Skip to Navigation | Skip to Main Content | Skip to Site Map

MyFloridaHouse.gov | Mobile Site

Senate Tracker: Sign Up | Login

The Florida Senate

HB 473: Repeal of Advanced Nuclear Cost Recovery

GENERAL BILL by Ahern ; (CO-INTRODUCERS) Combee ; Latvala ; Murphy ; Pritchett ; Rodriguez, J. ; Watson, B.

Repeal of Advanced Nuclear Cost Recovery; Repeals provisions relating to cost recovery mechanisms for siting, design, licensing, & construction of nuclear & integrated gasification combined cycle power plants; deletes provisions limiting challenges to utility's right to recover costs incurred prior to commercial operation of certain plants; prohibits utilities from continuing to collect advanced costs for certain plants after specified date.

Effective Date: 9/1/2015
Last Action: 4/28/2015 House - Died in Energy and Utilities Subcommittee
Bill Text: PDF

Expand All Collapse All

  • Bill History

    Date Chamber Action
    1/20/2015 House • Filed
    1/28/2015 House • Referred to Energy and Utilities Subcommittee; Government Operations Appropriations Subcommittee; Regulatory Affairs Committee -HJ 40
    3/3/2015 House • Introduced -HJ 40
    4/28/2015 House • Died in Energy and Utilities Subcommittee

    Top of SectionTop of Page

  • HB 473, Original Filed Version (Current Bill Version) Posted 1/20/2015 at 2:58 PM

    Bill Text:   PDF
    Analyses:   None

    Related Bills (2)

    Bill Number Subject Filed By Relationship Last Action and Location Track Bills
    H 67 Utility Advanced Cost Recovery Fee Murphy, Latvala Compare Last Action: 4/28/2015 H Died in Energy and Utilities Subcommittee
    Location: In committee/council (EUS)
    H 4001 Repeal of Advanced Nuclear Cost Recovery Rehwinkel Vasilinda Compare Last Action: 4/28/2015 H Died in Energy and Utilities Subcommittee
    Location: In committee/council (EUS)

    Citations - Statutes (2)

    Citation Catchline Location in Bill Location In Bill Help
    366.93 Cost recovery for the siting, design, licensing, and construction of nuclear and integrated gasification combined cycle power plants. Page 1 (pdf)
    403.519 Exclusive forum for determination of need. Page 2 (pdf)

    Top of SectionTop of Page