HB 395: Utility Advanced Cost Recovery
GENERAL BILL by Murphy ; Latvala ; (CO-INTRODUCERS) Burgess ; Dudley ; Pafford ; Rehwinkel Vasilinda
Utility Advanced Cost Recovery; Provides for expiration of advanced cost recovery for nuclear & integrated gasification combined cycle power plants; requires certain funds to be returned to ratepayers; prohibits utilities from imposing charges to offset loss of utility revenues as result of refunding moneys from collection of advanced cost recovery fees; provides for future repeal.
Last Action: 3/11/2016 House - Died in Energy and Utilities Subcommittee
Bill Text: PDF
-
Bill History
Date Chamber Action 10/20/2015 House • Filed
10/30/2015 House • Referred to Energy and Utilities Subcommittee; Government Operations Appropriations Subcommittee; Regulatory Affairs Committee -HJ 34
1/12/2016 House • Introduced -HJ 34
3/11/2016 House • Died in Energy and Utilities Subcommittee
-
HB 395, Original Filed Version (Current Bill Version) Posted 10/20/2015 at 3:46 PM
Bill Text: PDF Analyses: None Related Bills (2)
Bill Number Subject Filed By Relationship Last Action and Location Track Bills S 1478 Utility Advanced Cost Recovery Sobel Identical Last Action: 1/15/2016 S Withdrawn from further consideration
Location: Withdrawn from considerationH 4057 Repeal of Advanced Nuclear Cost Recovery Rehwinkel Vasilinda Compare Last Action: 3/11/2016 H Died in Energy and Utilities Subcommittee
Location: In committee/council (EUS)Citations - Statutes (3)
Citation Catchline Location in Bill Location In Bill Help 366.93 Cost recovery for the siting, design, licensing, and construction of nuclear and integrated gasification combined cycle power plants. Page 1 (pdf) 366.95 Financing for certain nuclear generating asset retirement or abandonment costs. Page 2 (pdf) 403.519 Exclusive forum for determination of need. Page 3 (pdf)