SB 716: Nuclear Cost Recovery
GENERAL BILL by Rodriguez
Nuclear Cost Recovery; Repealing provisions relating to cost recovery mechanisms for the siting, design, licensing, and construction of nuclear and integrated gasification combined cycle power plants, including mechanisms that promote utility investment in, and allow for recovery in electric utility rates of certain costs of, such plants; repealing provisions relating to financing for certain nuclear generating asset retirement or abandonment costs, etc.
Last Action: 3/10/2018 Senate - Died in Communications, Energy, and Public Utilities
Bill Text: Web Page | PDF
- Communications, Energy, and Public Utilities (CU)
- Community Affairs (CA)
- Rules (RC)
-
Bill History
Date Chamber Action 11/1/2017 Senate • Filed
11/15/2017 Senate • Referred to Communications, Energy, and Public Utilities; Community Affairs; Rules -SJ 56
1/9/2018 Senate • Introduced -SJ 56
3/10/2018 Senate • Indefinitely postponed and withdrawn from consideration
• Died in Communications, Energy, and Public Utilities
-
SB 716, Original Filed Version (Current Bill Version) Posted 11/1/2017 at 11:48 AM
Bill Text: Web Page | PDF Analyses: None Related Bills (1)
Bill Number Subject Filed By Relationship Last Action and Location Track Bills H 6071 Repeal of Nuclear Cost Recovery Diamond Identical Last Action: 3/10/2018 H Died in Energy and Utilities Subcommittee Citations - Statutes (3)
Citation Catchline Location in Bill Location In Bill Help 366.93 Cost recovery for the siting, design, licensing, and construction of nuclear and integrated gasification combined cycle power plants. Page 1 (pdf) 366.95 Financing for certain nuclear generating asset retirement or abandonment costs. Page 1 (pdf) 403.519 Exclusive forum for determination of need. Page 1 (pdf)