|
Community Budget Issue Requests - Tracking Id #2653 |
Fairlawn Storm Sewer Pump Station Project, Phase IIA, B-50702 |
|
Requester: |
Mary H. Conway, P.E., Director |
Organization: |
City of Miami |
|
Project Title: |
Fairlawn Storm Sewer Pump Station Project, Phase IIA, B-50702 |
Date Submitted |
1/12/2006 5:44:16 PM |
|
Sponsors: |
Diaz de la Portilla |
|
Statewide Interest: |
This project is regional in schope by controlling the discharge of stormwater in the C-4 drainage basin controlled by the South Florida Water Management District (SFWMD). |
|
Recipient: |
Joe Arriola, City Manager/Chief Administrator |
|
Contact: |
Pilar Saenz, Assistant Directo |
|
|
3500 Pan American Drive |
|
Contact Phone: |
(305) 416-1463 |
|
|
Miami 33133 |
|
Contact email: |
pilarsb@ci.miami.fl.us |
|
Counties: |
Dade |
|
Gov't Entity: |
Yes |
Private Organization (Profit/Not for Profit): |
|
|
Project Description: |
The scope of the project consists of the construction of storm sewer improvements in the area bounded by NW 4 Terrace, NW 47 Avenue, NW 7 Street, NW 51 Avenue and the western portion of Antonio Maceo Park. The improvements consists of a new storm sewer gravity conveyance system connected to a water quality structure, pump station and forcemain outfalling to the C-4 Canal via a new outfall including surface restoration. Note: Storm water from this project discharges to the C-4 Canal (Tamiami Canal) which connects to the Biscayne Bay via the Miami River, Biscayne Bay is a SFWMD priority water body). |
|
Is this a project related to a federal or state declared disaster? |
No |
|
Measurable Outcome Anticipated: |
Mitigation of flood conditions in the regional system that will complement the SFWMD major improvements to the C-4 Canal (basin) which connects to the Biscayne Bay via the Miami River, reduced flood damage insurance claims, and water quality enhancements to the C-4 Canal, Miami River. Biscayne Bayis a SFWMD priority water body. |
|
Amount requested from the State for this project this year: |
$900,000 |
|
Total cost of the project: |
$1,350,000 |
|
Request has been made to fund: |
Construction |
|
What type of match exists for this project? |
Local |
|
Cash Amount |
$450,000 |
|
|
Was this project previously funded by the state? |
|
Yes |
|
Fiscal Year: |
2005-2006 |
Amount: |
$250,000 |
|
Is future-year funding likely to be requested? |
|
Yes |
|
Amount: |
$750,000 |
To Fund: |
Construction |
|
Was this project included in an Agency's Budget Request? |
|
No |
|
Was this project included in the Governor's Recommended Budget? |
No |
|
Is there a documented need for this project? |
Yes |
|
Documentation: |
Local Mitigation Strategy (LMS) Plan |
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
|
Yes |
|
Hearing Body: |
Miami Dade County Delegation Meeting |
|
Hearing Meeting Date: |
11/30/2005 |
|
Is this a water project as described in Section 403.885, Laws of Florida? |
|
Yes |
Has the project been submitted to the Department of Environmental Protection? |
Yes |
DEP identifying number: |
2005044 |
Is this project eligible under section 403.885(5) F.S.? |
Yes |
|
Is your project addressed in a state, regional or local plan (such as a SWIM plan, Comprehensive Plan, local master plan, etc.)? |
Yes |
Name the plan and cite the pages on which the project is described: |
1)City of Miami Storm Drainage Master Plan (pg 2-1, Fig 2-1, Fig 2-2, Fig 2-3, pg 2-4, Fig 2-4); 2) Miami Comprehensive Neighborhood Plan 1989-2000 (pg 1 & 3 of the Sanitary & Storm Sewers sect), (pg 1 of Coastal Mgmt sect), & (pg 1 & 2 of Natural Resource Conservation sect); 3) City of Miami Capital Improvement Prog 2004-05 & Multi Year Capital Plan; 4) MDC Flood Mgmt Task Force (Sect 5.2-1 & 5.2-2); 5) Local Mitigation Strategy Cert Letter |
|
If you are requesting funding for a stormwater or surface water restoration project: |
|
Which Water Management District has the jurisdiction of your project? |
|
South Florida Water Management District (SFWMD) |
Have you provided at least 50% match? |
Yes |
|
Match Amount: |
450000 |
|
Match Source: |
City of MIA Homeland Defense Neighborhood Impr |
|
Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? |
Yes |
|
Name of water body: |
Biscayne Bay |
|
Describe how it will reduce loadings, identify anticipated load reductions for total suspended solids, total nitrogen, total phosphorus, and other contaminants, and specify the practices that will be used to reduce loadings: |
|
|
If you are requesting funding for a wastewater project: |
|
Does your project qualify for funding from DEP's 'Small Community Wastewater Treatment Grant Program' under section 403.1838 F.S.? |
No |
|
Other wastewater projects: |
|
Have you received previous legislative funding for this project? |
No |
|
Is the project under construction? |
No |
|
Have you provided at least a 25% local match? |
No |