|
Community Budget Issue Requests - Tracking Id #2141 |
Sunset Drive Drainage Improvement (City of South Miami) |
|
Requester: |
Maria V. Davis |
Organization: |
City of South Miami |
|
Project Title: |
Sunset Drive Drainage Improvement (City of South Miami) |
Date Submitted |
1/12/2006 12:39:21 PM |
|
Sponsors: |
Diaz de la Portilla |
|
Statewide Interest: |
Safety and welfare of all residents, by preventing flooding problems. |
|
Recipient: |
City of South Miami |
|
Contact: |
W. Ajibola Balogun |
|
|
6130 Sunset Drive |
|
Contact Phone: |
(305) 663-6350 |
|
|
South Miami 33143 |
|
Contact email: |
abalogun@cityofsouthmiami.net |
|
Counties: |
Dade |
|
Gov't Entity: |
Yes |
Private Organization (Profit/Not for Profit): |
|
|
Project Description: |
Surveying, engineering design and construction of much needed drainage improvement along Sunset Drive from US-1 to SW 62 Avenue. |
|
Is this a project related to a federal or state declared disaster? |
No |
|
Measurable Outcome Anticipated: |
To prevent flooding and reduce pollution in secondary canal system in Miami-Dade. |
|
Amount requested from the State for this project this year: |
$1,100,000 |
|
Total cost of the project: |
$1,100,000 |
|
Request has been made to fund: |
Construction |
|
What type of match exists for this project? |
Local |
|
Cash Amount |
$550,000 |
|
|
Was this project previously funded by the state? |
|
No |
|
Is future-year funding likely to be requested? |
|
No |
|
Was this project included in an Agency's Budget Request? |
|
No |
|
Was this project included in the Governor's Recommended Budget? |
No |
|
Is there a documented need for this project? |
Yes |
|
Documentation: |
Study "Charrette II" |
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
|
Yes |
|
Hearing Body: |
City of South Miami City Commission |
|
Hearing Meeting Date: |
12/20/2005 |
|
Is this a water project as described in Section 403.885, Laws of Florida? |
|
Yes |
Has the project been submitted to the Department of Environmental Protection? |
Yes |
DEP identifying number: |
sw20022039 |
Is this project eligible under section 403.885(5) F.S.? |
Yes |
|
Is your project addressed in a state, regional or local plan (such as a SWIM plan, Comprehensive Plan, local master plan, etc.)? |
Yes |
Name the plan and cite the pages on which the project is described: |
Capital Improvement Plan |
|
If you are requesting funding for a stormwater or surface water restoration project: |
|
Which Water Management District has the jurisdiction of your project? |
|
South Florida Water Management District |
Have you provided at least 50% match? |
Yes |
|
Match Amount: |
550000 |
|
Match Source: |
Local |
|
Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? |
Yes |
|
Name of water body: |
Biscayne Bay |
|
Describe how it will reduce loadings, identify anticipated load reductions for total suspended solids, total nitrogen, total phosphorus, and other contaminants, and specify the practices that will be used to reduce loadings: |
|
|
If you are requesting funding for a wastewater project: |
|
Does your project qualify for funding from DEP's 'Small Community Wastewater Treatment Grant Program' under section 403.1838 F.S.? |
No |
|
Other wastewater projects: |
|
Have you received previous legislative funding for this project? |
No |
|
Is the project under construction? |
No |
|
Have you provided at least a 25% local match? |
No |