SB 1478: Utility Advanced Cost Recovery
GENERAL BILL by Sobel
Utility Advanced Cost Recovery; Providing for the expiration of provisions authorizing advanced cost recovery for nuclear and integrated gasification combined cycle power plants; requiring certain funds to be returned to ratepayers; prohibiting utilities from continuing to collect advanced costs for certain plants after a specified date, etc.
Effective Date: Upon becoming a law
Last Action: 1/15/2016 Senate - Withdrawn from further consideration
Bill Text: Web Page | PDF
Last Action: 1/15/2016 Senate - Withdrawn from further consideration
Bill Text: Web Page | PDF
-
Bill History
Date Chamber Action 1/7/2016 Senate • Filed
1/14/2016 Senate • Referred to Communications, Energy, and Public Utilities; Appropriations Subcommittee on General Government; Appropriations
1/15/2016 Senate • Withdrawn from Communications, Energy, and Public Utilities; Appropriations Subcommittee on General Government; Appropriations -SJ 218
• Withdrawn from further consideration
-
SB 1478, Original Filed Version (Current Bill Version) Posted 1/7/2016 at 12:09 PM
Bill Text: Web Page | PDF Analyses: None Related Bills (2)
Bill Number Subject Filed By Relationship Last Action and Location Track Bills H 395 Utility Advanced Cost Recovery Murphy, Latvala Identical Last Action: 3/11/2016 H Died in Energy and Utilities Subcommittee
Location: In committee/council (EUS)H 4057 Repeal of Advanced Nuclear Cost Recovery Rehwinkel Vasilinda Compare Last Action: 3/11/2016 H Died in Energy and Utilities Subcommittee
Location: In committee/council (EUS)Citations - Statutes (3)
Citation Catchline Location in Bill Location In Bill Help 366.93 Cost recovery for the siting, design, licensing, and construction of nuclear and integrated gasification combined cycle power plants. Page 1 (pdf) 366.95 Financing for certain nuclear generating asset retirement or abandonment costs. Page 2 (pdf) 403.519 Exclusive forum for determination of need. Page 3 (pdf)