|
Community Budget Issue Requests - Tracking Id #648 |
Cambridge Basin Drainage Improvements |
|
Requester: |
Ken Parker |
Organization: |
City of Port Orange |
|
Project Title: |
Cambridge Basin Drainage Improvements |
Date Submitted |
1/6/2006 4:03:22 PM |
|
Sponsors: |
Lynn |
|
Statewide Interest: |
Protection of Life and Property Service to the Community. |
|
Recipient: |
City of Port Orange |
|
Contact: |
Ken Parker |
|
|
1000 City Center Circle |
|
Contact Phone: |
(386) 506-5501 |
|
|
Port Orange, FL 32129 |
|
Contact email: |
kparker@port-orange.org |
|
Counties: |
Volusia |
|
Gov't Entity: |
Yes |
Private Organization (Profit/Not for Profit): |
|
|
Project Description: |
with the implementation of this project, port Orange plans to make major drainage and pond improvements in the Cambridge basin area of the community to alleviate flooding problems. A majority of the 5,000 homes in the basin were construction in the late 1970s before stormwater requirements, now commonplace, were established. During the 2004 hurricanes, some 200 homes were flooded in the basin. currently, the engineering plans for the North, South and Central improvements of the basin are complete. port Orange has already received the appropriate permits for the Northern Section and the South and Central permits are pending from the St. Johns River Water Management District. |
|
Is this a project related to a federal or state declared disaster? |
Yes |
If yes, which declared disaster? |
hurricane Season 2004-2005 |
If yes, which year? |
2004-2005 |
|
Measurable Outcome Anticipated: |
upon completion, Port Orange can efficently protect the lives and property by providing needed drainage and stormwater facilities for an area of Port orange that lacks any such improvements and suffered heavily from the hurricanes of 2004. |
|
Amount requested from the State for this project this year: |
$6,000,000 |
|
Total cost of the project: |
$12,000,000 |
|
Request has been made to fund: |
Construction |
|
What type of match exists for this project? |
Local |
|
Cash Amount |
$6,000,000 |
|
|
Was this project previously funded by the state? |
|
No |
|
Is future-year funding likely to be requested? |
|
No |
|
Was this project included in an Agency's Budget Request? |
|
No |
|
Was this project included in the Governor's Recommended Budget? |
No |
|
Is there a documented need for this project? |
Yes |
|
Documentation: |
SJRWMD Northern Coastal Basin Surface Water Improvement Plan |
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
|
Yes |
|
Hearing Body: |
Volusia Delegation Meeting |
|
Hearing Meeting Date: |
12/15/2005 |
|
Is this a water project as described in Section 403.885, Laws of Florida? |
|
Yes |
Has the project been submitted to the Department of Environmental Protection? |
No |
Is this project eligible under section 403.885(5) F.S.? |
Yes |
|
Is your project addressed in a state, regional or local plan (such as a SWIM plan, Comprehensive Plan, local master plan, etc.)? |
Yes |
Name the plan and cite the pages on which the project is described: |
SJRWMD Northern Coastal SWIM page 7 |
|
If you are requesting funding for a stormwater or surface water restoration project: |
|
Which Water Management District has the jurisdiction of your project? |
|
St. Johns River Water management District |
Have you provided at least 50% match? |
Yes |
|
Match Amount: |
12000000 |
|
Match Source: |
Drainage Bond |
|
Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? |
Yes |
|
Name of water body: |
Rose bay, and Outstanding Florida Water (OFW) |
|
Describe how it will reduce loadings, identify anticipated load reductions for total suspended solids, total nitrogen, total phosphorus, and other contaminants, and specify the practices that will be used to reduce loadings: |
|
|
If you are requesting funding for a wastewater project: |
|
Does your project qualify for funding from DEP's 'Small Community Wastewater Treatment Grant Program' under section 403.1838 F.S.? |
No |
|
Other wastewater projects: |
|
Have you received previous legislative funding for this project? |
No |
|
Is the project under construction? |
No |
|
Have you provided at least a 25% local match? |
No |