Skip to Navigation | Skip to Main Content | Skip to Site Map

MyFloridaHouse.gov | Mobile Site

Senate Tracker: Sign Up | Login

The Florida Senate

Senate Committee Publications

CBIRS Request 2257
 
Community Budget Issue Requests - Tracking Id #2257
Vineland Road/Cheryl Drive Drainage Improvements
 
Requester: Richard M. Howard, PE Organization: City of Orlando
 
Project Title: Vineland Road/Cheryl Drive Drainage Improvements Date Submitted 1/4/2008 3:57:16 PM
 
Sponsors: Constantine
 
Statewide Interest:
Reduction of the potential for septic tank damage/discharge to the upper Kissimmee River
 
Recipient: City of Orlando Public Works Dept.   Contact: Richard M. Howard  
  PO Box 4990   Contact Phone: (407) 246-3222  
  Orlando 32802   Contact email: rhoward@cityoforlando.net
 
Counties: Orange
 
Gov't Entity: Yes Private Organization (Profit/Not for Profit):  
 
Project Description:
Arterial roadways were constructed on the periphery of Universal Studios Florida as part of that development during the late 1980s and early 1990s. Due to the complicated nature of the drainage system in this area and hydrolic changes that resulted due to development, severe flooding has been severe enough to cause accidents, damage to private property, and injuries. As the receiving water, Lake Cane, is surrounded by residential development served by septic systems, correction of the uncontrolled flooding is particularly important to Shingle Creek and the rest of the Upper Kissimmee River basin. The request will enable the City to fully evaluate the problem and recommend solutions that will solve the problem permanently. Part of the design expenditure will enable the City to procure survey services for the purpose of determining how the existing system is configured. This will allow the City to properly analyze and re-design the system. Correction of the problems in this area will protect Lake Cane and other downstream water bodies that could be impacted by septic system overflows, and will ensure that the arterial roadways function in a manner that promotes the movement of traffic in a safe manner, without the potential for injuries, roadway deterioration or vehicular damage.
 
Is this a project related to a federal or state declared disaster? No
 
Measurable Outcome Anticipated:
Improvement of function of arterial roadways, prevention of septic tank overflows, elimination of flood damage.
 
Amount requested from the State for this project this year: $475,000
 
Total cost of the project: $475,000
 
Request has been made to fund: Construction
 
What type of match exists for this project? Local
  Cash Amount $475,000  
 
Was this project previously funded by the state?   No
 
Is future-year funding likely to be requested?   No
 
Was this project included in an Agency's Budget Request?   No
 
Was this project included in the Governor's Recommended Budget? No
 
Is there a documented need for this project? Yes
  Documentation: PW CIP needs assessment
 
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)?   Yes
  Hearing Body: City Council
 
Is this a water project as described in Section 403.885, Laws of Florida?   No