Skip to Navigation | Skip to Main Content | Skip to Site Map

MyFloridaHouse.gov | Mobile Site

Senate Tracker: Sign Up | Login

The Florida Senate

Senate Committee Publications

CBIRS Request 816
 
Community Budget Issue Requests - Tracking Id #816
Highland Village Stormwater Improvements
 
Requester: Gary Brown-City Manager Organization: City of North Miami Beach
 
Project Title: Highland Village Stormwater Improvements Date Submitted 1/6/2006 5:37:27 PM
 
Sponsors: Margolis
 
Statewide Interest:
This project will decrease containment loading from urban stormwater runoff and prevent further pollution of the Biscayne Bay Aquatic Preserve, and satisfy the South Florida Water Management District's SWIM Plan for Biscayne Bay that includes, maintaining and improving water quality to protect and restore natural ecosystems and compatible human uses of Biscayne Bay
 
Recipient: CIty of North Miami Beach   Contact: Gary Brown  
  17011 NE 19th Ave.   Contact Phone: (305) 948-2900  
  North Miami Beach 33162   Contact email: gary.brown@citynmb.com
 
Counties: Dade
 
Gov't Entity: Yes Private Organization (Profit/Not for Profit):  
 
Project Description:
Highland Village is a residential mobile home park in the City of North Miami beach and is adjacent to the Biscayne Bay Aquatic Preserve and the Oleta River State Recreation Area. Highland Village is a low-income neighborhoos located between NE 20th Ave-NE 25th Ave. and NE 135th Ter.-NE 137th St. In 1999, the City employed an outside engineeringconsultant to prepare a Water Quality Evaluation Study (Study)to asses the problem at Highland Village. The study included a specific water-sampling scheme whereby water samples were collected from teh underlying aquifer and adjacent surface waters. The result was expected: surface water quality standards were exceeded at all sampling locations. Total fecal coliform bacteria counts were highest at stormwater outfall locations that discharge into Arch Creek and the adjacent Oleta River State Rec. Area. In order to solve the problem, the construction of a new wastewater collection system and the cleaning and abandonment of the existing septic systems currently used tohandle wastewater will be neccesary. The new wastewater collection system will prevent further contamination of the area sediments, groundwater and surface bodies by eliminating the septic systems, one of the sources of contaminants.
 
Is this a project related to a federal or state declared disaster? No
 
Measurable Outcome Anticipated:
Decrease contaminant loading from urban stormwater runoff; and, lower fecal coliform bacteria counts within the surrounding surface waters to within surface quality limits(1000/100ml); and, prevent further pollution of the Biscayne Bay Aquatic Preserve, and to satisfy the SFWMD SWIM Plan for Biscayne Bay.
 
Amount requested from the State for this project this year: $1,000,000
 
Total cost of the project: $9,808,050
 
Request has been made to fund: Construction
 
What type of match exists for this project? Federal
  Cash Amount $8,808,050  
 
Was this project previously funded by the state?   Yes
  Fiscal Year: 2005-06 Amount: $450,000
 
Is future-year funding likely to be requested?   No
 
Was this project included in an Agency's Budget Request?   No
 
Was this project included in the Governor's Recommended Budget? No
 
Is there a documented need for this project? Yes
  Documentation: Miami Dade County Local Mitigation Plan-Project 12, page 128 and the Biscayne Bay SWIM Plan
 
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)?   Yes
  Hearing Body: Miami Dade LEgislative Delegation
  Hearing Meeting Date: 11/30/2005
 
Is this a water project as described in Section 403.885, Laws of Florida?   Yes
Has the project been submitted to the Department of Environmental Protection? Yes
DEP identifying number: WW20032020
Is this project eligible under section 403.885(5) F.S.? Yes
 
Is your project addressed in a state, regional or local plan (such as a SWIM plan, Comprehensive Plan, local master plan, etc.)? Yes
Name the plan and cite the pages on which the project is described:
local mitigation plan 2005 and the Biscayne Bay SWIM Plan
 
If you are requesting funding for a stormwater or surface water restoration project:
 
Which Water Management District has the jurisdiction of your project?
  SFWMD
Have you provided at least 50% match? Yes
  Match Amount: 8808050
  Match Source: EPA, Miami Dade CDBG, City of North Miami Beach ( sewer fund and Proud neighborhood funds)
 
Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? Yes
  Name of water body: Biscayne Bay
 
Describe how it will reduce loadings, identify anticipated load reductions for total suspended solids, total nitrogen, total phosphorus, and other contaminants, and specify the practices that will be used to reduce loadings:
 
 
If you are requesting funding for a wastewater project:
 
Does your project qualify for funding from DEP's 'Small Community Wastewater Treatment Grant Program' under section 403.1838 F.S.? No
 
Other wastewater projects:
 
Have you received previous legislative funding for this project? No
 
Is the project under construction? No
 
Have you provided at least a 25% local match? No