HB 353: Advanced Cost Recovery
GENERAL BILL by Burgess ; (CO-INTRODUCERS) Latvala ; Murphy ; Sprowls
Advanced Cost Recovery; Prohibits PSC from authorizing use of advanced cost recovery by utility for more than one plant at any one time; requires PSC to conduct periodic reviews; requires PSC to order refunds of advanced costs collected under specific circumstances.
Effective Date: 7/1/2015
Last Action: 4/28/2015 House - Died in Energy and Utilities Subcommittee
Bill Text: PDF
Last Action: 4/28/2015 House - Died in Energy and Utilities Subcommittee
Bill Text: PDF
-
Bill History
Date Chamber Action 1/19/2015 House • Filed
1/28/2015 House • Referred to Energy and Utilities Subcommittee; Government Operations Appropriations Subcommittee; Regulatory Affairs Committee -HJ 32
3/3/2015 House • Introduced -HJ 32
4/28/2015 House • Died in Energy and Utilities Subcommittee
-
HB 353, Original Filed Version (Current Bill Version) Posted 1/19/2015 at 4:55 PM
Bill Text: PDF Analyses: None Citations - Statutes (1)
Citation Catchline Location in Bill Location In Bill Help 366.93 Cost recovery for the siting, design, licensing, and construction of nuclear and integrated gasification combined cycle power plants. Page 1 (pdf)