|
Community Budget Issue Requests - Tracking Id #1598 |
Lake Berry Stormwater Treatment Project |
|
Requester: |
Randy Knight |
Organization: |
City of Winter Park |
|
Project Title: |
Lake Berry Stormwater Treatment Project |
Date Submitted |
1/4/2008 4:00:04 PM |
|
Sponsors: |
Constantine |
|
Statewide Interest: |
Treat Stormwater before entering a priority water body |
|
Recipient: |
City of Winter Park |
|
Contact: |
William J. Peebles |
|
|
401 Park Ave |
|
Contact Phone: |
(850) 556-3029 |
|
|
Winter Park 32789 |
|
Contact email: |
bpeebles@nettally.com |
|
Counties: |
Orange |
|
Gov't Entity: |
Yes |
Private Organization (Profit/Not for Profit): |
|
|
Project Description: |
The purpose of this project to reverse the degradation ion water quality experienced in the last three decades on Lake Berry primarily resulting from pollutant laden stormwater runoff. This project will remove pollutants from stormwater runoff currently entering Lake Berry from a 100 acre drainage basin. |
|
Is this a project related to a federal or state declared disaster? |
No |
|
Measurable Outcome Anticipated: |
Reduction of pollutants entering a priority body of water |
|
Amount requested from the State for this project this year: |
$400,000 |
|
Total cost of the project: |
$600,000 |
|
Request has been made to fund: |
Construction |
|
What type of match exists for this project? |
Local |
|
Cash Amount |
$200,000 |
|
|
Was this project previously funded by the state? |
|
No |
|
Is future-year funding likely to be requested? |
|
No |
|
Was this project included in an Agency's Budget Request? |
|
No |
|
Was this project included in the Governor's Recommended Budget? |
No |
|
Is there a documented need for this project? |
Yes |
|
Documentation: |
middle St. Johns River SWIM Plan |
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
|
Yes |
|
Hearing Body: |
Winter Park City Commission |
|
Is this a water project as described in Section 403.885, Laws of Florida? |
|
Yes |
Is the project eligible under section 403.885(2),F.S. to protect public health or the environment; and implement plans developed pursuant to the Surface Water Improvement and Management Act created in part IV of Chapter 373,F.S., other water restoration plans required by law, management plans prepared pursuant to 2.403.067,F.S., or other plans adopted by local government for water quality improvement and water restoration? |
Yes |
Is your project addressed in a state, regional or local plan (such as a SWIM Plan, Comprehensive Plan, Local Master Plan, etc.)? |
Yes |
Name the plan and cite the pages on which the project is described: |
Winter Park Stormwater Master Plan and CIP |
|
Are requesting funding for a stormwater, surface water restoration, or other water management project? |
Yes |
|
In which Water Management District is your project located? |
|
The St. Johns Water Management District |
Have you provided at least 50% match (that is, one-half the total project cost identified in this request? |
Yes |
|
Match Amount: |
200000 |
|
Match Source: |
Local Funds |
|
Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? |
Yes |
|
Name of water body: |
Middle St. Johns River |
|
Describe, specifically, how it will reduce loadings, identify anticipated load reductions for total suspended solids, total nitrogen, total phosphorus, and other contaminants, and specify the practices that will be used to reduce loadings: |
. If yes, describe, specifically, how it will reduce loadings, identify anticipated load reductions for total suspended solids, total nitrogen, total phosphorus, and other contaminants, and specify the practices that will be used to reduce loadings: Consistent with State surface water programs to improve the St. Johns River, into which Lake Berry discharges, the City of Winter Park desires to treat stormwater to remove pollutants and improve water quality within Howell Creek, ultimately discharging into the middle St. Johns River. |
Is the project under construction? |
No |
|
Are you requesting funding for a wastewater project? |
No |
|
Are you requesting funding for a drinking water project? |
No |