Skip to Navigation | Skip to Main Content | Skip to Site Map

MyFloridaHouse.gov | Mobile Site

Senate Tracker: Sign Up | Login

The Florida Senate

Senate Committee Publications

CBIRS Request 1840
 
Community Budget Issue Requests - Tracking Id #1840
Engineering for Drainage Improvements to Shadow Bay Drive, East Bay Discharge Basin
 
Requester: Judy S. Whitis Organization: City of Callaway
 
Project Title: Engineering for Drainage Improvements to Shadow Bay Drive, East Bay Discharge Basin Date Submitted 1/4/2008 10:07:50 AM
 
Sponsors: Gaetz
 
Statewide Interest:
To protect the head waters of Callaway Bayou and East Bay - impact will prevent erosion of Shadow Bay subdivision into Callaway Bayou while addressing the health and welfare of many Callaway citizens.
 
Recipient: City of Callaway   Contact: Sandy Hirth  
  6601 East Highway 22   Contact Phone: (850) 871-6000  
  Callaway 32404   Contact email: shirth@cityofcallaway.com
 
Counties: Bay
 
Gov't Entity: Yes Private Organization (Profit/Not for Profit):  
 
Project Description:
Improve the stormwater collection and conveyance facilities along a portion of Shadow Bay Drive by the installation of curb and gutter, inlets, and piping and improvements to the concrete swale. Includes civil engineering services for design of the drainage system and evaluation and reconstruction of the roadway as needed.
 
Is this a project related to a federal or state declared disaster? No
 
Measurable Outcome Anticipated:
Engineered plans to assist funding requests for drainage improvements.
 
Amount requested from the State for this project this year: $43,100
 
Total cost of the project: $43,100
 
Request has been made to fund: Operations
 
What type of match exists for this project? None
  Cash Amount $  
 
Was this project previously funded by the state?   No
 
Is future-year funding likely to be requested?   Yes
  Amount: $400,000 To Fund: Operations
 
Was this project included in an Agency's Budget Request?   No
 
Was this project included in the Governor's Recommended Budget? No
 
Is there a documented need for this project? Yes
  Documentation: Stormwater Assessment for NPDES
 
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)?   No
 
Is this a water project as described in Section 403.885, Laws of Florida?   Yes
Is the project eligible under section 403.885(2),F.S. to protect public health or the environment; and implement plans developed pursuant to the Surface Water Improvement and Management Act created in part IV of Chapter 373,F.S., other water restoration plans required by law, management plans prepared pursuant to 2.403.067,F.S., or other plans adopted by local government for water quality improvement and water restoration? Yes
Is your project addressed in a state, regional or local plan (such as a SWIM Plan, Comprehensive Plan, Local Master Plan, etc.)? No
 
Are requesting funding for a stormwater, surface water restoration, or other water management project?
Yes
 
In which Water Management District is your project located?
  Northwest Florida Water Management District
Have you provided at least 50% match (that is, one-half the total project cost identified in this request? No
 
Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? Yes
  Name of water body: Callaway Bayou
 
Describe, specifically, how it will reduce loadings, identify anticipated load reductions for total suspended solids, total nitrogen, total phosphorus, and other contaminants, and specify the practices that will be used to reduce loadings:
To prevent sand from draining into the bayou.
Is the project under construction? No
 
Are you requesting funding for a wastewater project? No
 
Are you requesting funding for a drinking water project? No