|
Community Budget Issue Requests - Tracking Id #855 |
City of Key West - United Street Basin Flood Reduction Project |
|
Requester: |
Morgan McPherson, Mayor |
Organization: |
City of Key West |
|
Project Title: |
City of Key West - United Street Basin Flood Reduction Project |
Date Submitted |
1/10/2006 8:44:43 AM |
|
Sponsors: |
Bullard |
|
Statewide Interest: |
The project protects homes from flooding and protects wetlands, near shore waters, Outstanding Florida Waters, and Florida Keys Reefs. |
|
Recipient: |
City of Key West, Utilities Department |
|
Contact: |
E. David Fernandez |
|
|
627 Palm Avenue |
|
Contact Phone: |
(305) 293-6414 |
|
|
Key West 33040 |
|
Contact email: |
dfernand@keywestcity.com |
|
Counties: |
Monroe |
|
Gov't Entity: |
Yes |
Private Organization (Profit/Not for Profit): |
|
|
Project Description: |
This project will install 900 linear feet of piping and two nutrient reduction baffle boxes to separate a stormwater collection system to reduce flooding and reduce pollution. One side of the system at a higher elevation is connected to a system virtually that is at a lower elevation. This allows water to flow from the higher elevations to the lower elevations rather than actually flow off the island. This contributes to the flooding affecting 90 homes in the United/Ashby basin which has significant repetitively flooded homes. The services to be provided by the project include engineering, construction management, pollutant discharge reduction devices, piping and inlets to separate the two systems. |
|
Is this a project related to a federal or state declared disaster? |
No |
|
Measurable Outcome Anticipated: |
Reduction of 75% of the pollutant loading of the stormwater treated. Reduction of flood staging during rain events. |
|
Amount requested from the State for this project this year: |
$400,000 |
|
Total cost of the project: |
$440,000 |
|
Request has been made to fund: |
Construction |
|
What type of match exists for this project? |
Local |
|
Cash Amount |
$ |
|
In-kind Amount |
$40,000 |
|
Was this project previously funded by the state? |
|
No |
|
Is future-year funding likely to be requested? |
|
No |
|
Was this project included in an Agency's Budget Request? |
|
No |
|
Was this project included in the Governor's Recommended Budget? |
No |
|
Is there a documented need for this project? |
Yes |
|
Documentation: |
LRPP, Agency Needs Assessment, NOAA FL Keys Natl Marine Sanctuary, SFWMD Basin, FDEP NPDES MS4 Prgm |
|
Was this project request heard before a publicly noticed meeting of a body of elected officials (municipal, county, or state)? |
|
Yes |
|
Hearing Body: |
City of Key West City Commission |
|
Hearing Meeting Date: |
12/04/2005 |
|
Is this a water project as described in Section 403.885, Laws of Florida? |
|
Yes |
Has the project been submitted to the Department of Environmental Protection? |
No |
Is this project eligible under section 403.885(5) F.S.? |
Yes |
|
Is your project addressed in a state, regional or local plan (such as a SWIM plan, Comprehensive Plan, local master plan, etc.)? |
Yes |
Name the plan and cite the pages on which the project is described: |
Key West Comprehensive Plan, Stormwater Management Plan |
|
If you are requesting funding for a stormwater or surface water restoration project: |
|
Which Water Management District has the jurisdiction of your project? |
|
South Florida Water Management District |
Have you provided at least 50% match? |
No |
|
Will this project reduce pollutant loadings to a water management district designated 'priority' surface water body? |
Yes |
|
Name of water body: |
Florida Bay |
|
Describe how it will reduce loadings, identify anticipated load reductions for total suspended solids, total nitrogen, total phosphorus, and other contaminants, and specify the practices that will be used to reduce loadings: |
|
|
If you are requesting funding for a wastewater project: |
|
Does your project qualify for funding from DEP's 'Small Community Wastewater Treatment Grant Program' under section 403.1838 F.S.? |
No |
|
Other wastewater projects: |
|
Have you received previous legislative funding for this project? |
No |
|
Is the project under construction? |
No |
|
Have you provided at least a 25% local match? |
No |