Skip to Navigation | Skip to Main Content | Skip to Site Map

MyFloridaHouse.gov | Mobile Site

Senate Tracker: Sign Up | Login

The Florida Senate

SB 2644: Electric Transmission Lines/Construction [EPSC]

GENERAL BILL by Siplin

Electric Transmission Lines/Construction [EPSC]; Removes exceptions to requirements for an electric utility to obtain certification prior to construction of a transmission line. Requires an electric utility to notify affected municipalities of proposed transmission line sites and routes. Authorizes a municipality to request a hearing by the PSC to determine disputes with the electric utility. Authorizes a municipality to bring an action challenging transmission line siting, etc.

Effective Date: Upon becoming law
Last Action: 5/2/2009 Senate - Indefinitely postponed and withdrawn from consideration; Died in Committee on Communications, Energy, and Public Utilities
Bill Text: Web Page | PDF



Bill History

Date Chamber Action
3/2/2009 Senate • Filed
3/12/2009 Senate • Referred to Communications, Energy, and Public Utilities; Community Affairs; Environmental Preservation and Conservation; General Government Appropriations -SJ 00211
3/19/2009 Senate • Introduced -SJ 00211
5/2/2009 Senate • Indefinitely postponed and withdrawn from consideration; Died in Committee on Communications, Energy, and Public Utilities