Skip to Navigation | Skip to Main Content | Skip to Site Map

MyFloridaHouse.gov | Mobile Site

Senate Tracker: Sign Up | Login

The Florida Senate

SB 1478: Utility Advanced Cost Recovery

GENERAL BILL by Sobel

Utility Advanced Cost Recovery; Providing for the expiration of provisions authorizing advanced cost recovery for nuclear and integrated gasification combined cycle power plants; requiring certain funds to be returned to ratepayers; prohibiting utilities from continuing to collect advanced costs for certain plants after a specified date, etc.

Effective Date: Upon becoming a law
Last Action: 1/15/2016 Senate - Withdrawn from further consideration
Bill Text: Web Page | PDF

Expand All Collapse All

  • Bill History

    Date Chamber Action
    1/7/2016 Senate • Filed
    1/14/2016 Senate • Referred to Communications, Energy, and Public Utilities; Appropriations Subcommittee on General Government; Appropriations
    1/15/2016 Senate • Withdrawn from Communications, Energy, and Public Utilities; Appropriations Subcommittee on General Government; Appropriations -SJ 218
    • Withdrawn from further consideration

    Top of SectionTop of Page

  • SB 1478, Original Filed Version (Current Bill Version) Posted 1/7/2016 at 12:09 PM

    Bill Text:   Web Page | PDF
    Analyses:   None

    Related Bills (2)

    Bill Number Subject Filed By Relationship Last Action and Location Track Bills
    H 395 Utility Advanced Cost Recovery Murphy, Latvala Identical Last Action: 3/11/2016 H Died in Energy and Utilities Subcommittee
    Location: In committee/council (EUS)
    H 4057 Repeal of Advanced Nuclear Cost Recovery Rehwinkel Vasilinda Compare Last Action: 3/11/2016 H Died in Energy and Utilities Subcommittee
    Location: In committee/council (EUS)

    Citations - Statutes (3)

    Citation Catchline Location in Bill Location In Bill Help
    366.93 Cost recovery for the siting, design, licensing, and construction of nuclear and integrated gasification combined cycle power plants. Page 1 (pdf)
    366.95 Financing for certain nuclear generating asset retirement or abandonment costs. Page 2 (pdf)
    403.519 Exclusive forum for determination of need. Page 3 (pdf)

    Top of SectionTop of Page