Community Budget Issue Requests - Tracking Id #3003 |
Stormwater Drainage Improvements |
|
Requester: |
Alex Rey, Town Manager |
Organization: |
Town of Miami Lakes |
|
Project Title: |
Stormwater Drainage Improvements |
Date Submitted |
1/13/2006 12:54:49 PM |
|
Sponsors: |
Garcia |
|
Statewide Interest: |
The project will reduce pollutant loading in surface water and ground water |
|
Recipient: |
Town Miami Lakes |
|
Contact: |
Mariaelena Salazar |
|
|
6853 Main Street |
|
Contact Phone: |
(305) 364-6100 |
|
|
Miami Lakes 33014 |
|
Contact email: |
salazarm@townofmiamilakes.com |
|
Counties: |
Dade |
|
Gov't Entity: |
Yes |
Private Organization (Profit/Not for Profit): |
|
|
Project Description: |
Loch Ness Neighborhood - Installation of new and upgrading of existing storm water drainage system |
|
Is this a project related to a federal or state declared disaster? |
No |
|
Measurable Outcome Anticipated: |
Reduce flooding in the neighborhood and enhance water quality discharge into the C8 canal. |
|
Amount requested from the State for this project this year: |
$400,000 |
|
Total cost of the project: |
$800,000 |
|
Request has been made to fund: |
Construction |
|
What type of match exists for this project? |
Local |
|
Cash Amount |
$400,000 |
|
|
Was this project previously funded by the state? |
|
No |
|
Is future-year funding likely to be requested? |
|
No |
|
Was this project included in an Agency's Budget Request? |
|
No |
|
Was this project included in the Governor's Recommended Budget? |
No |
|
Is there a documented need for this project? |
Yes |
|
Documentation: |
Town Stormwater Master Plan |
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
|
Yes |
|
Hearing Body: |
Dade Delegation |
|
Hearing Meeting Date: |
11/30/2005 |
|
Is this a water project as described in Section 403.885, Laws of Florida? |
|
Yes |
Has the project been submitted to the Department of Environmental Protection? |
No |
Is this project eligible under section 403.885(5) F.S.? |
Yes |
|
Is your project addressed in a state, regional or local plan (such as a SWIM plan, Comprehensive Plan, local master plan, etc.)? |
Yes |
Name the plan and cite the pages on which the project is described: |
Local Master Plan |
|
If you are requesting funding for a stormwater or surface water restoration project: |
|
Which Water Management District has the jurisdiction of your project? |
|
South Florida Water Management District |
Have you provided at least 50% match? |
Yes |
|
Match Amount: |
400000 |
|
Match Source: |
Town Stormwater Utility |
|
Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? |
Yes |
|
Name of water body: |
Biscayne Bay |
|
Describe how it will reduce loadings, identify anticipated load reductions for total suspended solids, total nitrogen, total phosphorus, and other contaminants, and specify the practices that will be used to reduce loadings: |
Loading will be reduced by numerous water quality measures including exhilaration trenches, baffles, and sediment boxes. Expected pollutant load reduction to the C-8 Canal and ultimately Biscayne Bay for the Loch Ness project is: Total Suspended Solids=2378.3/kg/year; Total Phosphorus=23.9 kg/year; Total Nitrogen= 187.4 kg/year |
|
If you are requesting funding for a wastewater project: |
|
Does your project qualify for funding from DEP's 'Small Community Wastewater Treatment Grant Program' under section 403.1838 F.S.? |
No |
|
Other wastewater projects: |
|
Have you received previous legislative funding for this project? |
No |
|
Is the project under construction? |
No |
|
Have you provided at least a 25% local match? |
No |