Skip to Navigation | Skip to Main Content | Skip to Site Map

MyFloridaHouse.gov | Mobile Site

Senate Tracker: Sign Up | Login

The Florida Senate

Senate Committee Publications

CBIRS Request 2653
 
Community Budget Issue Requests - Tracking Id #2653
Fairlawn Storm Sewer Pump Station Project, Phase IIA, B-50702
 
Requester: Mary H. Conway, P.E., Director Organization: City of Miami
 
Project Title: Fairlawn Storm Sewer Pump Station Project, Phase IIA, B-50702 Date Submitted 1/12/2006 5:44:16 PM
 
Sponsors: Diaz de la Portilla
 
Statewide Interest:
This project is regional in schope by controlling the discharge of stormwater in the C-4 drainage basin controlled by the South Florida Water Management District (SFWMD).
 
Recipient: Joe Arriola, City Manager/Chief Administrator   Contact: Pilar Saenz, Assistant Directo  
  3500 Pan American Drive   Contact Phone: (305) 416-1463  
  Miami 33133   Contact email: pilarsb@ci.miami.fl.us
 
Counties: Dade
 
Gov't Entity: Yes Private Organization (Profit/Not for Profit):  
 
Project Description:
The scope of the project consists of the construction of storm sewer improvements in the area bounded by NW 4 Terrace, NW 47 Avenue, NW 7 Street, NW 51 Avenue and the western portion of Antonio Maceo Park. The improvements consists of a new storm sewer gravity conveyance system connected to a water quality structure, pump station and forcemain outfalling to the C-4 Canal via a new outfall including surface restoration. Note: Storm water from this project discharges to the C-4 Canal (Tamiami Canal) which connects to the Biscayne Bay via the Miami River, Biscayne Bay is a SFWMD priority water body).
 
Is this a project related to a federal or state declared disaster? No
 
Measurable Outcome Anticipated:
Mitigation of flood conditions in the regional system that will complement the SFWMD major improvements to the C-4 Canal (basin) which connects to the Biscayne Bay via the Miami River, reduced flood damage insurance claims, and water quality enhancements to the C-4 Canal, Miami River. Biscayne Bayis a SFWMD priority water body.
 
Amount requested from the State for this project this year: $900,000
 
Total cost of the project: $1,350,000
 
Request has been made to fund: Construction
 
What type of match exists for this project? Local
  Cash Amount $450,000  
 
Was this project previously funded by the state?   Yes
  Fiscal Year: 2005-2006 Amount: $250,000
 
Is future-year funding likely to be requested?   Yes
  Amount: $750,000 To Fund: Construction
 
Was this project included in an Agency's Budget Request?   No
 
Was this project included in the Governor's Recommended Budget? No
 
Is there a documented need for this project? Yes
  Documentation: Local Mitigation Strategy (LMS) Plan
 
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)?   Yes
  Hearing Body: Miami Dade County Delegation Meeting
  Hearing Meeting Date: 11/30/2005
 
Is this a water project as described in Section 403.885, Laws of Florida?   Yes
Has the project been submitted to the Department of Environmental Protection? Yes
DEP identifying number: 2005044
Is this project eligible under section 403.885(5) F.S.? Yes
 
Is your project addressed in a state, regional or local plan (such as a SWIM plan, Comprehensive Plan, local master plan, etc.)? Yes
Name the plan and cite the pages on which the project is described:
1)City of Miami Storm Drainage Master Plan (pg 2-1, Fig 2-1, Fig 2-2, Fig 2-3, pg 2-4, Fig 2-4); 2) Miami Comprehensive Neighborhood Plan 1989-2000 (pg 1 & 3 of the Sanitary & Storm Sewers sect), (pg 1 of Coastal Mgmt sect), & (pg 1 & 2 of Natural Resource Conservation sect); 3) City of Miami Capital Improvement Prog 2004-05 & Multi Year Capital Plan; 4) MDC Flood Mgmt Task Force (Sect 5.2-1 & 5.2-2); 5) Local Mitigation Strategy Cert Letter
 
If you are requesting funding for a stormwater or surface water restoration project:
 
Which Water Management District has the jurisdiction of your project?
  South Florida Water Management District (SFWMD)
Have you provided at least 50% match? Yes
  Match Amount: 450000
  Match Source: City of MIA Homeland Defense Neighborhood Impr
 
Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? Yes
  Name of water body: Biscayne Bay
 
Describe how it will reduce loadings, identify anticipated load reductions for total suspended solids, total nitrogen, total phosphorus, and other contaminants, and specify the practices that will be used to reduce loadings:
 
 
If you are requesting funding for a wastewater project:
 
Does your project qualify for funding from DEP's 'Small Community Wastewater Treatment Grant Program' under section 403.1838 F.S.? No
 
Other wastewater projects:
 
Have you received previous legislative funding for this project? No
 
Is the project under construction? No
 
Have you provided at least a 25% local match? No