Community Budget Issue Requests - Tracking Id #1308 |
Boca Raton Intracoastal Parallel Force Main |
|
Requester: |
George S. Brown, Deputy City Manager |
Organization: |
City of Boca Raton |
|
Project Title: |
Boca Raton Intracoastal Parallel Force Main |
Date Submitted |
1/3/2008 3:04:15 PM |
|
Sponsors: |
Atwater |
|
Statewide Interest: |
Project allows for the maintenance and protection of overall water quality through the reduction of possible potential sources of hazardous pollution and elimination of possible contaminants to surface and ground waters that would result from a compromise of the existing force main. |
|
Recipient: |
City of Boca Raton |
|
Contact: |
George S. Brown |
|
|
201 West Palmetto Park Road |
|
Contact Phone: |
(561) 393-7703 |
|
|
Boca Raton 33432 |
|
Contact email: |
gbrown@myboca.us |
|
Counties: |
Palm Beach |
|
Gov't Entity: |
Yes |
Private Organization (Profit/Not for Profit): |
|
|
Project Description: |
Project provides for installation of a parallel wastewater force main under the Intracoastal Waterway connecting the barrier island wastewater collection system to the wastewater treatment facilities on the mainland. There are presently two force mains that transport wastewater from the barrier island to the mainland. Although the existing force main lines have been inspected and found to be in acceptable condition any damage to either line could result in substantial release of raw wastewater into the Intracoastal Waterway and disruption of wastewater services on the barrier island which would resulting in further wastewater spills in the area. The parallel force main will provide system redundancy and allow wastewater flow to be rerouted in case of damage to either of the existing lines. Efficient and effective wastewater treatment collection systems reduce the potential for hazardous pollution of surface and ground water. |
|
Is this a project related to a federal or state declared disaster? |
No |
|
Measurable Outcome Anticipated: |
Continuation of wastewater services to barrier island in event of compromise to existing force mains and ensures the maintenance and protection of overall water quality of surrounding surface and ground waters. |
|
Amount requested from the State for this project this year: |
$495,000 |
|
Total cost of the project: |
$660,000 |
|
Request has been made to fund: |
Construction |
|
What type of match exists for this project? |
Local |
|
Cash Amount |
$165,000 |
|
|
Was this project previously funded by the state? |
|
No |
|
Is future-year funding likely to be requested? |
|
No |
|
Was this project included in an Agency's Budget Request? |
|
No |
|
Was this project included in the Governor's Recommended Budget? |
Yes |
|
Is there a documented need for this project? |
Yes |
|
Documentation: |
City of Boca Raton Capital Improvement Program and Wastewater System Improvement Needs Analysis. |
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
|
Yes |
|
Hearing Body: |
City of Boca Raton City Council |
|
Is this a water project as described in Section 403.885, Laws of Florida? |
|
Yes |
Is the project eligible under section 403.885(2),F.S. to protect public health or the environment; and implement plans developed pursuant to the Surface Water Improvement and Management Act created in part IV of Chapter 373,F.S., other water restoration plans required by law, management plans prepared pursuant to 2.403.067,F.S., or other plans adopted by local government for water quality improvement and water restoration? |
No |
Is your project addressed in a state, regional or local plan (such as a SWIM Plan, Comprehensive Plan, Local Master Plan, etc.)? |
Yes |
Name the plan and cite the pages on which the project is described: |
City of Boca Raton FY 2006-2007 thru FY 2011-2012 Capital Improvement Program Project # 470023 (page 171) |
|
Are requesting funding for a stormwater, surface water restoration, or other water management project? |
No |
|
Are you requesting funding for a wastewater project? |
Yes |
|
Does your project qualify for funding from DEP's 'Small Community Wastewater Treatment Grant Program' under section 403.1838 F.S.? |
No |
|
Have you received or applied for funding for this project from DEP's State Revolving Fund (SRF) program under section 403.1835,F.S.? |
No |
Is the project under construction? |
No |
Have you provided at least 25% match (that is, one-quarter of the total project cost identified in this request? |
Yes |
|
Match Amount: |
165000 |
|
Match Source: |
City of Boca Raton Capital Improvement Program/Water-Sewer Funds |
|
Are you requesting funding for a drinking water project? |
No |