|
Community Budget Issue Requests - Tracking Id #1673 |
Trapnell @ Ray Ann/Nesmith Drainage Improvements |
|
Requester: |
Edith Stewart, Public Affairs Officer |
Organization: |
Hillsborough County Board of County Commissioners |
|
Project Title: |
Trapnell @ Ray Ann/Nesmith Drainage Improvements |
Date Submitted |
1/4/2008 12:41:18 PM |
|
Sponsors: |
Storms |
|
Statewide Interest: |
Mitigation of flooding to storm victims. |
|
Recipient: |
Hillsborough County Board of County Commissioners |
|
Contact: |
Frank Deese |
|
|
601 E. Kennedy Boulevard |
|
Contact Phone: |
(813) 307-1828 |
|
|
Tampa 33601 |
|
Contact email: |
deesef@Hillsborough County.org |
|
Counties: |
Hillsborough |
|
Gov't Entity: |
Yes |
Private Organization (Profit/Not for Profit): |
|
|
Project Description: |
Nesmith Road, Ray Ann Dr. and Trapnell Road experience severe flooding on a relatively frequent basis due to an inadequate and non-existent stormwater management system. This has resulted in a traffic hazard due to the threat of hydroplaning. In addition, area properties have experienced inundation, which has threatened local homes. The scope of this project is for the design, land acquisition and construction of a stormwater management system and improved outfall to alleviate these conditions. |
|
Is this a project related to a federal or state declared disaster? |
No |
|
Measurable Outcome Anticipated: |
Prevent repetitive flooding to the roadways and flood-loss to neighborhoods: improve connections between existing drainage systems. |
|
Amount requested from the State for this project this year: |
$241,000 |
|
Total cost of the project: |
$482,000 |
|
Request has been made to fund: |
Construction |
|
What type of match exists for this project? |
Local |
|
Cash Amount |
$241,000 |
|
|
Was this project previously funded by the state? |
|
No |
|
Is future-year funding likely to be requested? |
|
No |
|
Was this project included in an Agency's Budget Request? |
|
No |
|
Was this project included in the Governor's Recommended Budget? |
No |
|
Is there a documented need for this project? |
Yes |
|
Documentation: |
2006 Engineering Assessment of Nesmith Roadway Flooding |
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
|
Yes |
|
Hearing Body: |
Hillsbrough County Legislative Delegation |
|
Is this a water project as described in Section 403.885, Laws of Florida? |
|
Yes |
Is the project eligible under section 403.885(2),F.S. to protect public health or the environment; and implement plans developed pursuant to the Surface Water Improvement and Management Act created in part IV of Chapter 373,F.S., other water restoration plans required by law, management plans prepared pursuant to 2.403.067,F.S., or other plans adopted by local government for water quality improvement and water restoration? |
Yes |
Is your project addressed in a state, regional or local plan (such as a SWIM Plan, Comprehensive Plan, Local Master Plan, etc.)? |
Yes |
Name the plan and cite the pages on which the project is described: |
Comprehensive Plan LOS |
|
Are requesting funding for a stormwater, surface water restoration, or other water management project? |
Yes |
|
In which Water Management District is your project located? |
|
South West Florida Water Management District |
Have you provided at least 50% match (that is, one-half the total project cost identified in this request? |
Yes |
|
Match Amount: |
241000 |
|
Match Source: |
Community Investment Tax |
|
Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? |
No |
Is the project under construction? |
No |
|
Are you requesting funding for a wastewater project? |
No |
|
Are you requesting funding for a drinking water project? |
No |