Skip to Navigation | Skip to Main Content | Skip to Site Map

MyFloridaHouse.gov | Mobile Site

Senate Tracker: Sign Up | Login

The Florida Senate

Senate Committee Publications

CBIRS Request 1299
 
Community Budget Issue Requests - Tracking Id #1299
Boca Raton Utility Services In-Plant Reclamation Capacity Expansion
 
Requester: George S. Brown, Deputy City Manager Organization: City of Boca Raton
 
Project Title: Boca Raton Utility Services In-Plant Reclamation Capacity Expansion Date Submitted 1/3/2008 3:03:23 PM
 
Sponsors: Atwater
 
Statewide Interest:
Reduces the demand on the regional water supply through the increased production capacity of irrigation quality reclaimed water ensuring the drinking water supply is conserved and protected
 
Recipient: City of Boca Raton   Contact: George S. Brown  
  201 West Palmetto Park Road   Contact Phone: (561) 393-7703  
  Boca Raton 33432   Contact email: gbrown@myboca.us
 
Counties: Palm Beach
 
Gov't Entity: Yes Private Organization (Profit/Not for Profit):  
 
Project Description:
This project provides for the additional 5.0 MG production capacity of the City of Boca Raton�s irrigation quality reclaimed water system. In realizing the need to offset demands on the regional water supply and system, the City began project IRIS (In-City Reclamation Irrigation System) in early 1990. Due to population growth in South Florida and recent drought events, both the need and demand for irrigation quality reclaimed water has increased dramatically. In order to meet the increased needs and demands for irrigation quality reclaimed water, the City must increase their production capacity. This project will result in the 5.0 MG expansion and construction of the current on-site 10.0 MGD irrigation quality reclaimed water production capacity facility to a 15.0 MGD irrigation quality reclaimed water production capacity facility. The expansion of the current irrigation quality reclaimed water production capacity to 15 million gallons a day will result in the use of 100% of available effluent for irrigation quality reclaimed water thus ultimately providing an offset of demand on the regional water system.
 
Is this a project related to a federal or state declared disaster? No
 
Measurable Outcome Anticipated:
Reduction of demand on potable regional water supply through the replacement of existing regional water supply irrigation wells and potable water irrigation systems with irrigation quality reclaimed water.
 
Amount requested from the State for this project this year: $2,175,000
 
Total cost of the project: $2,900,000
 
Request has been made to fund: Construction
 
What type of match exists for this project? Local
  Cash Amount $725,000  
 
Was this project previously funded by the state?   No
 
Is future-year funding likely to be requested?   Yes
  Amount: $1,505,000 To Fund: Construction
 
Was this project included in an Agency's Budget Request?   No
 
Was this project included in the Governor's Recommended Budget? No
 
Is there a documented need for this project? Yes
  Documentation: SFWMD Lower East Coast Plan and FDEP WWTF Permit
 
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)?   Yes
  Hearing Body: City of Boca Raton City Council
 
Is this a water project as described in Section 403.885, Laws of Florida?   Yes
Is the project eligible under section 403.885(2),F.S. to protect public health or the environment; and implement plans developed pursuant to the Surface Water Improvement and Management Act created in part IV of Chapter 373,F.S., other water restoration plans required by law, management plans prepared pursuant to 2.403.067,F.S., or other plans adopted by local government for water quality improvement and water restoration? No
Is your project addressed in a state, regional or local plan (such as a SWIM Plan, Comprehensive Plan, Local Master Plan, etc.)? Yes
Name the plan and cite the pages on which the project is described:
City of Boca Raton FY 2006-2007 thru FY 2011-2012 Capital Improvement Program Project # 470018 (page 164)
 
Are requesting funding for a stormwater, surface water restoration, or other water management project?
No
 
Are you requesting funding for a wastewater project? Yes
 
Does your project qualify for funding from DEP's 'Small Community Wastewater Treatment Grant Program' under section 403.1838 F.S.? No
 
Have you received or applied for funding for this project from DEP's State Revolving Fund (SRF) program under section 403.1835,F.S.? No
Is the project under construction? No
Have you provided at least 25% match (that is, one-quarter of the total project cost identified in this request? Yes
  Match Amount: 725000
  Match Source: City of Boca Raton CIP Funds
 
Are you requesting funding for a drinking water project? No