Skip to Navigation | Skip to Main Content | Skip to Site Map

MyFloridaHouse.gov | Mobile Site

Senate Tracker: Sign Up | Login

The Florida Senate

HB 395: Utility Advanced Cost Recovery

GENERAL BILL by Murphy ; Latvala ; (CO-INTRODUCERS) Burgess ; Dudley ; Pafford ; Rehwinkel Vasilinda

Utility Advanced Cost Recovery; Provides for expiration of advanced cost recovery for nuclear & integrated gasification combined cycle power plants; requires certain funds to be returned to ratepayers; prohibits utilities from imposing charges to offset loss of utility revenues as result of refunding moneys from collection of advanced cost recovery fees; provides for future repeal.

Effective Date: upon becoming a law
Last Action: 3/11/2016 House - Died in Energy and Utilities Subcommittee
Bill Text: PDF

Expand All Collapse All

  • Bill History

    Date Chamber Action
    10/20/2015 House • Filed
    10/30/2015 House • Referred to Energy and Utilities Subcommittee; Government Operations Appropriations Subcommittee; Regulatory Affairs Committee -HJ 34
    1/12/2016 House • Introduced -HJ 34
    3/11/2016 House • Died in Energy and Utilities Subcommittee

    Top of SectionTop of Page

  • HB 395, Original Filed Version (Current Bill Version) Posted 10/20/2015 at 3:46 PM

    Bill Text:   PDF
    Analyses:   None

    Related Bills (2)

    Bill Number Subject Filed By Relationship Last Action and Location Track Bills
    S 1478 Utility Advanced Cost Recovery Sobel Identical Last Action: 1/15/2016 S Withdrawn from further consideration
    Location: Withdrawn from consideration
    H 4057 Repeal of Advanced Nuclear Cost Recovery Rehwinkel Vasilinda Compare Last Action: 3/11/2016 H Died in Energy and Utilities Subcommittee
    Location: In committee/council (EUS)

    Citations - Statutes (3)

    Citation Catchline Location in Bill Location In Bill Help
    366.93 Cost recovery for the siting, design, licensing, and construction of nuclear and integrated gasification combined cycle power plants. Page 1 (pdf)
    366.95 Financing for certain nuclear generating asset retirement or abandonment costs. Page 2 (pdf)
    403.519 Exclusive forum for determination of need. Page 3 (pdf)

    Top of SectionTop of Page