HB 4161: Nuclear and Integrated Gasification Power Plants
GENERAL BILL by Rehwinkel Vasilinda
Nuclear and Integrated Gasification Power Plants; Repeals cost recovery provisions for siting, design, licensing, & construction of nuclear & integrated gasification combined cycle power plants.
Effective Date: 7/1/2011
Last Action: 5/7/2011 House - Died in Energy and Utilities Subcommittee
Bill Text: Web Page | PDF
Last Action: 5/7/2011 House - Died in Energy and Utilities Subcommittee
Bill Text: Web Page | PDF
-
Bill History
Date Chamber Action 2/11/2011 House • Filed
2/22/2011 House • Referred to Energy and Utilities Subcommittee; State Affairs Committee -HJ 138
3/8/2011 House • Introduced -HJ 138
5/7/2011 House • Indefinitely postponed and withdrawn from consideration
• Died in Energy and Utilities Subcommittee
-
HB 4161, Original Filed Version (Current Bill Version) Posted 2/11/2011 at 8:16 AM
Bill Text: Web Page | PDF Analyses: None Related Bills (1)
Bill Number Subject Filed By Relationship Last Action and Location Track Bills S 200 Nuclear and Integrated Gasification Power Plants Fasano Identical Last Action: 5/7/2011 S Died in Communications, Energy, and Public Utilities
Location: In committee/council (CU)Citations - Statutes (1)
Citation Catchline Location in Bill Location In Bill Help 366.93 Cost recovery for the siting, design, licensing, and construction of nuclear and integrated gasification combined cycle power plants. Page 1 (pdf)