|
Community Budget Issue Requests - Tracking Id #2656 |
Flagami/West End Storm Sewers Improvement Project, Phase II, B-50695 |
|
Requester: |
Mary H. Conway, P.E., Director |
Organization: |
City of Miami |
|
Project Title: |
Flagami/West End Storm Sewers Improvement Project, Phase II, B-50695 |
Date Submitted |
1/12/2006 5:44:34 PM |
|
Sponsors: |
Diaz de la Portilla |
|
Statewide Interest: |
This project is regional in scope by controlling the discharge of stormwater in the C-4 drainage basin controlled by the South Florida Water Management District (SFWMD) |
|
Recipient: |
Joe Arrioloa, City Manager/Chief Administrator |
|
Contact: |
Pilar Saenz, Assistant Directo |
|
|
3500 Pan American Drive |
|
Contact Phone: |
(305) 416-1463 |
|
|
Miami 33133 |
|
Contact email: |
pilarsb@ci.miami.fl.us |
|
Counties: |
Dade |
|
Gov't Entity: |
Yes |
Private Organization (Profit/Not for Profit): |
|
|
Project Description: |
The scope of the project consists of the construction of storm sewer improvements in the area approximately bounded by N.W./S.W. 62 Avenue, N.W./S.W. 69 Avenue, S.W. 8 Street, and Tamiami Canal Road. The improvements consists of exfiltration trench (french drain), manholes, catch basins, storm sewer pipe for gravity conveyance, cross drains, new outfalls, retrofit of existing outfalls, and surface restoration. Note: Storm water from this project discharges to the C-4 Canal (Tamiami Canal) which connects to the Biscayne Bay via the Miami River. Biscayne Bay is a SFWMD priority water body. |
|
Is this a project related to a federal or state declared disaster? |
No |
|
Measurable Outcome Anticipated: |
Mitigation of flood conditions in the regional system that will complement the SFWMD major improvements to the C-4 Canal, Miami River, and Biscayne Bay. |
|
Amount requested from the State for this project this year: |
$1,300,000 |
|
Total cost of the project: |
$1,950,000 |
|
Request has been made to fund: |
Construction |
|
What type of match exists for this project? |
Local, Federal |
|
Cash Amount |
$650,000 |
|
|
Was this project previously funded by the state? |
|
Yes |
|
Fiscal Year: |
2005-2006 |
Amount: |
$500,000 |
|
Is future-year funding likely to be requested? |
|
Yes |
|
Amount: |
$1,500,000 |
To Fund: |
Construction |
|
Was this project included in an Agency's Budget Request? |
|
No |
|
Was this project included in the Governor's Recommended Budget? |
No |
|
Is there a documented need for this project? |
Yes |
|
Documentation: |
Local Mitigation Strategy (LMS) Plan |
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
|
Yes |
|
Hearing Body: |
Miami-Dade County Delegation Meeting |
|
Hearing Meeting Date: |
12/31/2004 |
|
Is this a water project as described in Section 403.885, Laws of Florida? |
|
Yes |
Has the project been submitted to the Department of Environmental Protection? |
Yes |
DEP identifying number: |
2005045 |
Is this project eligible under section 403.885(5) F.S.? |
Yes |
|
Is your project addressed in a state, regional or local plan (such as a SWIM plan, Comprehensive Plan, local master plan, etc.)? |
Yes |
Name the plan and cite the pages on which the project is described: |
City of Miami Storm Drainage Master Plan (Pg. 2-1, Fig.-1, Fig. 2-2, Fig. 2-3, Pg. 2-4, Fig. 2-4); Miami Comprehensive Neighborhood Plan 1989-2000 (Pgs. 1 & 3, Sanitary and Storm Sewers sect.), (Pg. 1, Coastal Mgmt. sect.), (Pgs. 1 & 2, Natural Resource Conservation sect.); City of Miami Capital Impmt. Program 2004-05 & Multi Year Capital Plan; Miami-Dade Cty. Flood Mgmt. Task Force (sect. 5.2-1, 5.2-2); Local Mitigation Strategy Certification |
|
If you are requesting funding for a stormwater or surface water restoration project: |
|
Which Water Management District has the jurisdiction of your project? |
|
South Florida Water Mangement District |
Have you provided at least 50% match? |
Yes |
|
Match Amount: |
650000 |
|
Match Source: |
Stormwater Utility Trust Fund, Transit 1/2 Cent Surtax |
|
Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? |
Yes |
|
Name of water body: |
Biscayne Bay |
|
Describe how it will reduce loadings, identify anticipated load reductions for total suspended solids, total nitrogen, total phosphorus, and other contaminants, and specify the practices that will be used to reduce loadings: |
|
|
If you are requesting funding for a wastewater project: |
|
Does your project qualify for funding from DEP's 'Small Community Wastewater Treatment Grant Program' under section 403.1838 F.S.? |
No |
|
Other wastewater projects: |
|
Have you received previous legislative funding for this project? |
No |
|
Is the project under construction? |
No |
|
Have you provided at least a 25% local match? |
No |