Quick Links
- General Laws Conversion Table (2024) [PDF]
- Florida Statutes Definitions Index (2024) [PDF]
- Table of Section Changes (2024) [PDF]
- Preface to the Florida Statutes (2024) [PDF]
- Table Tracing Session Laws to Florida Statutes (2024) [PDF]
- Index to Special and Local Laws (1971-2024) [PDF]
- Index to Special and Local Laws (1845-1970) [PDF]
- Statute Search Tips
2016 Florida Statutes
SECTION 285
Enhanced Bridge Program for Sustainable Transportation.
Enhanced Bridge Program for Sustainable Transportation.
339.285 Enhanced Bridge Program for Sustainable Transportation.—
(1) There is created within the Department of Transportation the Enhanced Bridge Program for Sustainable Transportation for the purpose of providing funds to improve the sufficiency rating of local bridges and to improve congested roads on the State Highway System or local corridors on which high-cost bridges are located in order to improve a corridor or provide an alternative corridor.
(2) Matching funds provided from the program may fund up to 50 percent of project costs.
(3) The department shall allocate a minimum of 25 percent of funding available for the program for local bridge projects to replace, rehabilitate, paint, or install scour countermeasures to highway bridges located on public roads, other than those on the State Highway System. A project to be funded must, at a minimum:
(a) Be classified as a structurally deficient bridge having a poor condition rating for the deck, superstructure, substructure component, or culvert;
(b) Have a sufficiency rating of 35 or below; and
(c) Have average daily traffic of at least 500 vehicles.
(4) Special consideration shall be given to bridges that are closed to all traffic or that have a load restriction of less than 10 tons.
(5) The department shall allocate remaining funding available for the program to improve highly congested roads on the State Highway System or local corridors on which high-cost bridges are located in order to improve the corridor or provide an alternative corridor. A project to be funded must, at a minimum:
(a) Be on or provide direct relief to an existing corridor that is backlogged or constrained; and
(b) Be a major bridge having an estimated cost greater than $25 million.
History.—s. 43, ch. 2007-196; s. 90, ch. 2012-174.