|
Community Budget Issue Requests - Tracking Id #1680 |
Harbor Palms / Batside Meadows Stormwater Drainange |
|
Requester: |
Bruce T. Haddock, City Manager |
Organization: |
City of Oldsmar |
|
Project Title: |
Harbor Palms / Batside Meadows Stormwater Drainange |
Date Submitted |
1/16/2004 11:22:15 AM |
|
Sponsors: |
Sebesta |
|
Statewide Interest: |
This project will provide for stormwater drainage to reduce flooding, protect environmentally sensitive bodies of water (by filtering runoff pollutants) and protect public health by reducing contaminants in waterways used for recreation and reducing human exposure to standing floodwaters which may contain hazardous microbes or poisonous contaminants. |
|
Recipient: |
City of Oldsmar |
|
Contact: |
Melodee Dinwiddie |
|
|
100 State Street West |
|
Contact Phone: |
(813) 749-1102 |
|
|
Oldsmar 34677-3655 |
|
Contact email: |
mdinwiddie@ci.oldsmar.fl.us |
|
Counties: |
Pinellas |
|
Gov't Entity: |
Yes |
Private Organization (Profit/Not for Profit): |
|
|
Project Description: |
This project includes providing engineering services for the design and permitting of stormwater drainage improvements along an existing 40 foot wide ditch in the Harbor Palms & Bayside Meadows subdivisions. The proposed improvements will require the installation of large box culverts and piping along the existing 2270 foot long ditch and modification to the existing outfall control structure and retention area. Southwest Florida WMD and Florida DEP permits will be required for this project. |
|
Is this a water project as described in Chapter 2002-291, Laws of Florida? |
Yes |
Has the project been submitted to the Department of Environmental Protection? |
Yes |
DEP Identfying Number: |
SW20032009 |
|
Measurable Outcome Anticipated: |
This project will provide for stormwater drainage to reduce flooding, protect environmentally sensitive bodies of water (by filtering runoff pollutants) and protect public health by reducing contaminants in waterways used for recreation and reducing human exposure to standing floodwaters which may contain hazardous microbes or poisonous contaminants. |
|
Amount requested from the State for this project this year: |
$671,000 |
|
Total cost of the project: |
$895,000 |
|
Request has been made to fund: |
Construction |
|
What type of match exists for this project? |
Local |
|
Cash Amount |
$224,000 |
|
|
Was this project previously funded by the state? |
|
No |
|
Is future-year funding likely to be requested? |
|
No |
|
Was this project included in an Agency's Budget Request? |
|
Unknown |
|
Was this project included in the Governor's Recommended Budget? |
Unknown |
|
Is there a documented need for this project? |
Yes |
|
Documentation: |
locally adopted stormwater plan |
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
|
Yes |
|
Hearing Body: |
City of Oldsmar City Council |
|
Hearing Meeting Date: |
01/16/2001 |