Community Budget Issue Requests - Tracking Id #1255 |
Earman River Water Pipe Line Replacement |
|
Requester: |
Jimmy Knight, Village Manager |
Organization: |
Village of North Palm Beach |
|
Project Title: |
Earman River Water Pipe Line Replacement |
Date Submitted |
1/3/2008 2:47:04 PM |
|
Sponsors: |
Atwater |
|
Statewide Interest: |
The project will improve the conservation of water throughout the Village of North Palm Beach and the efficient use of water from the Earman River. |
|
Recipient: |
Village of North Palm Beach |
|
Contact: |
Charles Huff |
|
|
501 U.S. Highway 1 |
|
Contact Phone: |
(561) 348-0697 |
|
|
North Palm Beach 33408 |
|
Contact email: |
chuff@village-npb.org |
|
Counties: |
Palm Beach |
|
Gov't Entity: |
Yes |
Private Organization (Profit/Not for Profit): |
|
|
Project Description: |
The current water supply pipe line from the Earman River to the Village�s retention pond has numerous leaks from the failure of its joints. The Village�s engineering consultants have determined that the complete failure of this water supply line is imminent. As a result of the consultants� review, the Village will abandon the existing pipe line and replace it by the process of directional boring. The project will also include the installation of a one-piece pipe line. |
|
Is this a project related to a federal or state declared disaster? |
No |
|
Measurable Outcome Anticipated: |
This project will allow the Village to avoid the complete failure of the current pipe line which would result in the lose of a water supply from the Earman River. Losing this source of water would result in damage to Village-owned properties. By utilizing directional boring, one continuous piece of pipe will be used. This one-piece pipe will greatly reducing the possibility of future leaks and their associated repair costs. This project will improve the efficiency of water use in the Village, and continue this community�s efforts in water conservation and adherence to ongoing water restrictions. |
|
Amount requested from the State for this project this year: |
$85,000 |
|
Total cost of the project: |
$170,000 |
|
Request has been made to fund: |
Construction |
|
What type of match exists for this project? |
Local |
|
Cash Amount |
$ |
|
|
Was this project previously funded by the state? |
|
No |
|
Is future-year funding likely to be requested? |
|
No |
|
Was this project included in an Agency's Budget Request? |
|
No |
|
Was this project included in the Governor's Recommended Budget? |
No |
|
Is there a documented need for this project? |
Yes |
|
Documentation: |
Capital Improvement Program |
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
|
Yes |
|
Hearing Body: |
Village of North Palm Beach Council Meeting |
|
Is this a water project as described in Section 403.885, Laws of Florida? |
|
No |