Skip to Navigation | Skip to Main Content | Skip to Site Map

MyFloridaHouse.gov | Mobile Site

Senate Tracker: Sign Up | Login

The Florida Senate

Senate Committee Publications

CBIRS Request 2094
 
Community Budget Issue Requests - Tracking Id #2094
Marigold Road Storage & Re-Pump Station
 
Requester: Michael Stampfler, City Manager Organization: City of Casselberry
 
Project Title: Marigold Road Storage & Re-Pump Station Date Submitted 1/13/2006 4:44:27 PM
 
Sponsors: Constantine
 
Statewide Interest:
Conservation of the Floridian Aquifer and the reuse of reclaimed water for irrigation.
 
Recipient: City of Casselberry   Contact: Tony Segreto, Public Works Director  
  95 Triplet Lake Drive   Contact Phone: (407) 262-7725  
  Casselberry 32707   Contact email:  
 
Counties: Seminole
 
Gov't Entity: Yes Private Organization (Profit/Not for Profit):  
 
Project Description:
The purpose of this project is to construct a 200,000 gallon reclaimed water ground storage tank and pumping facilities near the southern boundary of the reuse system as shown on the following figure. The Marigold Road property is already owned by the City, and is large enough for the proposed facilities. These facilities are necessary because the water reclamation facility and existing reclaimed water storage and pumping facilities are located near the northern edge of the reclaimed water distribution system. Due to the geographical distances involved, adequate reuse system pressures in the southern portions cannot be supported by the existing facilities to allow the expansion of the reuse distribution system any further in that area. A 200,000 gallon concrete ground storage tank would be constructed to store reclaimed water for use during peak demand times. It would be filled during offpeak hours from the trunk reclaimed water main adjacent to the site. Two centrifugal pumps would pump reclaimed water from this tank, re-pressurize it to 75 psi and pump it back into the distribution system during peak demand periods. It is estimated that an additional 1,000 equivalent residential customers could be served by addition of these facilities, for a potable water savings of 400,000 gpd.
 
Is this a project related to a federal or state declared disaster? No
 
Measurable Outcome Anticipated:
It is estimated that an additional 1,000 equivalent residential customers could be served by the addition of these facilities, for a potable water savings of 400,000 gpd.
 
Amount requested from the State for this project this year: $300,000
 
Total cost of the project: $400,000
 
Request has been made to fund: Construction
 
What type of match exists for this project? Local
  Cash Amount $100,000  
 
Was this project previously funded by the state?   No
 
Is future-year funding likely to be requested?   No
 
Was this project included in an Agency's Budget Request?   No
 
Was this project included in the Governor's Recommended Budget? No
 
Is there a documented need for this project? Yes
  Documentation: Needs and expanation overview supplied by the City of Casselberry
 
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)?   No
 
Is this a water project as described in Section 403.885, Laws of Florida?   Yes
Has the project been submitted to the Department of Environmental Protection? No
Is this project eligible under section 403.885(5) F.S.? No
 
Is your project addressed in a state, regional or local plan (such as a SWIM plan, Comprehensive Plan, local master plan, etc.)? Yes
Name the plan and cite the pages on which the project is described:
Local Reuse Master Plan, pages 3-1 to 3-8, and5-Year CIP, pages 145-147
 
If you are requesting funding for a stormwater or surface water restoration project:
 
Which Water Management District has the jurisdiction of your project?
   
 
If you are requesting funding for a wastewater project:
 
Does your project qualify for funding from DEP's 'Small Community Wastewater Treatment Grant Program' under section 403.1838 F.S.? No
 
Other wastewater projects:
 
Have you received previous legislative funding for this project? No
 
Is the project under construction? No
 
Have you provided at least a 25% local match? Yes
  Amount: 100000 Source: Water & Sewer Fund