Skip to Navigation | Skip to Main Content | Skip to Site Map

MyFloridaHouse.gov | Mobile Site

Senate Tracker: Sign Up | Login

The Florida Senate

CS/HB 7167: Cost Recovery for Nuclear and Integrated Gasification Combined Cycle Power Plants

GENERAL BILL by Regulatory Affairs Committee ; Energy and Utilities Subcommittee ; Diaz, J.

Cost Recovery for Nuclear and Integrated Gasification Combined Cycle Power Plants; Revises provisions establishing alternative cost recovery mechanisms; revises provisions for calculation of carrying costs; provides identification of certain costs on customer bills; authorizes Public Service Commission to approve recovery of costs after federal licensure under certain conditions; requires commission to review certain proposed nuclear power plants.

Effective Date: 7/1/2013
Last Action: 4/30/2013 House - Laid on Table, companion bill(s) passed, see CS/CS/SB 1472 (Ch. 2013-184) -HJ 1016
Bill Text: PDF

Expand All Collapse All

  • Bill History

    Date Chamber Action
    4/11/2013 House • Filed
    • Introduced -HJ 570
    4/12/2013 House • Referred to Regulatory Affairs Committee -HJ 610
    • On Committee agenda-- Regulatory Affairs Committee, 04/16/13, 9:00 am, 404 HOB
    4/16/2013 House • CS by- Regulatory Affairs Committee; YEAS 15 NAYS 1 -HJ 703
    4/22/2013 House • Pending review of CS -under Rule 7.19(c)
    • CS by Regulatory Affairs Committee read 1st time -HJ 701
    4/23/2013 House • Placed on Calendar -HJ 735
    4/26/2013 House • Placed on Special Order Calendar, 04/29/13
    4/29/2013 House • Retained on Calendar
    • Placed on Special Order Calendar, 04/30/13
    4/30/2013 House • Substituted CS/CS/SB 1472 -HJ 1016
    • Laid on Table, companion bill(s) passed, see CS/CS/SB 1472 (Ch. 2013-184) -HJ 1016

    Top of SectionTop of Page

  • CS/HB 7167, Committee Substitute 1 (Current Bill Version) Posted 4/22/2013 at 11:12 AM

    Bill Text:   PDF
    Analyses:   Energy and Utilities Subcommittee (Post-Meeting) 7/11/2013 (pdf)

    Related Bills (1)

    Bill Number Subject Filed By Relationship Last Action and Location Track Bills
    S 1472 (er) Nuclear and Integrated Gasification Combined Cycle Power Plants Legg Compare Last Action: 6/17/2013 Chapter No. 2013-184
    Location: Became Law

    Floor Amendments (7)

    Amendment Sponsor Filed Last Floor Action Format
    706161 - Amendment
    Remove lines 31-32 and insert:
    Rehwinkel Vasilinda 4/29/2013
    7:32 AM
    PDF
    853167 - Amendment
    Remove lines 36-39 and insert:
    Dudley 4/29/2013
    7:53 AM
    PDF
    566941 - Amendment
    Remove lines 56-58 and insert:
    Rehwinkel Vasilinda 4/29/2013
    7:31 AM
    PDF
    445133 - Amendment
    Remove lines 78-81 and insert:
    Rehwinkel Vasilinda 4/29/2013
    7:33 AM
    PDF
    130425 - Amendment
    Between lines 81 and 82, insert:
    Dudley 4/29/2013
    7:48 AM
    PDF
    929061 - Amendment
    Between lines 100 and 101, insert:
    Rehwinkel Vasilinda 4/29/2013
    7:32 AM
    PDF
    301545 - Amendment
    Between lines 100 and 101, insert:
    Rehwinkel Vasilinda 4/29/2013
    7:32 AM
    PDF

    Citations - Statutes (1)

    Citation Catchline Location in Bill Location In Bill Help
    366.93 Cost recovery for the siting, design, licensing, and construction of nuclear and integrated gasification combined cycle power plants.

    Top of SectionTop of Page

  • HB 7167, Original Filed Version Posted 4/11/2013 at 4:30 PM

    Bill Text:   PDF
    Analyses:   Regulatory Affairs Committee (Post-Meeting) 4/22/2013 (pdf)

    Related Bills (1)

    Bill Number Subject Filed By Relationship Last Action and Location Track Bills
    S 1472 (c2) Nuclear and Integrated Gasification Combined Cycle Power Plants Legg Compare Last Action: 6/17/2013 Chapter No. 2013-184
    Location: Became Law

    Committee Amendments (6)

    Amendment Sponsor Filed Last Committee Action Format
    893881 - Strike All Amendment
    Remove everything after the enacting clause and insert:
    Diaz, J. 4/15/2013
    9:17 PM
    Adopted without Objection
    4/16/2013
    PDF
    hierarchy 422973 - Amendment to Amendment (893881)
    Remove lines 17-19 of the amendment and insert:
    Rehwinkel Vasilinda 4/15/2013
    9:21 PM
    Failed to Adopt
    4/16/2013
    PDF
    hierarchy 185743 - Amendment to Amendment (893881)
    Remove lines 22-25 of the amendment and insert:
    Rehwinkel Vasilinda 4/15/2013
    9:26 PM
    Failed to Adopt
    4/16/2013
    PDF
    hierarchy 790557 - Amendment to Amendment (893881)
    Between lines 86 and 87 of the amendment, insert:
    Rehwinkel Vasilinda 4/15/2013
    9:31 PM
    Withdrawn
    4/16/2013
    PDF
    hierarchy 407815 - Amendment to Amendment (893881)
    Between lines 86 and 87 of the amendment, insert:
    Rehwinkel Vasilinda 4/15/2013
    9:34 PM
    Withdrawn
    4/16/2013
    PDF
    hierarchy 761317 - Amendment to Amendment (893881)
    Between lines 86 and 87 of the amendment, insert:
    Rehwinkel Vasilinda 4/15/2013
    9:37 PM
    Withdrawn
    4/16/2013
    PDF

    Citations - Statutes (1)

    Citation Catchline Location in Bill Location In Bill Help
    366.93 Cost recovery for the siting, design, licensing, and construction of nuclear and integrated gasification combined cycle power plants.

    Top of SectionTop of Page