Skip to Navigation | Skip to Main Content | Skip to Site Map

MyFloridaHouse.gov | Mobile Site

Senate Tracker: Sign Up | Login

The Florida Senate

SB 1506: Electric Utilities [RPCC]

GENERAL BILL by Bennett

Electric Utilities [RPCC]; Requires a court to conduct a hearing no more than 120 days after an electric utility has filed a petition seeking to appropriate property necessary for an electric generation plant, an associated facility of such a plant, an electric substation, or a power line. Requires the court to issue its final judgment no more than 30 days after the hearing, etc.

Effective Date: Upon becoming law
Last Action: 5/2/2008 Senate - Died in Committee on Environmental Preservation and Conservation, Link/Iden/Sim/Compare passed, refer to HB 7135 (Ch. 2008-227)
Bill Text: Web Page | PDF

Expand All Collapse All

  • Bill History

    Date Chamber Action
    2/4/2008 Senate • Filed
    2/21/2008 Senate • Referred to Environmental Preservation and Conservation; Communications and Public Utilities; Community Affairs; General Government Appropriations
    3/4/2008 Senate • Introduced, referred to Environmental Preservation and Conservation; Communications and Public Utilities; Community Affairs; General Government Appropriations -SJ 00092
    5/2/2008 Senate • Died in Committee on Environmental Preservation and Conservation, Link/Iden/Sim/Compare passed, refer to HB 7135 (Ch. 2008-227)

    Top of SectionTop of Page

  • SB 1506, Original Filed Version (Current Bill Version) Posted 2/4/2008 at 9:47 AM

    Bill Text:   Web Page | PDF
    Analyses:   None

    Related Bills (2)

    Bill Number Subject Filed By Relationship Last Action and Location
    H 7135 (e2) Kreegel Compare Last Action: 6/25/2008 Approved by Governor; Chapter No. 2008-227; See also CS/HB 697 (Ch. 2008-191), CS/CS/CS/SB 1992 (Ch. 2008-176)
    Location:
    S 1544 (e1) Energy Conservation [RPCC] Saunders Compare Last Action: 4/30/2008 S Read 3rd time -SJ 00981; Amendment(s) adopted (903066, 856316, 849498, 832500, 746532, 705786, 687322, 663556, 538002, 469850, 464752, 394682, 306282, 251802, 250992, 212736, 177142, 152886) -SJ 00984; Was taken up -SJ 00993; Substituted HB 7135 -SJ 00995; Laid on Table, Link/Iden/Sim/Compare passed, refer to CS/HB 697 (Ch. 2008-191), HB 7135 (Ch. 2008-227) -SJ 00995
    Location:

    Citations - Statutes (18)

    Citation Catchline Location in Bill Location In Bill Help
    74.051 Hearing on order of taking.
    186.801 Ten-year site plans.
    253.02 Board of trustees; powers and duties.
    253.034 State-owned lands; uses.
    337.401 Use of right-of-way for utilities subject to regulation; permit; fees.
    366.93 Cost recovery for the siting, design, licensing, and construction of nuclear and integrated gasification combined cycle power plants.
    380.23 Federal consistency.
    403.031 Definitions.
    403.504 Department of Environmental Protection; powers and duties enumerated.
    403.506 Applicability, thresholds, and certification.
    403.50665 Land use consistency.
    403.5081
    403.509 Final disposition of application.
    403.5115 Public notice.
    403.5175 Existing electrical power plant site certification.
    403.518 Fees; disposition.
    403.519 Exclusive forum for determination of need.
    403.814 General permits; delegation.

    Top of SectionTop of Page