|
Community Budget Issue Requests - Tracking Id #1295 |
Tamarac Stormwater Improvement Project |
|
Requester: |
Jeffrey L. Miller |
Organization: |
City of Tamarac |
|
Project Title: |
Tamarac Stormwater Improvement Project |
Date Submitted |
1/2/2008 9:12:10 PM |
|
Sponsors: |
Ring |
|
Statewide Interest: |
The proposed project is a continuation of the City�s stormwater containment effort. The City has thus far replaced three essential stations along the C-14 canal. The next phase of improvements provides for replacement of the culverts servicing the stations and surrounding area. The project will reduce flooding that impacts approximately 35,000 residents and 1,000 businesses in the seven (7) square mile basin served by the stations and will further protect the water quality by reducing pollutants entering the C-14 canal. |
|
Recipient: |
City of Tamarac |
|
Contact: |
Diane Phillips/Jack Strain |
|
|
7525 NW 88th Avenue |
|
Contact Phone: |
(954) 597-3510 |
|
|
Tamarac 33321 |
|
Contact email: |
dianep@tamarac.org |
|
Counties: |
Broward |
|
Gov't Entity: |
Yes |
Private Organization (Profit/Not for Profit): |
|
|
Project Description: |
Next phase of replacement of stormwater infrastructure servicing approximately 60% of the City. |
|
Is this a project related to a federal or state declared disaster? |
No |
|
Measurable Outcome Anticipated: |
Measurable Outcome Anticipated: Coupled with the new pumps installed by the City, the culvert improvements will alleviate flooding by increasing pumping capacity by approximately 25%. The overall project will further decrease pollutants and solids washed into the canal system during flood events, further mitigating damage to the adjoining ecosystems. |
|
Amount requested from the State for this project this year: |
$500,000 |
|
Total cost of the project: |
$650,000 |
|
Request has been made to fund: |
Construction |
|
What type of match exists for this project? |
Local |
|
Cash Amount |
$100,000 |
|
In-kind Amount |
$50,000 |
|
Was this project previously funded by the state? |
|
Yes |
|
Fiscal Year: |
2006-07 |
Amount: |
$750,000 |
|
Is future-year funding likely to be requested? |
|
No |
|
Was this project included in an Agency's Budget Request? |
|
No |
|
Was this project included in the Governor's Recommended Budget? |
Yes |
|
Is there a documented need for this project? |
Yes |
|
Documentation: |
Tamarac Stormwater Master Plan, Broward County Local Mitigation Strategy Project List, City of Tamar |
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
|
Yes |
|
Hearing Body: |
Tamarac City Commission / Florida Water Advisory Board / SFWMD |
|
Is this a water project as described in Section 403.885, Laws of Florida? |
|
Yes |
Is the project eligible under section 403.885(2),F.S. to protect public health or the environment; and implement plans developed pursuant to the Surface Water Improvement and Management Act created in part IV of Chapter 373,F.S., other water restoration plans required by law, management plans prepared pursuant to 2.403.067,F.S., or other plans adopted by local government for water quality improvement and water restoration? |
No |
Is your project addressed in a state, regional or local plan (such as a SWIM Plan, Comprehensive Plan, Local Master Plan, etc.)? |
Yes |
Name the plan and cite the pages on which the project is described: |
2004 Capital Improvement Plan (14-2), Tamarac Strategic Plan (page 6), Tamarac Stormwater Master Plan. |
|
Are requesting funding for a stormwater, surface water restoration, or other water management project? |
Yes |
|
In which Water Management District is your project located? |
|
SFWMD |
Have you provided at least 50% match (that is, one-half the total project cost identified in this request? |
Yes |
|
Match Amount: |
2500000 |
|
Match Source: |
City Budget (Pump Station Construction / Stormwater Improvements) |
|
Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? |
No |
Is the project under construction? |
No |
|
Are you requesting funding for a wastewater project? |
No |
|
Are you requesting funding for a drinking water project? |
No |