Skip to Navigation | Skip to Main Content | Skip to Site Map

MyFloridaHouse.gov | Mobile Site

Senate Tracker: Sign Up | Login

The Florida Senate

Senate Committee Publications

CBIRS Request 47
 
Community Budget Issue Requests - Tracking Id #47
Southwest Lehigh Structures PD&E
 
Requester: David Lindsay Organization: East County Water Control District
 
Project Title: Southwest Lehigh Structures PD&E Date Submitted 1/4/2008 6:38:58 AM
 
Sponsors: Aronberg
 
Statewide Interest:
What statewide interest does this project address as it relates to Chapter 216.052(1)? This is a planning, design and evaluation to relieve flows on the Orange River, store massive amounts of stormwater, and provide water quality treatment in Lehigh Acres and Southwest Florida.
 
Recipient: East County Water Control District   Contact: David Lindsay  
  601 East County Lane   Contact Phone: (239) 368-0044  
  Lehigh Acres 33936   Contact email: DLindsay@ecwcd.com
 
Counties: Lee
 
Gov't Entity: Yes Private Organization (Profit/Not for Profit):  
 
Project Description:
The East County Water Control District wishes to conduct a plan, evaluate design of a water control structure (weirs) system in southwest Lehigh by fiscal year 2008. This project will store massive amounts of stormwater, provide for water quality treatment and relieve flows on the Orange River. We are asking for turn-dirt, construction dollars to complete this project.
 
Is this a project related to a federal or state declared disaster? No
 
Measurable Outcome Anticipated:
PD&E substantial increases in stormwater collection, water quality treatment and relived flows on the Orange River.
 
Amount requested from the State for this project this year: $150,000
 
Total cost of the project: $225,000
 
Request has been made to fund: Construction
 
What type of match exists for this project? Local
  Cash Amount $75,000  
 
Was this project previously funded by the state?   Yes
  Fiscal Year: 2006 Amount: $25,000
 
Is future-year funding likely to be requested?   No
 
Was this project included in an Agency's Budget Request?   No
 
Was this project included in the Governor's Recommended Budget? No
 
Is there a documented need for this project? Yes
  Documentation: Southwest Lehigh Study-Quattrone & Associates
 
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)?   Yes
  Hearing Body: Lee County Delegation
 
Is this a water project as described in Section 403.885, Laws of Florida?   Yes
Is the project eligible under section 403.885(2),F.S. to protect public health or the environment; and implement plans developed pursuant to the Surface Water Improvement and Management Act created in part IV of Chapter 373,F.S., other water restoration plans required by law, management plans prepared pursuant to 2.403.067,F.S., or other plans adopted by local government for water quality improvement and water restoration? Yes
Is your project addressed in a state, regional or local plan (such as a SWIM Plan, Comprehensive Plan, Local Master Plan, etc.)? Yes
Name the plan and cite the pages on which the project is described:
Caloosahatchee River Watershed Initiative Modeling Study
 
Are requesting funding for a stormwater, surface water restoration, or other water management project?
Yes
 
In which Water Management District is your project located?
  South Florida Water Management District
Have you provided at least 50% match (that is, one-half the total project cost identified in this request? Yes
  Match Amount: 75000
  Match Source: Assessments
 
Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? Yes
  Name of water body: Caloosahatchee River
 
Describe, specifically, how it will reduce loadings, identify anticipated load reductions for total suspended solids, total nitrogen, total phosphorus, and other contaminants, and specify the practices that will be used to reduce loadings:
This regional project will raise water levels over nine square miles that will reduce nutrient levels, suspended solids and peak flows prior to discharge to the Caloosahatchee River.____
Is the project under construction? No
 
Are you requesting funding for a wastewater project? No
 
Are you requesting funding for a drinking water project? No