CS/HB 7167: Cost Recovery for Nuclear and Integrated Gasification Combined Cycle Power Plants
GENERAL BILL by Regulatory Affairs Committee ; Energy and Utilities Subcommittee ; Diaz, J.
Cost Recovery for Nuclear and Integrated Gasification Combined Cycle Power Plants; Revises provisions establishing alternative cost recovery mechanisms; revises provisions for calculation of carrying costs; provides identification of certain costs on customer bills; authorizes Public Service Commission to approve recovery of costs after federal licensure under certain conditions; requires commission to review certain proposed nuclear power plants.
Last Action: 4/30/2013 House - Laid on Table, companion bill(s) passed, see CS/CS/SB 1472 (Ch. 2013-184) -HJ 1016
Bill Text: PDF
-
Bill History
Date Chamber Action 4/11/2013 House • Filed
• Introduced -HJ 570
4/12/2013 House • Referred to Regulatory Affairs Committee -HJ 610
• On Committee agenda-- Regulatory Affairs Committee, 04/16/13, 9:00 am, 404 HOB
4/16/2013 House • CS by- Regulatory Affairs Committee; YEAS 15 NAYS 1 -HJ 703
4/22/2013 House • Pending review of CS -under Rule 7.19(c)
• CS by Regulatory Affairs Committee read 1st time -HJ 701
4/23/2013 House • Placed on Calendar -HJ 735
4/26/2013 House • Placed on Special Order Calendar, 04/29/13
4/29/2013 House • Retained on Calendar
• Placed on Special Order Calendar, 04/30/13
4/30/2013 House • Substituted CS/CS/SB 1472 -HJ 1016
• Laid on Table, companion bill(s) passed, see CS/CS/SB 1472 (Ch. 2013-184) -HJ 1016
-
CS/HB 7167, Committee Substitute 1 (Current Bill Version) Posted 4/22/2013 at 11:12 AM
Bill Text: PDF Analyses: Energy and Utilities Subcommittee (Post-Meeting) 7/11/2013 (pdf)
Related Bills (1)
Bill Number Subject Filed By Relationship Last Action and Location Track Bills S 1472 (er) Nuclear and Integrated Gasification Combined Cycle Power Plants Legg Compare Last Action: 6/17/2013 Chapter No. 2013-184
Location: Became LawFloor Amendments (7)
Amendment Sponsor Filed Last Floor Action Format 706161 - Amendment
Remove lines 31-32 and insert:Rehwinkel Vasilinda 4/29/2013
7:32 AMPDF 853167 - Amendment
Remove lines 36-39 and insert:Dudley 4/29/2013
7:53 AMPDF 566941 - Amendment
Remove lines 56-58 and insert:Rehwinkel Vasilinda 4/29/2013
7:31 AMPDF 445133 - Amendment
Remove lines 78-81 and insert:Rehwinkel Vasilinda 4/29/2013
7:33 AMPDF 130425 - Amendment
Between lines 81 and 82, insert:Dudley 4/29/2013
7:48 AMPDF 929061 - Amendment
Between lines 100 and 101, insert:Rehwinkel Vasilinda 4/29/2013
7:32 AMPDF 301545 - Amendment
Between lines 100 and 101, insert:Rehwinkel Vasilinda 4/29/2013
7:32 AMPDF Citations - Statutes (1)
Citation Catchline Location in Bill Location In Bill Help 366.93 Cost recovery for the siting, design, licensing, and construction of nuclear and integrated gasification combined cycle power plants. -
HB 7167, Original Filed Version Posted 4/11/2013 at 4:30 PM
Bill Text: PDF Analyses: Regulatory Affairs Committee (Post-Meeting) 4/22/2013 (pdf)
Related Bills (1)
Bill Number Subject Filed By Relationship Last Action and Location Track Bills S 1472 (c2) Nuclear and Integrated Gasification Combined Cycle Power Plants Legg Compare Last Action: 6/17/2013 Chapter No. 2013-184
Location: Became LawCommittee Amendments (6)
Amendment Sponsor Filed Last Committee Action Format 893881 - Strike All Amendment
Remove everything after the enacting clause and insert:Diaz, J. 4/15/2013
9:17 PMAdopted without Objection
4/16/2013PDF 422973 - Amendment to Amendment (893881)
Remove lines 17-19 of the amendment and insert:Rehwinkel Vasilinda 4/15/2013
9:21 PMFailed to Adopt
4/16/2013PDF 185743 - Amendment to Amendment (893881)
Remove lines 22-25 of the amendment and insert:Rehwinkel Vasilinda 4/15/2013
9:26 PMFailed to Adopt
4/16/2013PDF 790557 - Amendment to Amendment (893881)
Between lines 86 and 87 of the amendment, insert:Rehwinkel Vasilinda 4/15/2013
9:31 PMWithdrawn
4/16/2013PDF 407815 - Amendment to Amendment (893881)
Between lines 86 and 87 of the amendment, insert:Rehwinkel Vasilinda 4/15/2013
9:34 PMWithdrawn
4/16/2013PDF 761317 - Amendment to Amendment (893881)
Between lines 86 and 87 of the amendment, insert:Rehwinkel Vasilinda 4/15/2013
9:37 PMWithdrawn
4/16/2013PDF Citations - Statutes (1)
Citation Catchline Location in Bill Location In Bill Help 366.93 Cost recovery for the siting, design, licensing, and construction of nuclear and integrated gasification combined cycle power plants.