Skip to Navigation | Skip to Main Content | Skip to Site Map

MyFloridaHouse.gov | Mobile Site

Senate Tracker: Sign Up | Login

The Florida Senate

Senate Committee Publications

CBIRS Request 2282
 
Community Budget Issue Requests - Tracking Id #2282
Eatonville Fire Dept. Renovations
 
Requester: Councilwoman Evelyn Nash Organization: Town of Eatonville
 
Project Title: Eatonville Fire Dept. Renovations Date Submitted 1/15/2003 12:02:19 PM
 
Sponsors: Siplin
 
Statewide Interest:
While the Town of Eatonville's Disaster Management Plan is specific to the community, the Town is a also a signatory of Orange County's Emergency Management Strategic Plan. The Eatonville Plan is designed to layer Orange County's Comprehensive Emergency Management Plan, which is layered to the State of Florida Emergency Management Plan and the Federal Response Plans. This layering (mirroring the plan's concepts an dformats) facilitates an effective mutual aid transistion for assistance when the local disaster incident escalates beyond the Town's capabilities and resources. This demonstrates that Eatonville's plan is consistent in every respect to the emergency management plans (county, state, and federal) upon which it is layered. The primary linkages between Eatonville's Disaster Management Plan, the Orange County Comprehensive Management Plan, and the State of Florida Comprehensive Management Plan are shared and mirroreed in 20 emergency support funcitons. A number of the support funcitons relating to disaster mitigation strategies may be impacted or impeded due to the curren condition of Eatonville's Fire Station facility, which continues to expose fire station contents (apparatus, gear, communicaitons equipment) and staff to a state of significant risk. Some of these support functions would include the following areas: . Transportation . Communications . Fire Services . Information and Planning . Health and Medical . Search and REscue . Hazardous Materials
 
Recipient: William Griffen, Fire Chief   Contact: Edward Cole, CAO  
  307 E. Kennedy Blvd   Contact Phone: (407) 623-1313  
  Eatonville 32751
 
Counties: Orange
 
Gov't Entity: Yes Private Organization (Profit/Not for Profit):  
 
Project Description:
Fire Station Renovation and Construction The project would consist of the following components: 1. Renovation of old structure. 2. Construction of new metal structure (garage). 3. Installation of perimeter security fencing around facility. 4. Upgrade of communications equipment and networking infrastructure. 5. Reinforcement of the exterior structure with brick veneer for reinforcement against wind. 6. Installation of metal shutter and windows to meet hurricane code. 7. Installation of doors with security features. 8. Installation of perimeter security bollards to inhibit vehicle intrusion.
 
Is this a water project as described in Chapter 2002-291, Laws of Florida? No
 
Measurable Outcome Anticipated:
1. Increased self-sufficiency that REDUCES the drain on resources of the local mutual aid agreement and allows for the establishment and maintenance of fully self-sustaining capabilities for the first 72 hours following a disaster. 2. Improved capacity to REDUCE vulnerability of the fire station's apparatur, equipment, and communications system to potential high wind and rain damage. 3. Improved capacity to respond to fire emergencies that REDUCES the risk to life and property by housing equipment and fire rescue squads in a facility that meets current code standards. 4. REDUCED risk of injury to occupants of the building and emergency personnel. 5. INCREASED protection of the facility, equipment, and emergency personnel from potential threats of terrorism.
 
Amount requested from the State for this project this year: $200,000
 
Total cost of the project: $200,000
 
Request has been made to fund: Construction
 
What type of match exists for this project? None
  Cash Amount $  
 
Was this project previously funded by the state?   No
 
Is future-year funding likely to be requested?   No
 
Was this project included in an Agency's Budget Request?   No
 
Was this project included in the Governor's Recommended Budget? No
 
Is there a documented need for this project? Yes
  Documentation: Orange County Mitigation Planning Working Group
 
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)?   Yes
  Hearing Body: Eatonville City Council
  Hearing Meeting Date: 01/07/2002