funding for a stormwater, surface water restoration, or other water management project? |
Yes |
|
In which Water Management District is your project located? |
|
South Florida Water Management District/South Broward Drainage District |
Have you provided at least 50% match (that is, one-half the total project cost identified in this request? |
No |
|
Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? |
Yes |
|
Name of water body: |
SBDD Canal #13 |
|
Describe, specifically, how it will reduce loadings, identify anticipated load reductions for total suspended solids, total nitrogen, total phosphorus, and other contaminants, and specify the practices that will be used to reduce loadings: |
By discharging stormwater into ex-filtration trenches, running stormwater through surface swales before reaching the existing catch basin. |
Is the project under construction? |
No |
|
Are you requesting funding for a wastewater project? |
No |
|
Are you requesting funding for a drinking water project? |
No |