Community Budget Issue Requests - Tracking Id #1840 |
Engineering for Drainage Improvements to Shadow Bay Drive, East Bay Discharge Basin |
|
Requester: |
Judy S. Whitis |
Organization: |
City of Callaway |
|
Project Title: |
Engineering for Drainage Improvements to Shadow Bay Drive, East Bay Discharge Basin |
Date Submitted |
1/4/2008 10:07:50 AM |
|
Sponsors: |
Gaetz |
|
Statewide Interest: |
To protect the head waters of Callaway Bayou and East Bay - impact will prevent erosion of Shadow Bay subdivision into Callaway Bayou while addressing the health and welfare of many Callaway citizens. |
|
Recipient: |
City of Callaway |
|
Contact: |
Sandy Hirth |
|
|
6601 East Highway 22 |
|
Contact Phone: |
(850) 871-6000 |
|
|
Callaway 32404 |
|
Contact email: |
shirth@cityofcallaway.com |
|
Counties: |
Bay |
|
Gov't Entity: |
Yes |
Private Organization (Profit/Not for Profit): |
|
|
Project Description: |
Improve the stormwater collection and conveyance facilities along a portion of Shadow Bay Drive by the installation of curb and gutter, inlets, and piping and improvements to the concrete swale. Includes civil engineering services for design of the drainage system and evaluation and reconstruction of the roadway as needed. |
|
Is this a project related to a federal or state declared disaster? |
No |
|
Measurable Outcome Anticipated: |
Engineered plans to assist funding requests for drainage improvements. |
|
Amount requested from the State for this project this year: |
$43,100 |
|
Total cost of the project: |
$43,100 |
|
Request has been made to fund: |
Operations |
|
What type of match exists for this project? |
None |
|
Cash Amount |
$ |
|
|
Was this project previously funded by the state? |
|
No |
|
Is future-year funding likely to be requested? |
|
Yes |
|
Amount: |
$400,000 |
To Fund: |
Operations |
|
Was this project included in an Agency's Budget Request? |
|
No |
|
Was this project included in the Governor's Recommended Budget? |
No |
|
Is there a documented need for this project? |
Yes |
|
Documentation: |
Stormwater Assessment for NPDES |
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
|
No |
|
Is this a water project as described in Section 403.885, Laws of Florida? |
|
Yes |
Is the project eligible under section 403.885(2),F.S. to protect public health or the environment; and implement plans developed pursuant to the Surface Water Improvement and Management Act created in part IV of Chapter 373,F.S., other water restoration plans required by law, management plans prepared pursuant to 2.403.067,F.S., or other plans adopted by local government for water quality improvement and water restoration? |
Yes |
Is your project addressed in a state, regional or local plan (such as a SWIM Plan, Comprehensive Plan, Local Master Plan, etc.)? |
No |
|
Are requesting funding for a stormwater, surface water restoration, or other water management project? |
Yes |
|
In which Water Management District is your project located? |
|
Northwest Florida Water Management District |
Have you provided at least 50% match (that is, one-half the total project cost identified in this request? |
No |
|
Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? |
Yes |
|
Name of water body: |
Callaway Bayou |
|
Describe, specifically, how it will reduce loadings, identify anticipated load reductions for total suspended solids, total nitrogen, total phosphorus, and other contaminants, and specify the practices that will be used to reduce loadings: |
To prevent sand from draining into the bayou. |
Is the project under construction? |
No |
|
Are you requesting funding for a wastewater project? |
No |
|
Are you requesting funding for a drinking water project? |
No |