HB 473: Repeal of Advanced Nuclear Cost Recovery
GENERAL BILL by Ahern ; (CO-INTRODUCERS) Combee ; Latvala ; Murphy ; Pritchett ; Rodriguez, J. ; Watson, B.
Repeal of Advanced Nuclear Cost Recovery; Repeals provisions relating to cost recovery mechanisms for siting, design, licensing, & construction of nuclear & integrated gasification combined cycle power plants; deletes provisions limiting challenges to utility's right to recover costs incurred prior to commercial operation of certain plants; prohibits utilities from continuing to collect advanced costs for certain plants after specified date.
Last Action: 4/28/2015 House - Died in Energy and Utilities Subcommittee
Bill Text: PDF
-
Bill History
Date Chamber Action 1/20/2015 House • Filed
1/28/2015 House • Referred to Energy and Utilities Subcommittee; Government Operations Appropriations Subcommittee; Regulatory Affairs Committee -HJ 40
3/3/2015 House • Introduced -HJ 40
4/28/2015 House • Died in Energy and Utilities Subcommittee
-
HB 473, Original Filed Version (Current Bill Version) Posted 1/20/2015 at 2:58 PM
Bill Text: PDF Analyses: None Related Bills (2)
Bill Number Subject Filed By Relationship Last Action and Location Track Bills H 67 Utility Advanced Cost Recovery Fee Murphy, Latvala Compare Last Action: 4/28/2015 H Died in Energy and Utilities Subcommittee
Location: In committee/council (EUS)H 4001 Repeal of Advanced Nuclear Cost Recovery Rehwinkel Vasilinda Compare Last Action: 4/28/2015 H Died in Energy and Utilities Subcommittee
Location: In committee/council (EUS)Citations - Statutes (2)
Citation Catchline Location in Bill Location In Bill Help 366.93 Cost recovery for the siting, design, licensing, and construction of nuclear and integrated gasification combined cycle power plants. Page 1 (pdf) 403.519 Exclusive forum for determination of need. Page 2 (pdf)