SB 2644: Electric Transmission Lines/Construction [EPSC]
GENERAL BILL by Siplin
Electric Transmission Lines/Construction [EPSC]; Removes exceptions to requirements for an electric utility to obtain certification prior to construction of a transmission line. Requires an electric utility to notify affected municipalities of proposed transmission line sites and routes. Authorizes a municipality to request a hearing by the PSC to determine disputes with the electric utility. Authorizes a municipality to bring an action challenging transmission line siting, etc.
Last Action: 5/2/2009 Senate - Indefinitely postponed and withdrawn from consideration; Died in Committee on Communications, Energy, and Public Utilities
Bill Text: Web Page | PDF
-
Bill History
Date Chamber Action 3/2/2009 Senate • Filed
3/12/2009 Senate • Referred to Communications, Energy, and Public Utilities; Community Affairs; Environmental Preservation and Conservation; General Government Appropriations -SJ 00211
3/19/2009 Senate • Introduced -SJ 00211
5/2/2009 Senate • Indefinitely postponed and withdrawn from consideration; Died in Committee on Communications, Energy, and Public Utilities
-
SB 2644, Original Filed Version (Current Bill Version) Posted 3/2/2009 at 1:38 PM
Bill Text: Web Page | PDF Analyses: None Related Bills (1)
Bill Number Subject Filed By Relationship Last Action and Location H 1315 Construction of Electric Transmission Lines Brisé Identical Last Action: 5/2/2009 H Indefinitely postponed and withdrawn from consideration; Died in Committee on Energy & Utilities Policy (GGPC)
Location:Citations - Statutes (1)
Citation Catchline Location in Bill Location In Bill Help 403.524 Applicability; certification; exemptions.